Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-2414, Responds to NRC Re Violations Noted in Insp Rept 50-499/87-48.Corrective Actions:Procedure Will Be Revised to Require Use of Black Electromagnetic Zinc-coated Bolting Matl for Future Installation of Duet Flanges + (05:34:58, 3 December 2024)
- ML20236P447 + (05:34:58, 3 December 2024)
- ML20236P443 + (05:34:59, 3 December 2024)
- ML20236P441 + (05:35:00, 3 December 2024)
- ML20236P440 + (05:35:01, 3 December 2024)
- ML20236P438 + (05:35:02, 3 December 2024)
- ML20236P439 + (05:35:02, 3 December 2024)
- ML20236P437 + (05:35:03, 3 December 2024)
- ML20236P436 + (05:35:04, 3 December 2024)
- 05000278/LER-1987-009-02, :on 871012,RHR Shutdown Cooling & LPCI Isolation Valve MO-3-10-25B Closed Unexpectedly During Testing.Caused by Deficient Procedure ST 1.3-3.Procedure Will Be Revised Prior to Startup + (05:35:08, 3 December 2024)
- ML20236P434 + (05:35:08, 3 December 2024)
- ML20236P433 + (05:35:09, 3 December 2024)
- ML20236P432 + (05:35:10, 3 December 2024)
- ML20236P431 + (05:35:10, 3 December 2024)
- ML20236P429 + (05:35:11, 3 December 2024)
- ML20236P427 + (05:35:11, 3 December 2024)
- ML20236P426 + (05:35:12, 3 December 2024)
- B17270, Forwards Sixth Periodic Rept Entitled, Progress Toward Restart Readiness at Millstone Station - Northeast Utilities Briefing for NRC, Reflecting Assessment of Readiness to Resume Safe Power Operations + (05:35:13, 3 December 2024)
- ML20236P424 + (05:35:13, 3 December 2024)
- ML20236P422 + (05:35:14, 3 December 2024)
- ML20236P423 + (05:35:14, 3 December 2024)
- ML20236P416 + (05:35:16, 3 December 2024)
- 05000424/LER-1987-047, :on 870708,main Turbine Trip Initiated Automatic Reactor Trip.Caused by Spurious Actuation of Temp Switch Tsh 6807.Mercoid Snap Action Switch Installed to Replace Mercury Wet Type Switch + (05:35:20, 3 December 2024)
- 05000296/LER-1987-004-04, :on 871013,diesel Generator 3EB Inadvertently Started During Preventative Maint.Caused by Governors Being Out of Adjustment Due to Personnel Error.Training Will Be Given to Electrical Technicians + (05:35:21, 3 December 2024)
- ML20236P412 + (05:35:22, 3 December 2024)
- ML20236P409 + (05:35:23, 3 December 2024)
- IR 05000348/1998003 + (05:35:24, 3 December 2024)
- ML20236P406 + (05:35:24, 3 December 2024)
- ML20236P404 + (05:35:28, 3 December 2024)
- ST-HL-AE-2413, Application for Amend to License NPF-71,revising Tech Specs 3.0.4,4.0.3 & 4.0.4 in Accordance W/Generic Ltr 87-09.Fee Paid + (05:35:28, 3 December 2024)
- ML20236P400 + (05:35:29, 3 December 2024)
- ML20236P399 + (05:35:30, 3 December 2024)
- ML20236P396 + (05:35:31, 3 December 2024)
- TXX-6963, Final Deficiency Rept CP-87-01,re Error in Finite Element Computer Model for Safeguards Bldg.Initially Reported on 870114.Analysis Concludes Designs Acceptable.Issue Not Reportable Under 10CFR50.55(e) + (05:35:32, 3 December 2024)
- ML20236P395 + (05:35:32, 3 December 2024)
- ML20236P393 + (05:35:33, 3 December 2024)
- ML20236P392 + (05:35:34, 3 December 2024)
- IR 05000324/1998004 + (05:35:35, 3 December 2024)
- ML20236P391 + (05:35:35, 3 December 2024)
- TXX-6950, Interim Deficiency Rept CP-87-47 Re Consumable Matls Replacement Program.Initially Reported on 870717.Evaluation Continuing.Next Rept Will Be Submitted by 880209 + (05:35:36, 3 December 2024)
- ML20236P386 + (05:35:37, 3 December 2024)
- IR 05000285/1987013 + (05:35:38, 3 December 2024)
- ML20236P382 + (05:35:40, 3 December 2024)
- ML20236P381 + (05:35:40, 3 December 2024)
- 0CAN108706, Responds to NRC Re Violations in Insp Repts 50-313/87-15 & 50-368/87-15.Corrective Actions:Project Structured to Reconcile safety-related Piping Isometric & Hanger Drawings w/as-built Plant Conditions Implemented + (05:35:41, 3 December 2024)
- ML20236P373 + (05:35:42, 3 December 2024)
- ML20236P372 + (05:35:43, 3 December 2024)
- ML20236P369 + (05:35:44, 3 December 2024)
- ML20236P370 + (05:35:44, 3 December 2024)
- SVP-98-249, Monthly Operating Repts for June 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 + (05:35:45, 3 December 2024)
- ML20236P366 + (05:35:46, 3 December 2024)
- IR 05000412/1987048 + (05:35:48, 3 December 2024)