Consurners POVVer Company ll
- ,r General Offices
- 212 West wch.gan Avenue, Jac kson, M.chigan 49201. Arca Code S17 7H8-0550 YI (' y.
.d February 1, 1979 Director,:iuclear Reactor Regulaticn Att:
Mr Dennis L Zienann, Chief Operating Reactors Branch IIo 2 US Iiuclear Regulatory Cennission
'4ashington, DC 20555 DOCKET 50-155 - LICEIISE DPR BIG ROCK POIIIT PLA!!T - DESCRIPTIO:I 0F I:ISERVICE TEST PROGRAM FOR PU:ES A:ID VALVES KID REQUESTS FOR RELIEF FROM SPECIFIC ASME CCDE REQUIREEITS Consumers Power Company letter dated December 22, 1978 forwarded a description of the Big Rock Point inservice inspection program and requests for relief from specific requirements of the ASME Boiler and Pressure Vessel Code.
The inservice test progran for pumps and valves was not described in the December 22, 1978 letter.
The attachment to this letter conprises a descrip ion of the Big Rock Point inservice test progran for pumps and valves and requests for relief from specific code requirements. The attached prcgran is based on the 1977 edition of the ASME Boiler and Pressure Vessel Code including Addenda through Sunner 1978.
Your review of the attachment and approval of the requests for relief therein is requested.
David A Bixel (Signed)
David A Bixel Nuclear Licensing Administrator CC:
JGKeppler, US:iRC 790205oSct
FU'4F TESTI:IG FRCGRA 4 AND REQUEST FOR RELIEF
I'JP TES"'ING Pumps provided with emergency power sources are required to be tested. This includes pumps powered by the emergency diesel generator, the two core spray pumps and the electric fire pump, and the self-powered diesel fire pump.
Tests to be perforced on these pumps are as f>llows:
1.
Core Sprt/ Pumps - The pumps will be tested once each reactor shutdown for refueling. See request for relief.
2.
Electric Fire Pump - The electric fire pump will be tested at least once per =cnth.
3 Diesel Fire Pump - This pump will be started and run at least conthly.
The parameters to be ceasured during these tests are tabulated below.
Rotative Inlet Flow 3 earing Pu o Name Speed Pressure R
Rate
'libration Tenrerature Core Spray R
R R
HA*
R R
Electric Fire M
M M
NA*
M Y
Diesel Fire M
M M
UA*
M Y
M - Monthly Y - Yearly R - Once/Defueling
- Per I'4P3100, differential pressure will be used to establish pump acceptability.
30TE: The acceptable ranges of parameters will be as required in Table I'4P-3100-2.
1
RELIEF REOUEST Item: Relief request for core spray pumps.
Test Requirement: Monthly during plant oper ation and within one week after plant start-up if not tested during the shutdown.
4 Basis for Relief:
These pumps are part of the Energency Core Cooling Systea.
Testing during power operations would require a valve _
lineup which would preclude their performing their re-quired function after a loss of coolant accident (L3CA).
In the event of a LOCA, areas which must be entered to change this valve lineup would be untenable.
In addition, tes;ing during power operation wou' d require personnel entry into the very nigh radiation area directly beneath the reactor vessel.
Alternate Testing:
Once per reactor shutdown for refueling.
2
VALVE TESTI'iG FROGR/Ut IdiD p r.,nM & d
,, n q6 y [-. y -
Ev A.
db L M 4.w %V
IWV TES'"ING e
b m
N a
m o
e o
a m
0 r4
- l u
5 m
p o
o e
d o
r4 s
o m
,a O
[-4 t/3 r4 Cf r1 o
o o
n e
o a
n n<
tf cc d
H 4
O O
t4 d
N "j
D d
e d
Valve o
s l1 o
r4
+>
o m
et m
u a
Y Valve Print o
Category 4
o o
e o
e o
rn A
E1 54 E1 Number Number r)
A B
C D
E Itemarks RV5050 M-106 R-19 X
3/h" ItV pu C
t/lut CRD pump relier valves.
