Notifies That Stress Calculations by River Water Pump Vendor May Not Account for Both Flange Bolting & Seismic Forces. Problem to Be Resolved at 761025 Meeting
ML19261F229
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/19/1976
From: Arnold R
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 7910250653
Download: ML19261F229 (2)


Text

.

NRC sonu 195 u.s. NUCLE AR REGULATORY C.

AISsioN ooCKET NUM BE R irae w

/

60-299 NRC DISTR;'odTION FoR PART 50 DOCKET MATERI AL 7; CIDb" REPOR'r TO:

Mr Reid FROM:Metcopolitan Edison Co oATE or oogu[g,76 Reading, Pa R C Arnold oATE REcEivEo 10-21-76

$ LETTER O N oToRIZE o PROP INPUT FORM NUMBER oF COPIES RECEIVEo MoRioiN AL Eusc LAssimiE o Ocorv one signed oESCRIPTioN ENC LoSU RE Ltr furnishing info concerning an incident re flange bolting forces & seismic forces stress specifications.......

PIANT NAIE:

NOTE:

IF PERSONNEL EXPOSURE IS INVOLVED Three Mile Island #1 SEND DIRECTLY TO KREGER/J.. COLLINS FOR ACTION /INFORMATION 10-23-76 ehf ERAHC6 CHI U:

f4 i d.,

if/3 CYS 10R ACTION LIC. ASST.:

Zn < ya m W/ / CYS -

ACRS /6 CYS "C'T~-/SEIT' 10 IA INTERNAL DISTRIBUTION

' %TL FILE J NRC PDR I & E (2)

MIPc '

SCHROEDER/IPPOLI'IO HOUSTON NOVAK/CEECK GRIMES CASE BJTLER HANAUER TEDECCO/MACCARY EISENHUT

__PAER SHAO VOLDER/BJNCH KR5iiER/J. COLLINS EXTERNAL DISTRIOUTION CONTROL NUMBER LPDR: j4a,n 5 hs.s, Fe wC:

1481 204 nac1 ggg g

~

910250 $;5 3 _

p

^*

ffM C/< ocas

  • /.Gk AnVER W NOG *fSS METROPOLITAN EDISON COMPANY w

-:1 m:

u-- :=

~

POST OFFICE BOX $42 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929 3601 October 19, 1976 GQL 1h80 Director of Nuclear Reacter Regulatien Att: Ecbert 'd.

Reid, Chief Cperating Reactor Branch No. k U. S. Nuclear Regulatory Cc==ission q:.

'4ashington, DC 20555 N.N Lear Sir:

Three Mile Nuclear Station Unit 1 (*MI-1)

Docket No. 50-289 Operating License EPR 50 Recently a situation was discovered which, although n3t censidered reportable, may be of interest to ycu.

A review cf the column flange design of the T:E-1 River '4ater Pumps reveal that the manufacturer's stress calculatiens may have not properly acccunted fcr both flange bolting forces and seis=ic forces. A meeting with the man't-facturer has been requested for the week of October 25, 1976, to resolve this probles.

'de vill keep you informed concerning the results of this investigatien.

Sincerel,

I

(

l

/

R. C. A n ld

\\

Vice President

\\

J-,Q RCA:JJM:daf

/

1481 205

>