Monthly Operating Rept for Jan 1979.W/encl Refueling Info
ML19263C415
Person / Time
Site: Pilgrim
Issue date: 02/08/1979
From: Mathis C
BOSTON EDISON CO.
To:
Shared Package
ML19263C414 List:
References
NUDOCS 7902220082
Download: ML19263C415 (6)


Text

..

OPERATING DATA REPORT 50-293 DOCKET NO.

DATE 2/8/79 CO.\\tPLETED BY C.T.Mathis TELLPfl0NE W-- /46-/900 OPER AT!NG C.TATUS

1. Unit Name:
2. Reporting Period: --

January, 1979 1998*

3. Licensed Thermal Pov.u (.\\1Wt):

678*

4. Nameplate Rating (Gross StWe):

bn.

5. Design Electrical Rating (Net MWe):

690.

6. Sfaximum Dependable Capacity (Gross MWe):

670.

7. 51asimum Dependable Capacity (Net 51We):
8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Gise Reasons:

NONE

9. Power Level To Which Restricted.lf Any (Net 51We):

NONE

10. Reasons For Restrictions. If Any:

N.A.

This Month Yr.-to.Date Cumula t..e 744.0 744.0 53880.0

11. Ilours in Reporting Period
12. Number of !!ours Reactor Was Critical 744.0 744.0 37791.7
13. Reactor Rescre Shutdown !!ours 0.0 0.0 0.0
14. Hours Generator On.Line 744.0 744.0 36466.6
15. Unit Reserve Shutdown liours 0.0 0.0 0.0 - _ _

1478904.0 1478904.O 59920704.0

16. Gross Thermal Energy Generated (51WH)
17. Gross Electrical Energy Generated (MWil) 508640.0 489499.0 18851063.0 508640.0 19639114.0
18. Net Electiical Energy Generated (MWH) 489499.0
19. Unit Service Factor 100.0 100.0 67.7 ~
20. Unit Av.ilability Factor 100.0 100.0 67./
21. Unit Capacity Facter (thing MDC Net) 98.2 98.2 52.2
22. Unit Capacity Factor (Ilsing DER Net) 100.4 100.4 53.4
23. Unit Forced Outage Rate 0.0 0.0 10.5
24. Shutdov.ns Schedt.r d Over Next 6 Months (Type. Date and Duration of Each):

e NONE

25. If Shut Do-n At End Of Report Period. Estimated Date of Stutup:

UNIT OPERATING

h. Units in Tc:.t Status tPoor to Commercial Operation 1:

Forecast Achined INilIAL CRIT CAI.lTY INillAL ELECTRICITY COMMERCl.\\L OPER ATION (0/~ 7 )

790222005.2

.........~..

e AVERAGE Dajty UNIT POWEl: LEVEL 50'ASO DOCI:ET NO.

PILGRIM I UNIT Al0llO DATE CO\\fPLETE D 13y C.J.Mathia TELEPil0NE 617-746-7900 510NTil January, 1979 DAY AVER AGE Dally POWER LEVEL DAY AVER AGE Dally POWER LEVEL Of he-Ner !

(3twe.xeg, 660.

662.

I 17 2

660.

661.

18 3

660.

661.

19 660.

651.

4 20 5

662.

661.

yj 66I.

6 661.

22 661.

7 661.

23

662, 3

24

662, 9

584.

25 661.

10

658, 26 662.
j 659.

27

661, 661.

12 23 662.

13 660.

29 659.

II 660.

30 661.

15 I*

31 662.

16 INSTR UCITO.N S On th:s l'ernat. ho the ne,w, g g 0 UCJIJH WIlclJ ri;.3 3 g g-~

  1. I Ulf! ifl $lWe.Ne{ (gg e 4 4" J.s in the repiirur imig %

im77 3

~

\\

i 1

50-293 UNITSliUTDOWNS AND POWER REDUCTIONS DCCKET NO.

UNil N AME Pilgrim I I: ATE

?/8/79 REPO.".T MONTil Janu ry, 1979 COMPLE1 ED ;1Y C.J.Mathis T ELI l'i!ONE 617-746-7900 I

=

=-

'L o ? -,

f c

li '"5CC 5't g4 Cause & Corrective

s.,'

p,, '.

