ML20236P219

From kanterella
Jump to navigation Jump to search
Forwards Operator Licensing Certification Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.Determined That All Applicants Satisfied Requirements of 10CFR55 & Appropriate Licenses Have Been Issued
ML20236P219
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/10/1998
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20236P220 List:
References
50-445-98-301, 50-446-98-301, NUDOCS 9807160206
Download: ML20236P219 (5)


See also: IR 05000445/1998301

Text

, . _

e

f '" %g

UNIT ED ST ATES

[

. ' ' .

NUCLEAR REGULATORY COMMISSION

-

[4

REGION IV

.

g

011 RY AN PL AZA DRIVE, SulT E 400

't'g

  • *' f

ARLINGTON TEXAS 76011 8064

  • ...*

I

July 10,1998

Mr. C. L. Terry

TU Electric

Senior, Vice President & Principal Nuclear Officer

ATTN: Regulatory Affairs Department

P.O. Box 1002

Glen Rose, Texas 76043

SUBJECT: NRC INSPECTION REPORT 50-445/98-301; 50-446/98-301

Dear Mr. Terry:

From June 19-26,1998, an operator licensing certification inspection was conducted at your

Comanche Peak Steam Electric Station, Units 1 and 2, reactor facilities. The enclosed report

presents the scope and results of that inspection.

The inspection included an evaluation of three applicants for a senior reactor operator upgrade

license and six applicants for a reactor operator license. We determined that all applicants

satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.

While the submitted written examination was adequate and the integrated plant operations

portion of the operating test was excellent, the administrative topics and control room

systems and facility walkthrough portions of the operating test of the examination

submitted by your staff were inadequate for administration, as submitted. Required

changes involved revision or replacement of the Administrative Section A4 questions of

both reactor operator sets, substantial modification or change from open to closed

reference of 16 of 40 task questions and replacement of three job performance measures

to achieve a cognitive level of difficulty which would discriminate at the required

knowledge level.

These revisions were necessary to satisfy the NRC's individual test item expectations,

)

consistent with the NRC's Exam! nation Standards. We reviewed our specific concerns and

recommendations with your staff and believe they now have a better understanding of the

NRC's examination expectations. We commend your staff for their prompt and effective

i

efforts to enhance the examinations with no adverse effect on the examination schedule.

Consequently, no further response to address this matter is required.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

9907160206 990710

g

dk /[$//I

!

PDR

ADOCK 05000445

,'

G

PDR

_ __ _ __ _ ____ _ _ _ __ _ _ ________ - _ _ _ -

_

_

!

o

-

\\

TU Electric

-2-

)

l

,

l

l

Should you have any questions concerning this inspection, we will be pleased to discuss them

l

with you.

Sincerely,

l

John L. Pellet, Chief

Operations Branch

Division of Reactor Safety

Occket Nos.: 50-445;50-446

License Nos.: NPF-87; NPF-89

Enclosure:

NRC inspection Report

50-445/98-301;50-446/98-301

l

cc w/ enclosure and Attachments 1-2:

Matt Sunseri, Director

Nuclear Training

l

TU Electric

P.O. Box 1002

Glen Rose, Texas 76043

cc w/ enclosure and Attachment 1 only:

Mr. Roger D. Walker

TU Electric

l

Regulatory Affairs Manager

P.O. Box 1002

' Glen Rose, Texas 76043

Juanita Ellis

President - CASE

!

1426 South Polk Street .

!

Dallas, Texas 75224

l

l

TU Electric

'

Bethesda Licensing

3 Metro Center, Suite 610

Bethesda, Maryland 20814

t

l

E_._

_ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . _ . _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ . _ . . . _

. _ _ _ _ . _ . _ _ _ _ . _ _ _ _ _

_ _ _ _ _ _ _ . _ _

_

.__.________.__________._____________a

___ _ _ _ - _ _ - _ _ _ _ - _ _ _

- _ _ _ _ _ _ - _ _ _

l

.

'

TU Electric

-3-

George L. Edgar, Esq.

Morgan, Lewis & Bockius

L

1800 M. Street, NW

Washington, D.C. 20036

- G. R. Bynog, Program Manager /

Chief Inspector

Texas Department of Licensing & Regulation

Boiler Division

P.O. Box 12157 Capitol Station

. Austin, Texas 78711

Honorable Dale McPherson

'

County Judge

j

P.O. Box 851

j

Glen Rose, Texas 76043

~

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 78756

i

John Howard, Director

- Environmental and Natural Resources Policy

Office of the Governor

P.O. Box 12428

Austin, Texas 78711

I

\\

i

1

m___.______________________________

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ . _ _ _ _ . _ . _ _ _ _ . .

_ ______ __ ..____ _________.__ _ ____ __ _ __J

_

_ _ _

_

_ _ - _ _ _ _ _ - - - _ - - -

.

.

TU Electric

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking Systern (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01)(IE42)

bec distrib. by RIV w/ enclosure and Attachment 1 only:

Regional Administrator

Resident inspector (2)

DRS Director

DRS Deputy Director

DRP Director

DRS-PSB

Branch Chief (DRP/A)

MIS System

Project Engineer (DRP/A)

RIV File

Branch Chief (DRP/TSS)

bec w/ enclosure and Attachment 1-2:

R. Gallo (HOLB/NRR)(MS:9D4)

L. Hurley

DOCUMENT NAME: R:\\__CPSES\\CP301rp.mem

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy wdh enclosures "N" = No copy

C OB

l t)

C:PBA AfJ:PCB

lM

l

RIV:SRE:OB

E/

-

MEMurphy/lrtfb//$$f JLPellet eM

JITapia QV JLPellet d)/

07/(/98

07/$98 9

078/98 l;

07$98

'

' ' '

OFFICIAL RECORD COPY

. .

-__

.

.

TU Electric

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (1 01)CE'2)

}

bec distrib. by RIV w/ enclosure and Attachment 1 only:

Regional Administrator

Resident inspector (2)

DRS Director

DRS Deputy Director

DRP Director

DRS-PSB

Branch Chief (DRP/A)

MIS System

Project Engineer (DRP/A)

RIV File

Branch Chief (DRP/TSS)

{

bcc w/ enclosure and Attachment 1-2:

R. Gallo (HOLB/NRR)(MS:9D4)

L. Hurley

DOCUMENT NAME: R:\\_CPSES\\CP301rp.mem

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:SRE:OB ,j E j C:OB

t)

C:PBA Jf%kOB

lM

l

MEMurphy/Irrib4t6A[ JLPellet d

JITapia QV JLPellet df/

07/(/98

07/9/98

1'

070/98 { /

07$98

'"

OFFICIA~ RECORD COPY

L

B0070

-

_ - - -