ML20236P234
| ML20236P234 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 07/10/1998 |
| From: | Harrell P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dugger C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20236P237 | List: |
| References | |
| 50-382-98-09, 50-382-98-9, NUDOCS 9807160215 | |
| Download: ML20236P234 (5) | |
See also: IR 05000382/1998009
Text
{{#Wiki_filter:_ _ _ _ _ _ _ - _ _ . - _ - - _ _ _ . . g" "' G %,$ UNITED STATES ' t NUCLEAR REGULATORY COMMISSION f , $ REGION IV
s ' 611 RYAN PLAZA DRIVE, SUITE 400
- '+9
AR LINGTON, T EXAS 76011 8064 ..... July 10, 1998 Charles M. Dugger, Vice President Operations - Waterford 3 Entergy Operations, Inc. P.O. Box B Killona, Louisiana 70066 SUBJECT: NRC INSPECTION REPORT 50-382/98-09 AND NOTICE OF VIOLATION Dear Mr. Dugger: From May 3 through June 13,1998, an inspection was conducted at your Waterford Steam Electric Station, Unit 3 reactor facility. The enclosed report presents the scope and results of that inspection. During this inspection, two violations of NRC requirements were identified. The first violation involved the failure to declare Emergency Diesel Generator A inoperable when a barrier was removed exposing the diesel fuel oil feed tank to potential missiles. The second violation involved a failure to control the impairment of a fire rated door in the reactor auxiliary building. 1 These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding the violations are described in detailin the enclosed report. Please note that you are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. The NRC will use your response, in part, to determine whether further enforcement action is necessary to ensure compliance with regulatory requirements. In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosures, and your response will be placed in the NRC Public Document Room (PDR). Should you have any questions concerning this inspection, we will be pleased to discuss them with you. Si , ! 1 x\\ f ' fillip H. Harrell, Chief f j / Pr 'ect Branch D ' Div ion of Reactor Projects 9807160215 980710 PDR ADOCK 05000382 G PDR l.
- __ _ ___ _ __ _ _ - ______________- _ _--
. . Entergy Operations, Inc. -2- n Docket No': 50-382 . License No.: . NPF-38 Enclosures: - 1. Notice of Violation - 2.' NRC Inspection Report 50-382/98-09 cc w/ enclosures: , Executive Vice President and ' L Chief Operating Officer ! Entergy Operations, Inc. P.O. Box 31995 Jackson, Mississippi 39286-1995 , . Vice President, Operations Support L Entergy Operations, Inc. P.O. Box 31995 Jackson, Mississippi 39286-1995- Wise, Carter, Child & Caraway
l P.O. Box 651. ~ l Jackson, Mississippi 39205 - ' General Manager, Plant Operations l- Waterford 3 SES ' Entergy Operations, Inc. L P.O. Box B l Killona, Louisiana 70066 Manager- Licensing Manager Waterford 3 SES . Entergy Operations, Inc. P.O. Box B < l. Killona, Louisiana 70066 Chairman Louisiana Public Service Commission One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 I' !~ ' i O_____-' ' '
- - __ _ _- ______-___---_ _ _---_-_ _ __ _ _ _ - - _ _ _ _ - - _ __-__ . .. l J . . Entergy Operations, Inc. -3- Director, Nuclear Safety & Regulatory Affairs Waterford 3 SES Entergy Operations, Inc. P.O. Box B Killona, Louisiana 70066 Williarn H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 70057 < Mr. William A. Cross ) Bethesda Licensing Office 3 Metro Center Suite 610 Bethesda, Maryland 20814 Winston & Strawn 1400 L Street, N.W.- Washington, D.C. 20005-3502 , l 1 l l i 1 > I l ' l L--_-_----_-------_---__---_-- - - . - _ _ _ - - - - - - - )
_ _ _ _ _ _ _ _ _ - _ _ . . _ _ _ _ _ _ ._ - __-_______-_____ ___-___ -._- ____________ _ . \\- Entergy Operations, Inc. -4 l E-Mail report to T. Frye (TJF) E-Mail report to D. Lange (DJL) E-Mail report to NRR Event Tracking System (IPAS) E-Mail report to Document Control Desk (DOCDESK) E-Mail report to Richard Correia (RPC) E-Mail report to Frank Talbot (FXT) bec to DCD (IE01) bec distrib. by RIV: Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/D) MIS System Project Engineer (DRP/D) RIV File Branch Chief (DRP/TSS) DOCUMENT NAME: R:\\ WABWT809RP.TRF ~ To receive copy of document. indicate in box: "C" = Copy without enclosures
- E' = Copy with hclosures "N* = No copy
RIV:RI:DRP/p PE:DRPp,f) SRI:DRP/Q h C:Dptff[[, 3)f JMKeeto$$$h GAPickPk TRFarnhbt(@ PHRag#ff 074/98 0 07/Td98 07h/98 ] 07M98\\ ' OFFICIAL RECORD COPY \\ l j
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ - _ _ _ .. Entergy Operations, Inc, -4 l- E-Mail report to T. Frye (TJF) - E-Mail report to D. Lange (DJL) E-Mail report to NRR Event Tracking System'(IPAS) - E-Mail report to Document Control Desk (DOCDESK) , L E-Mail report to Richard Correia (RPC) i E-Mail report to Frank Talbot (FXT) bec to DCD (IE01) , l l bec distrib. by RIV: Regional Administrator Resident inspector l DRP Director DRS-PSB - . Branch Chief (DRP/D) MIS System , l Project Engineer (DRP/D) RIV File Branch Chief (DRP/TSS) ! I l l I i '~0077 x .) DOCUMENT NAME: R:\\ WAT\\WT809RP.TRF To receive copy of document.-indicate in box: "C" a Cooy without enclosures "E"=Copywithhclosures"N"-Nocopy , l RIV:Rl:DRP/p PE:DRP/D,_ p SRI:DRP/D p C:Dpf/C[, j)/ . l JMKeeto@ls GAPicklM TRFarnhbtt$b( PHHagpf/ ' 07/j/98 .\\ 07/N98 07/1/98 \\l 07/R981 ' OFFICIAL RECORD COPY \\ . 1 }}