Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235L303 + (10:00:27, 3 December 2024)
- ML20235L299 + (10:00:28, 3 December 2024)
- ML20235L296 + (10:00:28, 3 December 2024)
- ST-HL-AE-2977, Responds to NRC Re Violations Noted in Insp Rept 50-498/88-68.Corrective Actions:Phase B Isolation Requirements Incorporated in Emergency Operating Procedures & Team Formed to Conduct Enhancement Program + (10:00:29, 3 December 2024)
- W3P87-1782, Responds to Violations Noted in Insp Rept 50-382/87-17. Corrective Actions:Missing Locknuts Installed on Restraints MSSH-3084,SIRR-3006 & SIR-3008,other Disturbed Restraints Inspected & Training Session Will Be Held + (10:00:30, 3 December 2024)
- ML20235L282 + (10:00:31, 3 December 2024)
- ML20235L281 + (10:00:32, 3 December 2024)
- ML20235L276 + (10:00:33, 3 December 2024)
- ML20235L272 + (10:00:34, 3 December 2024)
- ML20235L266 + (10:00:35, 3 December 2024)
- ML20235L265 + (10:00:36, 3 December 2024)
- IR 05000454/1987036 + (10:00:38, 3 December 2024)
- ML20235L253 + (10:00:39, 3 December 2024)
- ML20235L250 + (10:00:40, 3 December 2024)
- 3F0289-12, Requests Discretionary Enforcement Associated W/Performance of Surveillance Required by Tech Spec 4.3.1.1.1.Licensee Proposes to Delay Performance of Next Monthly Test Until Plant Restarted Following Repair of Reactor Coolant Pump + (10:00:41, 3 December 2024)
- ML20235L245 + (10:00:41, 3 December 2024)
- TXX-6780, Interim Deficiency Rept CP-87-82 Re Discrepancies Observed in Fire Control Panels.Listed Deviations,Including Specs & Design & Vendor Drawings Noted.Initially Reported on 870831. Corrective Action Not Given.Next Rept Anticipated by 871124 + (10:00:42, 3 December 2024)
- ML20235L236 + (10:00:43, 3 December 2024)
- ML20235L235 + (10:00:44, 3 December 2024)
- ML20235L227 + (10:00:45, 3 December 2024)
- ML20235L218 + (10:00:46, 3 December 2024)
- ML20235L215 + (10:00:47, 3 December 2024)
- ML20235L208 + (10:00:48, 3 December 2024)
- ML20235L205 + (10:00:49, 3 December 2024)
- ML20235L203 + (10:00:50, 3 December 2024)
- ML20235L198 + (10:00:51, 3 December 2024)
- 1CAN108701, Informs That Since Incore Detector Positions Will Not Be Depleted Until 1R9,installation of Core Exit Thermocouples Will Be Delayed Until 1R9 Outage.Tech Specs Per Generic Ltr 83-37 Requirements Expected to Be Submitted by 871127 + (10:00:52, 3 December 2024)
- ML20235L187 + (10:01:39, 3 December 2024)
- ML20235L185 + (10:01:40, 3 December 2024)
- ML20235L181 + (10:01:41, 3 December 2024)
- ML20235L178 + (10:01:41, 3 December 2024)
- IR 05000327/1989003 + (10:01:44, 3 December 2024)
- ML20235L172 + (10:01:46, 3 December 2024)
- ML20235L168 + (10:01:46, 3 December 2024)
- ML20235L166 + (10:01:47, 3 December 2024)
- ML20235L162 + (10:01:48, 3 December 2024)
- ML20235L164 + (10:01:48, 3 December 2024)
- ML20235L159 + (10:01:50, 3 December 2024)
- ML20235L157 + (10:01:50, 3 December 2024)
- ML20235L156 + (10:01:51, 3 December 2024)
- ML20235L155 + (10:01:52, 3 December 2024)
- ML20235L152 + (10:01:53, 3 December 2024)
- ML20235L151 + (10:01:53, 3 December 2024)
- ML20235L147 + (10:01:54, 3 December 2024)
- ML20235L145 + (10:01:55, 3 December 2024)
- ML20235L143 + (10:01:56, 3 December 2024)
- 05000369/LER-1989-030, :on 880915,discovered That Capped Spare Sleeves Through Fire Barrier Pentrations Were Unqualified as 3 H Fire Barriers.Caused by Design Deficiency Due to Incomplete Documentation.Fire Watches Established + (10:01:58, 3 December 2024)
- ML20235L135 + (10:01:58, 3 December 2024)
- ML20235L133 + (10:01:59, 3 December 2024)
- ML20235L130 + (10:01:59, 3 December 2024)
- ML20235L129 + (10:02:00, 3 December 2024)