Forwards E Righetti Ltr Re Concern About Plant.E Righetti Feels Permit Should Be Issued Immediately on Temporary Basis,To Operate Plant
ML20236P166
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/19/1977
From: Lagomarsino R
HOUSE OF REP.
To: Rusche B
NRC
Shared Package
ML20236J368 List: ... further results
References
FOIA-87-214 NUDOCS 8708120238
Download: ML20236P166 (1)


Text

    • ROdbR J. LAGOMARSINO COMMITTEE Ce ISTM DISTRICT, CALIFORGt$la IPdTERN ATIONOL RELATIONS 1117 LoNGWORTH BUILDING IN TE R-A ER A A,AlR$

"""'" ;;"s Mi Congress of tije t!!niteb fptarts COMMITTEE ON 0116e Of M e p tstitM @ tg ASSISTANT REGIONAL WHIP AFFAIR Elasfjington,10E. 20515 N,,oN.u,,l,,.";~',uu,,,,,,,,,

SPECIAu INVESTIG ATIONS May 19, 1977 Mr. Ben Rusche Director of Regulations Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Rusche:

Enclosed is correspondence from my constituent, Mr. Ernest Righetti, regarding his concern about the Diablo Canyon Power Plant.

As you will note, he feels a permit should be issued immediately on i

j a temporary basis, to operate the plant.

I will appreciate any information y may be able to provide.

S ncerely, y

y R

J.

i m ob r of Cong ss RJL:cbt Enclosure l

THIS STATIONERY PRINTED ON PAPER MADE WITH RECYCLED FIBERS 8708120230 070729 PDR FOIA PDR L CONNOR87-214

(

P San Luis Obispo County Farm Bureau SAN LUIS OBISPO. CALIFORNI A ROUTE 3 BOX 155 C PHONE $43 36$4 J

i

)

i

{

Congressman Robert Lagomarsino

}

House of Representatives

(

Washington D C 20515 May 10, 1977

Dear Bob:

\\

I appreciate your response on the Diablo Canyon Power Plant.

In your letter you indicate that Mr Ben Ru h Regulations for the Nuclear Power Commissis e, Director of that the Commission would have to work withion, advised you statute-before issuing any permits.

n the law of the of a law that requires nearly four years to compilWe question the information and material to issue such a li e adequate cense.

P G & E has requested an interim permit t operation to meet expected power demands. o get the plant in A permit will prevent energy shortages and alla perm y basis.

test period of the plant.

ow an initial Sincerely hl1 n. a c s) d,i

' Ernest Righetti.7 b.

th-

~.

President r

l i

!