9 5E E

Ea 2

2 25 3

-5 5 m h*CD'

~?

"- l Acnon to g5j Report

  • Wu 8'

Present itecurrence 50 V

o I

2 3

4 F: Fo r t ed Reason:

Method:

Exhibit G - Instsuctions S. S hcJuled A E.itupinent Failure (Explain) 1 -Man ual for Picparation of Data

!!-Maintenance of Test 2 Manual Serain.

Entry Sheets for I.icensee C Itefechng 3-Aulomatic Scrain.

Esent 1:epor t i t.ER) I ile INilREG-D-R gulatory Restriction 4-Ot her (1:xplain) 0161) l G wrato Training & l.icense Ewnination e

I - AJ un nist r al r.,

5 G-Up. raisuaal I i vor ( E x plain )

Exinbit I Saine Source (9/77)

Il Other (thplain) b

L 0

D E

L T

3 A

0

/

C 7

O 5

S 0

S A

8 7

e N-h Om t

I n

Tp o

C y, A

1

-r Ey Vp I

T--

Em A.

C-Rer N

Ry O,

Cn m

E f

N C O N I

A E

l T N C

ei A E N

no T T A

i S N N

L w I

E e

d n R A T

e E M N

J rn I

e ii C D A

a P E M

pt T

eu R A R p A L E E L R l

C e

U Y g

N T a

E g

M F E

I A

S n

s ee R S U

k n G

A oi L R C

rl I 0 B

P : 3 N

O I

T l

C i

N O

U f

F o

LA s

M s_

o L

TN I

EN C

P C

H

?X CC

!1l!'

Ii M

3 E

~

2 T

S

(

REFUELING INFOLD!ATION

'lhe following refuelin,', Informat. ion is included in t.be Monthly Report as rqquented in a letter to Mr. G. C. Andognini dated January 18, 1978.

For your convenience, the information supplied has been enumeratet' to that cach number corresponds to equivalent notation utilized in the request.

1 The name of this facility is Pilgrim Nuclear Power Station, Docket No. 50-293 2

Scheduled date for next P.efueling Shutdown:

January 1980 3.

Scheduled date for restart following refueling:

April, 1980 4.

5.

Due to their similarity, requests 4, 5 & 6 are responded to collectively-6 The fuel, which is presently expected to be loaded during the next scheduled shutdown, may be reload fuel ot a neu design and may therefore require a proposed license submittal and technical speci fication changes.

It is not possible, however, to supply pertinent information on dates.

As information concerning fuel design, core configuration, Operational Review Committee determinatiens, proposed licensing action, and technical specification submittals becomes available, it will be forwarded to you.

7 (a)

There are 580 fuel assemblics in the core, (b)

There are 580 fuel assemblies in the spent fuel pool.

v-8 (a)

The station is presently licensed to store 2320 spent fuel assemblies.

The actual spent fuel storage capacity is 1160 fuel assemblies and new high density fuel storage racks are in the process of being installed.

(b)

The planned spent fuel storage capacity is 2320. fuel assemblics.

9.

With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 580 fuel assemblies (one core).

G

BOSTON EDISO'1 COMPANY PILGRIM NUCLEAR POWER STAT 70N DOCKET NO. 50-203 SUFNARY OF OPERATIONS FOR JANUARY, 1979 The month of January, 1979 began with the unit operating at 100% power.

The unit remained at 100% power level until 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> on January 25, 1979, at which time a power reduction was necessary due to a high condenser di T.

This was the direct result of a severe storm which resulted in extremely heavy seas which caused seaweed to foul our main condenser tube sheets. At 1936 hours0.0224 days <br />0.538 hours <br />0.0032 weeks <br />7.36648e-4 months <br />, Operations personiel began backwashing the main condenser and at 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> the condenser backwash was completed and the reac tor power level was increased to 100%.

The unit remained at 100% power for the remainder of the month.

The Capacity Factor for the month was 98.2% with 100% availability.