W ltV5051 M&f052 M-107 E-H X
6" GT MO O
Q Y
ilR Emergency condenser isolation valves.
'(053 11-lh C
7062 0
7063 C
CV4020 M-107 C-19 X
3" GL A0 0
Q Y
iUt Liquid poison system discharge isola-tion valve.
CVhll8 M-107 C-20 X
3" Exp Exp C
20/2 Liquid poison explosive outlet valves.
h119 hl20 CVh121 M-107 B-19 X
2" Exp Exp C
20/2 Liquid poison explosive inlet valveu.
4122 CV4123 M-107.B-23 X
1" Exp Exp C
20/2 Liquid poison explosive N2 ""EP Y l
hl24 valves.
RV50h9 M-107 D-22 X
3/h" RV pit C
1/HH Liquid poison system relier valve.
Cliec k M-107 U-17 X
2" CK l'L C
Q Y
- th Liquid poison system supply valve.
hl;e Mark 210 l
IWV TESTING o
3 m
a
- b m
3 n
t y
o 2
f" R
E 8
a t
8 1
E Q
R b
^
?
to 3
+'
M
'd
.S e
Valve o
N o
+2 e
o n
o a
o m
a m
Valve Print o
Category a
e o
o e
o o
o tn
<l A
E-+
m E1 Thimber Number o
A B
C D
E Remarks
!!T(05(>
M-107 11 - 1 5 X
8" GT M0 C
Q Y
Shutdown coolind systen isolution 7,
7057 valves.
7058 N-15 7059 RV'j0] 8 M-107 11 - 1 8 X
3/h" RV H
C 1/ith Shutdown coolind system pressure 50l9 11 - 1 8 protection.
CVh 050 M-121 M-8 X
3" GL A0 0
Q Y
RR Liquid poison supply to recire line.
RV5000 M-121 D9-ll X
3" RV PIl C
1/nH Steam drum relier valves.
5001 5002 5003 50h5 50h6 Chec k M-121 L-12 X
3" CK PL C
Q Y
llR Liquid poison supply to Rx vessel.
Valve Mark 21h CVi!C09 M-122 X
3/h" GL A0 C
Q Y
ltR Scram inlet and outlet valves.
CVilC10 CVNCll M-122 X
1" GL A0 0
Q Scrum dump tank vent and drain valves.
CVih:12 2"
IUV TESTING e>
m w
N U
c m
a n
u n
o a
p 42 o
e e
.E C
Y M
E o
mo
.o p
o a
e
'd N
d C
S to Y
O M
N d
~
o e
Valve o
d 11
+2 w
+2 u
es et
+2 4
m es a
Valve Print o
Category w
d o
o u
o o
O CO 4
EM M
E-s Number Number o
A B
C D
E Remarks ItV50! 3 M-123 E-G X
3/h" HV PH C
1/hh Fire system relief valves at pump 5062 lh-16 h"
dischar e.
5063 3/h" M0'(051 M-123 N-O X
h" GT MO C
Q Core spray and redundant core spray
'/061 9-10 isolation valves.
7070
'(071 C3 Qlb-16 X
h" CK FL C
Q Y
HH Core spray pump discharge and te.st tank Pump Dir-inlet check valves.
charge &
M-123 Tank in-0-13 let Check Valveu C3 X
1-6" CK FL C
Q Core spray primary and backup check Primary M-123 0-8 3-h" valves (two total).
and Back-up Check Valves (2 Total)
Mark 21h M-121 M-8 X
3" CK FL C
Q Y
HH Liquid poison supply to reactor vessel recire purip suction.
IWV TFSTII;G e
b a
a m
2 i
0 0
'd 0
L o
.u a
o r<
m
.c e
U m
c4 o+
a e
o p
o s
e 4
N d
(7 S
E to d
N d
Y d
o d
Valve o
s L1 o
ri o
n o
a o
m a
m Valve Print g
Category g
g y
g g
y y
liumber liumber o
A B
C D
E Remarks CVhl80 A-203 X
6" CT A0 C
Q 1 solation valve for ItDS.
