Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19270F256 + (11:15:00, 3 January 2025)
- ML19270F258 + (11:15:00, 3 January 2025)
- ML19270F255 + (11:15:02, 3 January 2025)
- ML19270F254 + (11:15:03, 3 January 2025)
- ML19270F252 + (11:15:04, 3 January 2025)
- ML19270F253 + (11:15:04, 3 January 2025)
- ML19270F250 + (11:15:06, 3 January 2025)
- ML19270F251 + (11:15:06, 3 January 2025)
- ML19270F249 + (11:15:07, 3 January 2025)
- ML19270F248 + (11:15:08, 3 January 2025)
- 05000344/LER-1978-028-03, /03L-0 on 781228:diesel-driven Auxiliary Feedwater Pump Developed Diesel Fuel Oil Leak.Due to Physical Damage to Fitting Caused by Someone Standing on Fuel Line During Overhaul.Engine Vibration Caused Line to Break + (11:15:09, 3 January 2025)
- ML19270F246 + (11:15:11, 3 January 2025)
- 05000344/LER-1978-028, Forwards LER 78-028/03L-0 + (11:15:13, 3 January 2025)
- TXX-2946, Forwards Initial Response to Effluent Treatment Sys Branch Question (Q320.8) Re Solidification Process Control Program.Response Will Be Transmitted to NRC in FSAR Amend 4 + (11:15:14, 3 January 2025)
- 05000302/LER-1979-003-03, /03L-0 on 790106:during Rx Runback Following Turbine Trip,Main Feedwater Block Valve FWV-30 Did Not Close.Caused by Valve Sticking on Its Back Seat.Corrective Action:Manual Cycling + (11:15:17, 3 January 2025)
- ML19270F241 + (11:15:18, 3 January 2025)
- 05000302/LER-1979-003, Forwards LER 79-003/03L-0 + (11:15:20, 3 January 2025)
- ML19270F238 + (11:15:21, 3 January 2025)
- ML19270F236 + (11:15:22, 3 January 2025)
- ML19270F235 + (11:15:23, 3 January 2025)
- ML19270F233 + (11:15:24, 3 January 2025)
- 05000368/LER-1978-034-03, /03L-0 on 781230:during Mode 3,all Control Element Assemblies Fully Inserted, & Signal Leads from Upper & Lower Detector Chambers of B Linear Safety Channels Found to Be Swapped.Chamber Leads Were Reconnected Correctly + (11:15:25, 3 January 2025)
- 05000368/LER-1978-033-03, /03L-0 on 781230:during Mode 3 Operation,C Containment Bldg Pressure Transmitter Failed to 60 Psia W/No Consequences.Failure Appears Isolated + (11:15:27, 3 January 2025)
- 05000368/LER-1978-033, Forwards LER 78-033/03L-0 & LER 78-034/03L-0 + (11:15:29, 3 January 2025)
- 05000245/LER-1978-032-03, /03L-0 on 781227:diesel Fire Pump Fuel Oil Sample Surveillance Inadvertently Overlooked During Routine Survey of Completed Surveillances.Not on Surveillance Schedule. Subsequently Added to Schedule + (11:15:31, 3 January 2025)
- 05000245/LER-1978-032, Forwards LER 78-032/03L-0 + (11:15:36, 3 January 2025)
- ML19270F225 + (11:15:37, 3 January 2025)
- TXX-2947, Forwards Initial Responses to Core Performance Branch Questions (Q231.1-Q231.11,Q232.1-Q232.) Re Fuel Performance Code.Responses Will Be Retransmitted to NRC in FSAR Amend 4 + (11:15:38, 3 January 2025)
- IR 05000363/1978013 + (11:15:41, 3 January 2025)
- ML19270F222 + (11:15:42, 3 January 2025)
- ML19270F221 + (11:15:44, 3 January 2025)
- ML19270F219 + (11:15:45, 3 January 2025)
- ML19270F218 + (11:15:46, 3 January 2025)
- ML19270F217 + (11:15:46, 3 January 2025)
- ML19270F216 + (11:15:47, 3 January 2025)
- ML19270F215 + (11:15:48, 3 January 2025)
- ML19270F213 + (11:15:50, 3 January 2025)
- ML19270F214 + (11:15:50, 3 January 2025)
- ML19270F212 + (11:15:52, 3 January 2025)
- ML19270F211 + (11:15:53, 3 January 2025)
- ML19270F210 + (11:15:53, 3 January 2025)
- ML19270F208 + (11:15:54, 3 January 2025)
- ML19270F207 + (11:15:55, 3 January 2025)
- ML19270F206 + (11:15:56, 3 January 2025)
- ML19270F205 + (11:15:57, 3 January 2025)
- IR 05000277/1978024 + (11:15:58, 3 January 2025)
- ML19270F202 + (11:16:00, 3 January 2025)
- ML19270F201 + (11:16:01, 3 January 2025)
- ML19270F200 + (11:16:02, 3 January 2025)
- ML19270F199 + (11:16:04, 3 January 2025)
- ML19270F198 + (11:16:06, 3 January 2025)