_ _ _,

C' o

UNITED STATES g

[

p, NUCLEAR REGULATORY COMMISSION g

j WASHINGTON. D. C. 20555

,o Docket No.

50-425 0 AU61987 Mr. James P. O'Reilly Senior Vice President - Nuclear Operations l

Georgia Power Company P.O. Box 4545 Atlanta, Georgia 30302

Dear Mr. O'Reilly:

Subject:

Request for Withholding Information from Public Disclosure By your application dated July 15, 1987, you submitted Westinghouse Report No.

WCAP-11531, " Technical Bases for Eliminating Pressurizer Surge Line Rupture as the Structural Design Basis for Vogtle Unit 2," and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. Also enclosed was an affidavit from the Westinghouse Electric Corporation dated July 13, 1987.

The affadavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

1.

The document contains information which is customarily held in confidence by Westinghouse.

2.

The information has been held in confidence by Westinghouse and is not available in public sources.

3.

The information is the result of analyses performed by expenditure of considerable time and effort to Westinghouse.

We have reviewed your application and the material based on the requirements and criteria of 10 CFR 2.790 and on the basis of Westinghouse's statements, have determined that the submitted information sought to be withheld contains trade secrets or proprietary commercial information.

Therefore, the Westinghouse Report No. WCAP-11531 marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of per-sons properly and directly concerned to inspect the documents.

If the need arises, we may send ccpies of this information to our consultants working in this area. We will, of course, insure that the consultants have signed the appropriate agreements for handling proprietary infonration.

8708120355 870806 PDR ADOCK 05000425 A

PDR

. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

You should also understand that the NRC may have cause to review this determination in the future, such as if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, Melanie A. Miller, Project Manager Project Directorate II-3 Division of Reactor Projects I/II cc:

See next page DISTRIBUTION:

Docket File NSIC NRC PDR PRC System Local PDR PDTI-3 Reading MDuncan MMiller BJYoungblood Reading EShomaker, OGC-Bethesda EJordan JPartlow SVarga/Glainas

'0 l

C

(

RPI/II PQy j!/0RPI/II 03C-Bethesda PDI PI/II fR]'lTer/ rad Mk MDdn un/ rad EShomaker BJY un b ood 08/[/87 08/ /87 08/ /87 08/ /7 i

4 Mr. J. P. O'Reilly Georgia Power Company Vogtle Electric Generating Plant CC:

1 Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Commission I

Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Office of.the Consumers' Utility

~Vogtle Project Council Georgia Power Company /

Suite 225

. Southern Company Services, Inc.

32 Peachtree Street, N.W.

P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Paul D. Rice Troutman, Sanders, Lockerman, Vice President & Project General Manager

& Ashmore Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.

Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.

P.O. Box 2625 Carol Stangler Birmingham, Alabama 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake, Jr.

Atlanta, Georgia 30307 Bruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.

Washington, D. C.

20037 Mr. G. Bockhold, Jr.

Vogtle Plant Manager Georgia Power Company Route 2, Box 299-A Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 fir. R. E. Conway Senior Vice President and Project Director Georgia Power Company Rt. 2, P. O. Box 299A Waynesboro, Georgia 30830

_ - _ _ - _ _.