r' MONTHLY REPORT NO. 68 FOR FEBRUARY 1979 THERHAL AND BIOLOGICAL MONITORING PROGRAMS PEACH BOTTOM ATONIC POWER STATION UNITS NO. 2 AND 3 Due to severe icing conditions, thermograph servicing and boat surveys could not be performed during the month of February, 1979. The analysis for this period will be submitted shortly after conditions permit retrieval of the thermal data.
The daily river flows as measured at Holtwood Hydro-electric Station and the daily generation at PBAPS in thermal megawatts for the reporting period are presented in Table 1.
2279 184 Revised 6/6/79 7 906140 Y0%.
e r
TABLE 1 MLLThCCC CA1LY FLCWSICFE) ANC DAILY THERMAL MEGAWATTS-FEERLARY 1979 cts YEAR
.v C N T H DAY HW_ FLOW MW_ THERM 1
79 2
1 65100 6579 2
79 2
2 55500 6568 3
79 2
3 46900 5799 4
79 2
4 44300 6477 5
79 2
5 33800 6563 6
79 2
6 22200 6583 7
79 2
7 22300 6583 8
79 2
8 23200 6583 9
79 2
9 22900 6274 10 79 2
10 19600 3460 11 79 2
11 17500 3288 12 79 2
12 16900 3293 13 79 1
13 15700 3293 14 79 2
14 16400 3500 15 79 2
15 15700 5204 16 79 2
16 14800 5951 17 79 2
17 14900 5636 18 79 2
18 15400 6396 19 79 2
19 14200 6510 2C 79 2
20 15C00 6543 21 79 2
21 16200 6564 22 79 2
22 16300 6572 23 79 2
23 18500 6511 24 79 2
24 34600 6239 25 79 2
25 104500 6406 26 79 2
26 2C2800 6552 27 79 2
27 213100 6558 28 79 2
26 165200 6578 2279 185