Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19263C433 + (13:01:00, 3 January 2025)
- ML19263C434 + (13:01:00, 3 January 2025)
- ML19263C432 + (13:01:01, 3 January 2025)
- ML19263C431 + (13:01:02, 3 January 2025)
- ML19263C430 + (13:01:03, 3 January 2025)
- ML19263C429 + (13:01:04, 3 January 2025)
- 05000325/LER-1979-003-03, /03L-0 on 790117:steamline Low Pressure Isolation Instrument Actuated Below Tech Spec Min.Caused by Loose Clamp Block Allowing Instrument Torque Shaft to Slip + (13:01:05, 3 January 2025)
- 05000325/LER-1979-003, Forwards LER 79-003/03L-0 + (13:01:07, 3 January 2025)
- ML19263C425 + (13:01:08, 3 January 2025)
- ML19263C424 + (13:01:09, 3 January 2025)
- ML19263C422 + (13:01:10, 3 January 2025)
- ML19263C420 + (13:01:10, 3 January 2025)
- ML19263C419 + (13:01:11, 3 January 2025)
- ML19263C418 + (13:01:13, 3 January 2025)
- ML19263C416 + (13:01:14, 3 January 2025)
- ML19263C415 + (13:01:14, 3 January 2025)
- ML19263C413 + (13:01:15, 3 January 2025)
- ML19263C412 + (13:01:16, 3 January 2025)
- ML19263C411 + (13:01:16, 3 January 2025)
- ML19263C409 + (13:01:17, 3 January 2025)
- ML19263C407 + (13:01:17, 3 January 2025)
- ML19263C406 + (13:01:18, 3 January 2025)
- ML19263C405 + (13:01:19, 3 January 2025)
- ML19263C403 + (13:01:20, 3 January 2025)
- ML19263C402 + (13:01:20, 3 January 2025)
- ML19263C401 + (13:01:22, 3 January 2025)
- ML19263C399 + (13:01:23, 3 January 2025)
- ML19263C398 + (13:01:23, 3 January 2025)
- ML19263C397 + (13:01:24, 3 January 2025)
- ML19263C396 + (13:01:24, 3 January 2025)
- ML19263C395 + (13:01:25, 3 January 2025)
- 05000317/LER-1979-001-01, /01X-0 on 790209:during Normal Operation, Determined That License Submittal for Operation at 2,700 Mwt Failed to Indicate That Credit for One Charging Pump Was Taken in Small Break LOCA Analysis.Cause Forthcoming + (13:01:26, 3 January 2025)
- ML19263C392 + (13:01:29, 3 January 2025)
- ML19263C389 + (13:01:30, 3 January 2025)
- ML19263C388 + (13:01:30, 3 January 2025)
- ML19263C387 + (13:01:31, 3 January 2025)
- ML19263C385 + (13:01:31, 3 January 2025)
- ML19263C384 + (13:01:32, 3 January 2025)
- ML19263C378 + (13:01:40, 3 January 2025)
- ML19263C369 + (13:01:43, 3 January 2025)
- 05000302/LER-1979-007, Forwards LER 79-007/03L-0 + (13:01:45, 3 January 2025)
- ML19263C363 + (13:01:46, 3 January 2025)
- 05000237/LER-1979-005-03, /03L-0 on 790119: During Normal Operation, Mass Spectometer Leak Detector Downscale Condition Annunciated & High Rad Alarm & Half Scram Occurred Twice on Same Day. Log Rad Monitor Replaced + (13:01:47, 3 January 2025)
- ML19263C361 + (13:01:48, 3 January 2025)
- 05000333/LER-1979-005-04, /04L-0 on 790124: Apparent Excessive Solution Release from Makeup Water Treatment Waste Neutralizer Tanks to Circulating Water Discharge Tunnel Noted.Calculations Show Tech Specs Not Exceeded + (13:01:50, 3 January 2025)
- ML19263C359 + (13:01:52, 3 January 2025)
- 05000333/LER-1979-005, Forwards LER 79-005/04L-0 + (13:01:53, 3 January 2025)
- ML19263C355 + (13:01:54, 3 January 2025)
- ML19263C353 + (13:01:55, 3 January 2025)
- 05000344/LER-1979-001-03, /03L-0 on 790119: Operability of 125 Volt DC Electrical Sys Not Verified Per Tech Specs.Caused by Personnel Error + (13:01:57, 3 January 2025)
- 05000366/LER-1979-011-03, /03L-0 on 790117:during Normal Startup Test & Reactor in Cold Shutdown,Review of HNP-2-3160 (RHR Pump Operability) Revealed Required Flow Not Being Met.Caused by Procedural Error by Personnel + (13:01:58, 3 January 2025)
- ML19263C350 + (13:02:00, 3 January 2025)