ML19259C246
| ML19259C246 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/08/1979 |
| From: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML19259C247 | List: |
| References | |
| NUDOCS 7906140459 | |
| Download: ML19259C246 (2) | |
Text
.
MONTHLY REPORT NO. 67 FOR JANUARY 1979 THERMAL AND BIOLOGICAL MONITORING PROGRAMS PEACH BOTTOM ATOMIC POWER STATION UNITS NO. 2 AND 3 Due to severe icing conditions, thermograph servicing and boat surveys could not be performed during the month of January, 1979.
The analysis for this period will be submitted shortly after conditions permit etrieval of the thermal data.
The daily river flows as measured at Holtwood Hydro-electric Station and the daily generation at PBAPS in thermal megawatts for the reporting period are presented in Table 1.
2279 182 Revised 6/6/79 7 006140 /fI$7 l
TABLE 1 HCLTWCCD CAILY FLCWS(CFS) AND DAILY THERMAL MEGAWATTS-JAN 1979 LES YEAR MONTH DAY HW_ FLOW Md_ THERM 1
79 1
1 24300 6469 2
79 1
2 41800 6467 3
79 1
3 152800 6369 4
79 1
4 236900 6373 5
79 1
5 188500 62C2 6
79 1
6 136300 3375 7
79 1
7 103600 3293 5
79 1
8 99700 3252 9
79 1
9 102800 3269 10 79 1
10 83500 3193 11 79 1
11 69700 3293 12 79 1
12 54600 3122 13 79 1
13 43200 3827 1.'.
79 1
14 41200 4126 15 79 1
15 41000 4646 le 79 1
16 41000 5428 17 79 1
17 37700 6235 16 79 1
18 35800 6571 19 79 1
19 32100 6136 20 79 1
20 29600 6572 21 79 1
21 50700 6575 22 79 1
22 75100 6577 23 79 1
23 69200 6570 24 79 1
24 103300 6581 25 79 1
25 261600 6582 2e 79 1
26 264500 6585 27 79 1
27 213700 6582 28 79 1
28 182600 4607 29 79 1
29 128200 4464 30 79 1
30 93000 6028 31 79 1
31 77100 6536 2279 183