ML19261F229
| ML19261F229 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/19/1976 |
| From: | Arnold R METROPOLITAN EDISON CO. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7910250653 | |
| Download: ML19261F229 (2) | |
Text
.
NRC sonu 195 u.s. NUCLE AR REGULATORY C.
AISsioN ooCKET NUM BE R irae w
/
60-299 NRC DISTR;'odTION FoR PART 50 DOCKET MATERI AL 7; CIDb" REPOR'r TO:
Mr Reid FROM:Metcopolitan Edison Co oATE or oogu[g,76 Reading, Pa R C Arnold oATE REcEivEo 10-21-76
$ LETTER O N oToRIZE o PROP INPUT FORM NUMBER oF COPIES RECEIVEo MoRioiN AL Eusc LAssimiE o Ocorv one signed oESCRIPTioN ENC LoSU RE Ltr furnishing info concerning an incident re flange bolting forces & seismic forces stress specifications.......
PIANT NAIE:
NOTE:
IF PERSONNEL EXPOSURE IS INVOLVED Three Mile Island #1 SEND DIRECTLY TO KREGER/J.. COLLINS FOR ACTION /INFORMATION 10-23-76 ehf ERAHC6 CHI U:
f4 i d.,
if/3 CYS 10R ACTION LIC. ASST.:
Zn < ya m W/ / CYS -
ACRS /6 CYS "C'T~-/SEIT' 10 IA INTERNAL DISTRIBUTION
' %TL FILE J NRC PDR I & E (2)
MIPc '
SCHROEDER/IPPOLI'IO HOUSTON NOVAK/CEECK GRIMES CASE BJTLER HANAUER TEDECCO/MACCARY EISENHUT
__PAER SHAO VOLDER/BJNCH KR5iiER/J. COLLINS EXTERNAL DISTRIOUTION CONTROL NUMBER LPDR: j4a,n 5 hs.s, Fe wC:
1481 204 nac1 ggg g
~
910250 $;5 3 _
p
^*
ffM C/< ocas
- /.Gk AnVER W NOG *fSS METROPOLITAN EDISON COMPANY w
-:1 m:
u-- :=
~
POST OFFICE BOX $42 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929 3601 October 19, 1976 GQL 1h80 Director of Nuclear Reacter Regulatien Att: Ecbert 'd.
Reid, Chief Cperating Reactor Branch No. k U. S. Nuclear Regulatory Cc==ission q:.
'4ashington, DC 20555 N.N Lear Sir:
Three Mile Nuclear Station Unit 1 (*MI-1)
Docket No. 50-289 Operating License EPR 50 Recently a situation was discovered which, although n3t censidered reportable, may be of interest to ycu.
A review cf the column flange design of the T:E-1 River '4ater Pumps reveal that the manufacturer's stress calculatiens may have not properly acccunted fcr both flange bolting forces and seis=ic forces. A meeting with the man't-facturer has been requested for the week of October 25, 1976, to resolve this probles.
'de vill keep you informed concerning the results of this investigatien.
Sincerel,
I
(
l
/
R. C. A n ld
\\
Vice President
\\
J-,Q RCA:JJM:daf
/