Georgia ibwer Company J33 Piedmont Avenue eL Atlanta. Georgia 30308 Telephone 404 526452G '
Mailing Addres3:
- Pbst Othee Box 4545 Atlanta, Georgia 30302
)
Georgia Power
. L. T. Gucwa.
- "'#wn mwpers Manager Nuclear Safety
. and Licensing SL-3002 0458m X7GJ17-V790 August.3, 1987 U. S. Nuclear Regulatory Commission Document Control Desk Hashington, D.C.
20555 PLANT V0GTLE - UNITS 1 AND 2 NRC DOCKETS 50-424 AND 50-425 OPERATING LICENSE NPF CONSTRUCTION PERMIT CPPR-109 SETTLEMENT MONITORING PROGRAM Gentlemen:
By our Letter Number GN-1368 dated May 22, 1987, Georgia Power Company (GPC) requested that 30 Unit 2 structure settlement markers be relocated to improve accessibility and thus reduce surveying costs.
He now propose that 52 Unit 1 markers and 14 additional Unit 2 markers, listed in the enclosed table, be relocated for the same reason.
As was noted in the referenced letter, the markers will be moved to the exteriors of structures or to higher elevations within structures.
Their plan view location will continue to -essentially be the same as shown on drawing AX2055V001, which was transmitted in Appendix A of the referenced letter.
These changes will nct compromise the settlement monitoring program because the new settlement readings will be correlated with the original settlement readings to provide continuous settlement data at the original locations.
It should be noted that marker number 235, which is located in the auxiliary building, was moved 27 feet north when Unit 1 began operations because it would have become inaccessible due to the high radiation level in the original location.
i In addition to the above, we propose to discontinue readings on two markers in the Unit 1 side of the turbine building:
markers number 308 and 310.
These markers were installed at the time of the erosion in the backfill caused by heavy rains in 1979 (reference Final Report on Dawatering and Repair of Erosion in Category 1 Backfill in Power Block Area, August 15, 1980).
These markers are not shown on the drawings since other markers subsequently placed in the same general area provide the required data.
Settlement at markers 308 and 310 has essentially leveled off.
go2l f 6o5N 8708220066 07o003 rz
[ fid DR ADOCK 05000424
,I p
- s..
' Georgia Power U. S. Nuclear Regulatory Commission-August.3, 1987 Page Two He would appreciate your reviewing the proposed modifications to our.
settlement monitoring program and advising us' of your acceptance at your earliest convenience.
Sincerely, Wf--
~!
'L. T. Gucwa HEB/lm
Enclosure:
Markers to be Relocated to Improve Access c: Georaia Power Comoany Mr. R. E. Conway Mr. J. P. O'Reilly Mr. G. Bockhold, Jr.
Mr. J. F. D'Amico Mr. C. W. Hayes GO-NORMS Southern Comoany Services Mr. R. A. Thomas Mr. J. A. Bailey Shaw. Pittman. Potts & Trowbridge Mr. B. H. Churchill, Attorney-at-Law Troutman. Sanders. Lockerman & Ashmore Mr. A. H. Domby, Attorney-at-Law U. S. Nuclear Reaulatory Commission Dr. J. N. Grace, Regional Administrator Ms. M. A. Miller, Licensing Project Manager, NRR (2 copies)
Mr. J. F. Rogge, Senior Resident Inspector-0perations, Vogtle Georaians Against Nuclear Energy Mr. D. Feig Ms. C. Stangler 0458m 7M)775
l l
~
l Georgia Power 1 ENCLOSURE PLANT V0GTLE - UNITS 1 AND 2 NRC DOCKETS 50-424 AND 50-425 OPERATING LICENSE NPF CONSTRUCTION PERMIT CPPR-109 MARKERS TO BE RELOCATED TO IMPROVE ACCESS MARKER N0.
LOCATION - UNIT 1 100 Turbine Building (Non Cat 1) 101 102 103 104 105 106 164 Main Steam Tunnel (Non Cat 1) 165 166 167 168 157 Radwaste Transfer Building (Non Cat 1) 159 Radwaste Solidification Building (Non Cat 1) 160 161 121 Control Building 122 162 169 223 423-1A 172 Cat 1 Tunnel 126 Fuel Handling Building 127 151 229 257 128 Auxiliary Building 133 134 136 233 234 235 0458m E-1 08/03/87 SL-3002
4 Georgia Power 1 i
ENCLOSURE (Continued)
MARKERS TO BE RELQCATED TO IMPROVE ACCESS MARKER NO.
LOCATION - UNIT 1 149 Auxiliary Feedwater Pumphouse 145 Diesel Fuel Oil Storage Tank Pumphouse 146 199 1000 153 NSCH Valve Houses 1001 1003 1004 129 Diesel Generator Building 130 131 132 123 Containment 124 125 MARKER NO.
LOCATION - UNIT 2 224 Control Building 231 Auxiliary Building 232 237 238 249 Diesel Generator Building 250 251 252 225 Containment Building 226 227 426 427 0458m E-2 08/03/87 SL-3002 7N776