TEXAS UTILITIES GENERATING COMinNY 2004 BHYAN TOWE14
" :::::l **"':l:'
Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76011 50-446 COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION INSTALLATION OF PIPE ELB0WS IN STEAM GENERATORS LOOP PIPING INTERIM RESPONSE FILE N0. 10110
Dear Mr. Seidle:
On January 17, 1979, we verbally informed your Mr. R. G. Taylor, CPSES Resident Inspector, of a deficiency in regard to installation of pipe elbows c innecting the steam generators to the cross-over leg piping. We considered this "potentially" reportable under 10 CFR 50.55(e).
We are continuing our investigation and evaluation and will notify you as soon as we have reached a conclusion.
Very truly yours, R. J. Gary RJG:dla cc:
NRC Region IV - (0 + 1 copy)
Directcr, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 7902220 09o