as Result of 790125-26 Meeting,Core Boring Program Is Underway to Obtain Addl Soil Samples for Liquefaction Analysis.Will Develop Program for Stability Improvement If Necessary.Will Complete Activities by 790430
ML19263C395
Person / Time
Site: Beaver Valley
Issue date: 02/12/1979
From: Dunn C
DUQUESNE LIGHT CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
TAC-6605, NUDOCS 7902220057
Download: ML19263C395 (3)


Text

.

. f m

(412) 471-4300 435 Sixth Avenue Qtpb,urgh, Pennsylvania February 12, 1979 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Ccamission Attention: A. Schwencer, Chief Operating Reactors, Branch No. 1 Division of Operating Reactors Washington, D. C. 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Response to January 9, 1979 Request For Additional Information Gentlemen:

As a result of a meeting held at the Beaver Valley site on January 25 and 26, 1979 between members of your s taff and representatives of the Duquesne Light Company, the Duquesne Light Company is undertaking the following actions.

A core boring program is presently underway to obtain additional samples of the soils in the area of the station Turbine Building. Based upon the analysis of these core borings, a liquifaction analysis shall be performed. A stability analysis shall be performed should the results of the liquifaction analysis indicate that a potential for liquifactior.

exists.

If indicated, a. program to improve the stability of the soil in the area of the Turbine Building and a schedule for its implementation shall be prepared.

These activities should be completed by April 30, 1979.

We have instituted an administrative control that requires station management to notify the Division of Operating Reactors and the Office of Inspection and Enforcement when the river elevation reaches 674 feet above MSL. The action statement of Appendix A, Technical Specification 3.7.6.la will be implemented at river elevation 680 feet above Mean Sea Level.

/

7902220657

/>

Beaver ValJcy Power Station, Unit No. 1 Docket No. 50-334 Response to January 9, 1979 Request For Additional Information Page This administrative control will remain in effect and will not be modified without the approval of the Division of Operating Reactors until this matter is fully resolved.

Very truly yours, b /'/baa w C. N. Dunn Vice President, Operations CC: Mr. B. 11. G rie r , Director United States Nuclear Regulatory Commission Region 1 Office 631 Park Avenue King of Prussia, PA 19406

(CORPORATE SEAL)

Attest:

w!? ff/W H.W. Staas Secretary COMMONWEALTH OF PENNSYLVANIA)

) SS:

COUNTY OF ALLEGHENY )

On this / J ' ~,, day of / 9 V R s M v' , 1979, before me, DONATM W WAMWmr , a Notary Public in and for said Common-wealth and County, personally appeared C. N. Dunn, who being duly sworn, deposed, and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, information and belief.

\

/

q /'! ,~n e-( /W, 4x3/ / r/ ~<-~ u

'X)NALD '. ' SHANNON thtary PLtisc httsburg. , Nfegherty Co., Pa.

My Commission Empires hne 7,1973