4181 hl82 h183 CVhl84 A-203 X
2" GT A0 0
Q Spool piece, warming line isolation valve.
SV498h A-203 X
6" RV SO C
Lilit/
Y LitR Depresuurization valve for ItDS.
h985 Q
4986 498'T CV4031 M-108 x
2" GL A0 O
LRR/
Y Litit Clean cump isolation valves.
4102 Q
CVh025 M-108 x
2" GL A0 0
LRR/
Y LRR Dirty sump isolation va)ves.
CV4103 Q
I kr(050 M-121 A-l'(
X 12" GT MO O
Lillt/
Y EllIt Main steam isolation valve.
Q
[10'(065 M-121 B-17 X
l-GT MO DC LRR/
Y IIH Main steam line drain isolation valve.
l/2" Q
IWV TESTING e>
un N
N c
m y
n o
a (Q
d 8
3 u
4 m
w rv a
o
.c e
o o
o u
o 4
o a
s<
m et sc c3 H
4 O
o tD Y
Y e
.e4 o
o Valve o
s r1 o
e o
h ti c4 9
h a
ei m
Valve Print o
Category g
g y
g g
y g
Number Humber o
A B
C D
E Remarks CVh091 M-107 E-R X
l-BL A0 C
LRR/
Y LitR Cleanup demin resin sluice line.
-3 4092 6-7 1/2" Q
4093 CVh 02'(
I4-10'(
11 - 0 X
2" GL A0 C
LRR/
Y LliR Reactor and fuel pit drain isolution h117 15 Q
valves.
CS Primary M-123 0-10 X
h" CK FL C
Q Y
RR Check Valves M0706h M-123 M-10 X
h" GT MO C
RR/(
Y ltR Enclosure spray isolation valves.
'(068 M-13 Feed-Water Check &
M-121 P-15 X
X 10" CK MO O
LRH/
Y LRR Stop Q
LEGE2iD FOR DTV TESTI:i3 CHARTS Valve Tyne Actuator Tyne liornal Position GT - Gate AO - Air Operator C - Closed RV - Relief 50 - Solenoid Op
. tor 0 - Open GL - Globe MO - Motor Operator D - Disabled Exp - Explosive PR - Pressure CK - Check FL - Flow BL - Sall Exp - Explosive Testing Reauirements EER - Exercise and check leakage during :!SSS hydrostatic testing during reactor shutdown for refaeling.
RR - Exercise / check setting during each reactor shutdown for re-fueling.
LRR - Leak rate test during each reactor shutdown for refueling.
Q - Exercise once per three conths (quarterly).
2/20 - 205 of the valves in two years.
2/RR - Two per each reactor shutdown for refueling.
1/RR - One per each reactor shutdown for refueling.
Systers CRD - Control Rod Drive CS - Core Spray RDS - Reactor Depressurization Syster Other Definitions 00S - Out of Service OPS - Operations Y
- Yes 8
RELIEF RECUEST System:
Enclosure Spray Systen (Print M-123)
Valve:
M3706k; M0706S (Disabled Closed)
Category: B ASME Clase:
2 Function: Enclosure Spray Isolation Valves Test Requirement:
Exercise valves for operability every three conths.
Basis for Relief:
Exercising these valves du;'n " wer operation would result in spraying water on energized electrical equipment inside containment.
Even though M07068 is disabled closed, it is a backup for M0706h; thus, testing would be required.
Alternate Testing:
Exercise valves each reactor shutdown for refueling.
o.
RELIEF RECUEST Systen: Feed-Water System (Print M-121)
Valve:
Feed-Water Check and Stop Check Valves Category: ALC ASME Class:
1 Function: To Prevent Feed-Water Backflow From St31a Druc Test Requirement:
Exercise for operability every three months and leak test each reactor shutdon for refueling.
