Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236P241 + (05:36:39, 3 December 2024)
- ML20236P236 + (05:36:40, 3 December 2024)
- ML20236P240 + (05:36:40, 3 December 2024)
- ML20236P234 + (05:36:41, 3 December 2024)
- ML20236P233 + (05:36:41, 3 December 2024)
- ML20236P232 + (05:36:42, 3 December 2024)
- ML20236P229 + (05:36:43, 3 December 2024)
- ML20236P228 + (05:36:43, 3 December 2024)
- IR 05000445/1987007 + (05:36:44, 3 December 2024)
- ML20236P226 + (05:36:45, 3 December 2024)
- ML20236P223 + (05:36:46, 3 December 2024)
- ML20236P222 + (05:36:47, 3 December 2024)
- ML20236P219 + (05:36:48, 3 December 2024)
- ML20236P218 + (05:36:49, 3 December 2024)
- ML20236P217 + (05:36:49, 3 December 2024)
- 05000301/LER-1987-004-01, :Degradation of Steam Generator Tubes Noted During Eddy Current Exam Conducted on 871008-22.One Tube Weld Repaired.Remaining Tubes Left as Found Due to Minimal Leakage Observed & Hazards Associated W/Repair + (05:36:56, 3 December 2024)
- ML20236P214 + (05:36:56, 3 December 2024)
- NLS8700559, Responds to Request for Addl Info Re 1987 Updated Sar. Fatigue Usage Equations Developed to Calculate Usage Factors Based on Number of Cycles That Actually Occurred to Critical Components + (05:36:57, 3 December 2024)
- ML20236P210 + (05:36:58, 3 December 2024)
- ML20236P211 + (05:36:58, 3 December 2024)
- IR 05000369/1998006 + (05:37:13, 3 December 2024)
- ML20236P205 + (05:37:18, 3 December 2024)
- PNO-IV-87-058, on 871109,radioactive Matl Mistakenly Released from Radiologically Controlled Site & Subsequently Dumped at Coffey County Landfill.Licensee Retrieved All But 3 of 39 Pieces of Duct & Associated Hardware from Dump + (05:37:19, 3 December 2024)
- ML20236P200 + (05:37:19, 3 December 2024)
- 05000458/LER-1987-021, :on 871015,discovered That Fire Seal Not Installed in Spent Fuel Pool Cooling Pump Cubicle Wall. Caused by Contractor Unawareness of Openings.Maint Work Order Request Written to Seal Openings + (05:37:21, 3 December 2024)
- ML20236P198 + (05:37:22, 3 December 2024)
- 05000461/LER-1987-040, :on 870710,util Radiation Protection Personnel Discovered That Collection Media Missing from Particulate/ Iodine Sampler.Caused by Failure to Reinstall Media on 870703.Collection Media Reinstalled + (05:37:23, 3 December 2024)
- ML20236P195 + (05:37:24, 3 December 2024)
- ML20236P190 + (05:37:25, 3 December 2024)
- ML20236P194 + (05:37:25, 3 December 2024)
- ML20236P189 + (05:37:26, 3 December 2024)
- ML20236P188 + (05:37:27, 3 December 2024)
- ML20236P187 + (05:37:27, 3 December 2024)
- TXX-6934, Interim Deficiency Rept CP-87-45 Re Reactor Coolant Pump Motor Backup Circuitry.Initially Reported on 870717. Evaluation of Issue Continuing.Next Rept Expected by 880125 + (05:37:28, 3 December 2024)
- ML20236P184 + (05:37:28, 3 December 2024)
- ML20236P183 + (05:37:29, 3 December 2024)
- ML20236P181 + (05:37:30, 3 December 2024)
- 05000304/LER-1987-003-08, :on 870707,reactor Containment Fan Cooler Autostarted in Low Speed During Test of Secondary Undervoltage Protection Relays.Caused by Personnel Error. Personnel Counseled + (05:37:31, 3 December 2024)
- ML20236P178 + (05:37:32, 3 December 2024)
- ML20236P177 + (05:37:33, 3 December 2024)
- ML20236P176 + (05:37:35, 3 December 2024)
- ML20236P173 + (05:37:36, 3 December 2024)
- ML20236P172 + (05:37:37, 3 December 2024)
- ML20236P169 + (05:37:38, 3 December 2024)
- ML20236P166 + (05:37:39, 3 December 2024)
- ST-HL-AE-2412, Application for Amend to License NPF-71,changing Tech Spec 6.5.1.8 to Require That Plant Operations Review Committee Meeting Minutes Be Sent to Vice President,Nuclear Plant Operations Instead of Group Vice President,Nuclear.Fee Paid + (05:37:40, 3 December 2024)
- ML20236P162 + (05:37:40, 3 December 2024)
- ML20236P160 + (05:37:41, 3 December 2024)
- ML20236P154 + (05:37:42, 3 December 2024)
- TXX-6966, Final Deficiency Rept CP-86-53 Re Seismic Design of Conduit. Initially Reported on 861021.Installation of Fiberglass Cloth/Resin Matl or Optional Conduit Supports Currently Scheduled for Completion by 880420 + (05:37:42, 3 December 2024)
- ML20236P152 + (05:37:43, 3 December 2024)