Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216J787 + (14:52:44, 3 December 2024)
- ML20216J783 + (14:52:45, 3 December 2024)
- ML20216J784 + (14:52:45, 3 December 2024)
- ML20216J779 + (14:52:46, 3 December 2024)
- ML20216J778 + (14:52:47, 3 December 2024)
- ML20216J775 + (14:52:48, 3 December 2024)
- ML20216J774 + (14:52:48, 3 December 2024)
- ML20216J773 + (14:52:49, 3 December 2024)
- NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr + (14:52:49, 3 December 2024)
- ML20216J766 + (14:52:50, 3 December 2024)
- 2CAN039804, Discusses TS Bases Change Re Plant Protection Sys Matrix Logic Testing.Encl Revised Bases Page B 3/4 3-1a Should Be Issued Immediately Due to Increase in Current Channel Testing Frequency + (14:52:51, 3 December 2024)
- ML20216J765 + (14:52:51, 3 December 2024)
- ML20216J763 + (14:52:53, 3 December 2024)
- ML20216J762 + (14:52:53, 3 December 2024)
- ML20216J759 + (14:52:54, 3 December 2024)
- ML20216J758 + (14:52:54, 3 December 2024)
- ML20216J757 + (14:52:55, 3 December 2024)
- ML20216J756 + (14:52:56, 3 December 2024)
- ML20216J753 + (14:52:56, 3 December 2024)
- ML20216J749 + (14:52:57, 3 December 2024)
- ML20216J750 + (14:52:57, 3 December 2024)
- NRC-98-0071, Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications + (14:52:58, 3 December 2024)
- NG-98-0458, Responds to Violations Noted in Insp Rept 50-331/98-02. Corrective Actions:Revised Applicable Plant Procedures Re Valves in Violation & Submitted TS Rev Which Will Provide Longer LCO for Drywell Cooling Return & Supply Valves + (14:52:59, 3 December 2024)
- ML20216J743 + (14:53:00, 3 December 2024)
- ML20216J738 + (14:53:04, 3 December 2024)
- PNO-III-78-193, on 781109,received Allegation Re Qualification of Welders Performing Safe End Repair Work at Plant.State of IA Informed + (14:53:05, 3 December 2024)
- ML20216J732 + (14:53:06, 3 December 2024)
- ML20216J733 + (14:53:06, 3 December 2024)
- SVP-98-095, Responds to NRC Re Violations Noted in Insp Repts 50-254/97-22 & 50-265/97-22.Corrective Actions:Procedure Qcop 2300-08 Was Walked Down & Verified by Sro,Corrected Procedure & Evaluated Effect of Longer Valve Closures Times + (14:53:07, 3 December 2024)
- ML20216J728 + (14:53:08, 3 December 2024)
- ML20216J726 + (14:53:08, 3 December 2024)
- ML20216J724 + (14:53:09, 3 December 2024)
- SVP-98-094, Provides Revised Response to Violations Noted in Insp Repts 50-254/97-14 & 50-265/97-14.Corrective Actions:Performed Instrument Error Analysis & Detailed Calculation to Determine Min Pressure Criteria & Revised Qcos 2900-01 + (14:53:10, 3 December 2024)
- ML20216J719 + (14:53:11, 3 December 2024)
- ML20216J720 + (14:53:11, 3 December 2024)
- ML20216J717 + (14:53:12, 3 December 2024)
- ML20216J715 + (14:53:12, 3 December 2024)
- ML20216J713 + (14:53:14, 3 December 2024)
- ML20216J710 + (14:53:15, 3 December 2024)
- ML20216J707 + (14:53:16, 3 December 2024)
- ML20216J708 + (14:53:16, 3 December 2024)
- ML20216J704 + (14:53:17, 3 December 2024)
- PNO-III-99-045, on 991001,brush Fire Was Reported on Licensee Site in Unused Area one-fourth to one-half Mile from Plant Itself.Massac County Fire Dept Responded with Two Trucks & Tanker & Extinguished Fire in About 1 H + (14:53:17, 3 December 2024)
- ML20216J702 + (14:53:18, 3 December 2024)
- ML20216J695 + (14:53:19, 3 December 2024)
- ML20216J700 + (14:53:19, 3 December 2024)
- ML20216J694 + (14:53:20, 3 December 2024)
- ML20216J690 + (14:53:21, 3 December 2024)
- ML20216J693 + (14:53:21, 3 December 2024)
- ML20216J687 + (14:53:22, 3 December 2024)
- ML20216J689 + (14:53:22, 3 December 2024)
- ML20216J685 + (14:53:23, 3 December 2024)