- 05000289/LER-1978-010, Forwards LER 78-010/01T-0 + (15:04:40, 3 January 2025)
- 05000289/LER-1978-011-03, /03L-0:on 780318,snubber MS-201 Found W/No Fluid in Reservoir.Caused by Pinched Rod Wiper Seal + (15:04:49, 3 January 2025)
- ML19261F234 + (15:04:53, 3 January 2025)
- ML19261F233 + (15:04:54, 3 January 2025)
- 05000289/LER-1978-012-03, /03L-0:on 780406,during Functional Tests,One Snubber DHH-187 Would Not Lock Up Upon Compression.Cause Undetermined.Valve Block Replaced & Satisfactory Test Made + (15:04:56, 3 January 2025)
- ML19261F230 + (15:04:57, 3 January 2025)
- ML19261F229 + (15:04:58, 3 January 2025)
- 05000289/LER-1978-012, Forwards LER 78-012/03L-0 + (15:05:00, 3 January 2025)
- ML19261F226 + (15:05:01, 3 January 2025)
- ML19261F225 + (15:05:01, 3 January 2025)
- 05000289/LER-1978-013-01, /01T-0:on 780413,B&W Informed Util That Small Break on Reactor Coolant Pump Discharge Had Not Been Analyzed in Fsar.Procedures to Be Revised & Operators to Be Trained in Response to Small Break LOCA + (15:05:03, 3 January 2025)
- ML19261F223 + (15:05:05, 3 January 2025)
- ML19261F220 + (15:05:07, 3 January 2025)
- ML19261F219 + (15:05:08, 3 January 2025)
- ML19261F218 + (15:05:08, 3 January 2025)
- ML19261F216 + (15:05:09, 3 January 2025)
- ML19261F213 + (15:05:10, 3 January 2025)
- 05000289/LER-1978-015-01, /01T-0:on 780502,during Initial Cycle 4 Startup, Control Rods Found Positioned in Restricted Region Per Tech Specs 3.5 for 9-h.Caused by Use of Incorrect Rod Index Limit Curve in Procedure.Documentation Procedures Revised + (15:05:11, 3 January 2025)
- ML19261F211 + (15:05:12, 3 January 2025)
- ML19261F210 + (15:05:13, 3 January 2025)
- 05000289/LER-1978-015, Forwards LER 78-015/01T-0 + (15:05:15, 3 January 2025)
- ML19261F207 + (15:05:16, 3 January 2025)
- ML19261F206 + (15:05:16, 3 January 2025)
- 05000289/LER-1978-016-01, T-0:on 780503,B&W Identified That for Cycle 4, Peak RCS Pressure Following Accident Exceeds Max Allowable Pressure by 4.4 Psig.Caused by Assuming Larger Instrument Error Associated W/Pressure Sensor.Tech Spec to Be Changed + (15:05:18, 3 January 2025)
- ML19261F204 + (15:05:19, 3 January 2025)
- 05000289/LER-1978-016, Forwards LER 78-016/01T-0 + (15:05:23, 3 January 2025)
- ML19261F199 + (15:05:25, 3 January 2025)
- ML19261F201 + (15:05:25, 3 January 2025)
- 05000289/LER-1976-046-01, /01T:on 761213,concentration of Boric Acid in Borated Water Storage Tank Fell Below Specified Minimum. Caused by Water Leakage from Decay Heat Removal Sys,Which Diluted Borated Water in Storage Tank + (15:05:27, 3 January 2025)
- 05000289/LER-1978-018-01, /01T-0:on 780519,two Restraints Found Not Installed on Emergency Feedpump Turbine Main Steam Supply Line Relief Valves MC-V22A/B Per Drawing.Caused by Improper Const.Nonessential Access Restricted to Relief Valve Area + (15:05:31, 3 January 2025)
- ML19261F196 + (15:05:32, 3 January 2025)
- 05000289/LER-1976-046, Forwards LER 76-046/01T.Provides Supplemental Info + (15:05:34, 3 January 2025)
- ML19261F193 + (15:05:35, 3 January 2025)
- 05000289/LER-1978-018, Forwards LER 78-018/01T-0 + (15:05:37, 3 January 2025)
- ML19261F190 + (15:05:38, 3 January 2025)
- 05000289/LER-1978-019-03, /03L-0:on 780605,while Performing Procedure Sp 1303-5,control Fuse Opened & Valve RB-V-7 Did Not Operate.Caused by Failure of Voltage Spike Suppressor Across Coil of Auxiliary Relay,Causing Short Circuit + (15:05:39, 3 January 2025)
- ML19261F188 + (15:05:41, 3 January 2025)
- 05000289/LER-1978-019, Forwards LER 78-019/03L-0 + (15:05:42, 3 January 2025)
- ML19261F184 + (15:05:44, 3 January 2025)
- 05000289/LER-1978-020-01, /01T-0:on 780614,seven of Nine Control Rods in Group 3 Inadvertently Dropped Into Core,Causing Operation W/More than One Inoperable Rod.Caused by Shorted Diode in DC Hold Secondary Power Supply.Fuses & Diode Replaced + (15:05:45, 3 January 2025)
- ML19261F182 + (15:05:47, 3 January 2025)
- 05000289/LER-1978-020, Forwards LER 78-020/01T-0 + (15:05:48, 3 January 2025)
- ML19261F179 + (15:05:49, 3 January 2025)
- ML19261F177 + (15:05:50, 3 January 2025)
- ML19261F178 + (15:05:50, 3 January 2025)
- 05000289/LER-1977-001-01, /01T:on 770203,w/diesel Generator B Out of Svc,A Generator Was Lost,Causing Operation at Limiting Condition Less Conservative than Tech Specs.Generator a Out of Svc Due to Binding of Oil Pressure Low Speed Switch + (15:05:52, 3 January 2025)
- 05000289/LER-1976-045-03, /03L:on 761028,monitor RM-A2 Removed from Svc for Repair,Forcing Operation in Degraded Mode Per Tech Specs.Monitor Design Flow Allows Condensation Due to Heat Differential Between Reactor Bldg & Intermediate Bldg + (15:05:54, 3 January 2025)
- 05000289/LER-1976-045, Forwards LER 76-045/03L.Provides Supplemental Info + (15:05:59, 3 January 2025)
- 05000289/LER-1977-001, Forwards LER 77-001/01T.Provides Supplemental Info + (15:06:01, 3 January 2025)
- 05000289/LER-1976-042, Supplements LER 76-42/1P Describing Concrete Pipe Installations Not Included in Fsar.Met Ed Considers All Lines Repaired on North Side of Screen House Seismically Qualified & safety-related Lines Fully Operational + (15:06:03, 3 January 2025)
- 05000289/LER-1976-040, Provides Supplemental Info to LER 76-40/3L.Leakage from DH-V-1 Valve Immediately Stopped & Repaired within 48-h. Airborne Activity Below Levels Necessitating Respiratory Protection.Personnel Wore Breathing Masks at First Entry + (15:06:05, 3 January 2025)