3 asis for Relief: The check valve has no operator. The stop check valve can-not be closed against the pressure present in this line through which all feedvater to the reactor flows.
Each reactor shutdo.a for refueling, a local leak rate test using air is performed on these valves.
Alternate Testing: Perform a leak rate test each reactor shutdown for refueling.
10
RELIEF FIOUEST System (Print M-121)
System: Ma in :
_a Valve:
M07050 Categcry:
A a
ASME Class: 1 Function: To Isolate Main Steam Line Prior to Leaving the Contairment Test Requirenent:
Exercise valve for operability every three months and leak test each reacter shutdown for refueling.
Sasis for Relief: Exercising this valve interrupts all main steam flow.
Leak testing is only possible during USSS hydrostatic test.
Alternate Testing:
Exercise valve during each reactor shutdown for refueling.
Hote valve leakage during each :iSSS hydrostatic test associated with a reactor shutdt vn.or refueling.
11
.a rr e rr. p rn. tlc.
a.
Systen: 5!ain Stear. Line Drain Isolation Valve (Print '.i-121)
Valve:
M07065 Category: A ASME Class: 1 Function: To Isolate :.'ain Stean Line Drain to Condenser Test Requirement: Exercise valve for operability every three conths and leak test each reactor shutdown for refueling.
Basis for Relief: The valve is electrically disabled in the closed position.
Alternate Testing:
- lote leakage rate through the valve during each IISSS hydrostatic test associated n th a reactor shutdown for refueling.
12
RELIEF RECUEST System: Core Spray System (Print M-123)
Valve:
Primary Check Valves Category:
C ASME Class:
1 Function: Primary Check Valves in the Core Spray Lines To Prevent Feactor Pressure From Pressurizing Lines if the Isolation Valves "ere Opened Test Requirement:
Exercise for operability every three =onths.
Basis for Relief:
The p"imary check v:.lves have no operators. The valves cannot be opened against operating reactor pressure by initiating flow through these lines, because core spray systen pressure is much less than operating reactor pressure.
Alternate Testing:
Exercise the valves by establishing a flow through ther dur ng each reactor shutdown for refueling.
13
RELIEF REQUEST System:
Emergency Condenser (Print M-107)
Valves: M07052,'407053, M07062, M07063 Category:
3 ASME Class: 1 Function:
E=ergency Condenser Inlet and Discharge Irolation Valves Test Requirement:
Exercise valves for operability every three months.
Basis for Relief:
The exercising of these valves at power would ainit steam to the emergency condenser. This action would cause un-necessary thermal stresses in the tube bundles. The proposed alternate testing vill minimize thermal cycles.
Alternate Testing: Once each cold shutdown or when one loop becomes in-operative.
Ik
RELIEF REQUEST System: Liquid Poison System (Print M-107)
Valve:
CVLO20 Category: 3 ASME Class:
1 Function: Liquid Poison Tank Discharge Isolation U.
Test Requirement: Exercise valve for operability every three conths.
Easis for Relief:
Closing this valve prevents injection of liquid poison and prevents system from being available for operation as re-quired by Technical Specifications.
Alternate Testing:
Exercise valve once per each reactor shutdown for refueling.
15
RELIEF RECUEST System:
Liquid Poison System (Print M-107)
Valve:
Check Valve Category:
C AS:iE Class:
1 Function: Once Systen Is Actaated, Check Valve Prevents :litrogen From Escaping to the Steam Drum tihile Establishing a Syphon Test Requirement:
Exercise valve for operability every three months.
Basis for Relief:
The valve has no operator.
In addition, pressure cannot be applied to test valve operation without breaching primary pressure boundary.
Alternate Testing: Once every shutdown for refueling.
lo
RELIEF REOUEST System: Shutdown Cooling Systen (Print M-107)
Valves: M07056, M07057, M07058, M07059 Catego ry : 3 ASME Class: 1 Function: Shutdown Cooling System Inlet and Discharge Isolation Valves Test Requirement:
Exercise valves for operability every three months.
