Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19269E419 + (11:32:47, 3 January 2025)
- ML19269E418 + (11:32:48, 3 January 2025)
- ML19269E416 + (11:32:48, 3 January 2025)
- ML19269E415 + (11:32:49, 3 January 2025)
- ML19269E414 + (11:32:50, 3 January 2025)
- ML19269E413 + (11:32:51, 3 January 2025)
- ML19269E412 + (11:32:52, 3 January 2025)
- 05000302/LER-1979-054-01, /01T-0 on 790615:cracks in 4,160 Volt Emergency Sys Nonsegregated Bus Insulation Sleeving Observed.Caused by Incompatibility Between Lexan Sleeving Matl & Versa-Fab Varnish Tape.Cracks Repaired W/Recommended Tape + (11:32:54, 3 January 2025)
- ML19269E410 + (11:32:55, 3 January 2025)
- 05000302/LER-1979-054, Forwards LER 79-054/01T-0 + (11:32:57, 3 January 2025)
- ML19269E406 + (11:32:58, 3 January 2025)
- ML19269E407 + (11:32:58, 3 January 2025)
- 05000325/LER-1979-027-03, /03L-1 on 790503:reactor Core Isolation Cooling Inboard Steam Isolation Valve 1-ES1-F007 Would Not Open. Cause Not Ascertained.Breaker for F007 Valve Cycled Several Times Locally & Auxiliary Contacts Cleaned + (11:32:59, 3 January 2025)
- 05000325/LER-1979-027, Forwards LER 79-027/03L-1 + (11:33:04, 3 January 2025)
- ML19269E402 + (11:33:05, 3 January 2025)
- 05000219/LER-1979-019-03, /03L-0 on 790526:reactor High Pressure Isolation Condenser Initiation Switch RE-15A Tripped at 3 Psig Greater than Specified.Caused by Instrument repeatability.RE-158 Reset to Trip at 1,068 Psig + (11:33:06, 3 January 2025)
- ML19269E399 + (11:33:07, 3 January 2025)
- ML19269E398 + (11:33:08, 3 January 2025)
- 05000219/LER-1979-019, Forwards LER 79-019/03L-0 + (11:33:09, 3 January 2025)
- 05000277/LER-1979-028-03, /03L-0 on 790524:redundant Low Level HPCI Start Signal from LSL-2-3-72C Found Inoperable.Caused by Human Error.Field Wiring & Connection Drawing Were Corrected & Investigation of Event Is Being Performed by Engineering QA + (11:33:11, 3 January 2025)
- ML19269E394 + (11:33:13, 3 January 2025)
- 05000277/LER-1979-028, Forwards LER 79-028/03L-0 + (11:33:14, 3 January 2025)
- ML19269E391 + (11:33:16, 3 January 2025)
- ML19269E387 + (11:33:19, 3 January 2025)
- ML19269E386 + (11:33:19, 3 January 2025)
- ML19269E385 + (11:33:20, 3 January 2025)
- ML19269E384 + (11:33:21, 3 January 2025)
- ML19269E383 + (11:33:22, 3 January 2025)
- ML19269E382 + (11:33:23, 3 January 2025)
- ML19269E381 + (11:33:24, 3 January 2025)
- ML19269E380 + (11:33:25, 3 January 2025)
- ML19269E378 + (11:33:26, 3 January 2025)
- ML19269E377 + (11:33:28, 3 January 2025)
- ML19269E376 + (11:33:28, 3 January 2025)
- ML19269E375 + (11:33:29, 3 January 2025)
- ML19269E374 + (11:33:30, 3 January 2025)
- ML19269E373 + (11:33:31, 3 January 2025)
- ML19269E372 + (11:33:31, 3 January 2025)
- ML19269E371 + (11:33:32, 3 January 2025)
- ML19269E370 + (11:33:33, 3 January 2025)
- ML19269E369 + (11:33:34, 3 January 2025)
- ML19269E368 + (11:33:35, 3 January 2025)
- ML19269E367 + (11:33:36, 3 January 2025)
- ML19269E366 + (11:33:39, 3 January 2025)
- ML19269E365 + (11:33:40, 3 January 2025)
- ML19269E363 + (11:33:42, 3 January 2025)
- ML19269E362 + (11:33:42, 3 January 2025)
- ML19269E360 + (11:33:44, 3 January 2025)
- ML19269E359 + (11:33:45, 3 January 2025)
- ML19269E358 + (11:33:46, 3 January 2025)
- ML19269E357 + (11:33:48, 3 January 2025)