Basis for Relief: Exercising these valves while the reactor is at operating pressure would overpressurice the shutdown cooling system (design pressure 300 psig).
Alternate Testing: The valves are exercised as part of putting the system in service during each shutdcyn.
17
RELIEF RECTEST Syster: Liquid Poison System (Print M-121)
Valve:
CV4050 Category: 3 ASME Class: 1 Function:
Isolate Flow of Liquid Poison to Recirculation Pump Suction Test Requirement: Exercise valve for operability every three months.
Basis for Relief: An interlock opens this valve automatically when either recirculating pump is in service. Thus, exercising this valve requires taking both recirculating pumps out of service.
Alternate Testing: Exercise valve and verify valve position indication once per reactor shutdown for refueling.
18
RELIEF BECUEST System: Liquid Poison Supply to Reactor Vessel (Print M-121)
Valves: Check Valve in Liquid Poison Supply Line to Reactor Vessel and Check Valve in Liquid Poison Supply Line to Recirculating Pu=ps Category:
C ASME Class:
1 Function: To Prevent Reactor ' dater Backflow Through Liquid Poison Line Test Requirement:
Exercise valves for operability every three months.
Basis for Relief: The check valves have no operators. Exercising these valves by initiating flow in the system would introduce liquid poison into the reactor.
Alternate Testing: Exercise valves each reactor shutdcwn for refueling by pressurizing liquid poison discharge piping with air.
19
RELIE? REOUEST System:
Control Rod Drive (Print M-122)
Valves: Scras Inlet (CVUCC9) and outlet (CVUClo) Isolation Valves (32 Sets of 2 Valves)
Category:
3 ASME Class:
2 Function: To Cause a Contrcl Rod Drive To Insert Rapidly Test Requirement:
Exercise valves for operability every three conths.
Basis for Relief:
Exercising these valves would cause the associated control rud to scram.
Alternate Testing: V.rify operability within seven days prior to reactor critical approach.
20
NLal""
NL,sv00.
S;; tem:
Core Spray System (Print M-123)
Valves:
Core Spray Pump Discharge Check Valves and Core Spray Test Tank Inlet Check Valve Category:
C ASME Class:
3 Function: To Prevent Backflow in the Core Spray System Test Requirement: Exercise valves for operability every three conths.
Basis for Relief: The valves have no operators. They cannot be exercised by initiating flow in the system during pcVer operation because the core spray pumps cannot be operated for test during power operation.
Alternate Testing: Once each reactor shutdown for refueling.
21
RELIEF RECTEST System:
Containment Isolation Valves Listed in Section 3.7.3 of Technical Specifications (Prints M-107, M-108)
Valves:
CVh031, Cvh102, CVh025, CVh103, C7h091, CVh092, CVh093, CVh029, CVhll7 Catego ry: A ASME Class: 1 for CVhC)2, CVLO93 2 for CVh031, L102, 4025, h103, LO27, hil7, 4091 Function: To Isolate Containment
'est Requirenent:
Leak rate test each "eactor shutdown for refueling.
Basis for Falief: Technical Specificatious require leak rste test every 12 conths. A Technical Specifications' change has been sub-mitted to change this interval to each reactor shutdown for refueling, but not to exceed every two years.
Alternate Testing: Test in accordance with Technical Specifications.
22
RELIEF REGUEST System: Reactor Depressurization System (Print A-203)
Valve:
Svh98h-syh987 Category : A AS:.E Class:
1 Function:
Depressurization Valve Test Requirement:
Exercise for operability every three months.
Basis for Relief: The valva cannot be fully stroked unless continuous primary system pressure is applied. During testing, pressure in the spool piece between the isolation valve and the de-pressurization valve is relieved before the depress rization valve reaches the fully stroked position. Thus, on...
partial stroking of +he valve is possible during testing.
Alternate Testing:
Exercise the depressurization valve each reactor cold shutdown, but not more frequently than three months. This exercising will only entail a partial stroking of the valve.