.5 -

BYRON NUCLEAR POWER STATION

. UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT l

COKMONWFJLTH EDISON COMPANY NRC DOCKET NO. 050-454 NRC DOCKET NO.. 050-455 LICENSE NO. NPF-37 LICENSE NO. NPF-66 4

I B711100002 87f880 PDR ADOCK O y4,

a _

I L

(0625M/0062M-2) 74-

af' ij '

I. Monthly Report for Byron Unit'1 for the month of October 1987 A. Summary of Operating Experience for Unit 1 The unit' began.this reporting. period in Mode.1 at'98% power. .On 10/7/87 power was reduced to 50% for repair'of-the rod drive. system.: Power was returned to 98% by 10/8/87. On 10/27/87 power was reduced to 53% to-repair the 1C feedwater pump. The unit. operated at power levels of up to l 98% for the rest of the reporting period. '1 l

l

(.  ;

'l l

l l

l (0625M/0062M-3) 1 L. . _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .________ - __

.i- _

~.'.

B :. OPERATING DATA REPORT DOCKET NO.:1 050-454:

' UNIT: ; Byron Ons:

.DATE: 11/10/87-COMPILED BY: ~ D.:J. Spitzer .

TELEPHONE:. (815)234-5441' i:

'x2023 I; . OPERATING' STATUS

1. Reporting Period: October 1987. Gross Hours:, 743**:
2. Currently Authorized Power Level (MWt)s 3411 Design Electrical Rating:'1175 .(MWe-gross)'.- *

' Design Electrical. Rating: 1120-(MWe-net)

Max Dependable Capacity.(MWe-net): 'NOT. DETERMINED

3. Power Level to Which Restricted (If'Any): 1097;
4. Reasons for Restriction;(If Any):-~ Steam Generator Split Flow (23MW)E THIS MONTH YR'TO DATE CUMULATIVE *
5. Report Period Hrs. -743 7294- 18623
6. Rx Critical Hours 743' 4744 '13846
7. Rx Roseeve Shutd'wno Hours 0- ~37.8
8. Hours Generator on:Line 743 4541' '.13495'1
9. Unit Reserve Shutdown Hours 0 0 0
10. Gross Thermal. Energy (MWH) 2343715 12469832 39015666-
11. Gross Elec. Energy (MWH) 790337 '4170968 13095200
12. Net Elec. Energy (MWH) 749178 3871424 12289502~
13. Reactor Service Factor. 100 65 .74.3
14. Reactor Availability Factor 100 65- 75
15. Unit Service Factor 100 63 73
16. Unit Availability Factor 10 0 -.' 63 73
17. Unit Capacity Factor (MDC net) N/A N/A N/A
18. Unit Capacity Factor (DER net) 90 47.4 59
19. Unit Forced Outage Hrs. 0 135.1 912.1 1
20. Unit Forced Outage Rate 0 2.88- 6.33-
21. Shutdowns Scheduled Over Next 6 Months:
22. If Shutdown at End of Report Period, Estimated Date of Startup:
23. Units in Test Status (Prior to Comercial Operation): . See. Unit 2 (II.B.23).
  • Note - The cumulative numbers do not reflect power generated prior to commercial- )

service.

    • One less hour in period due.to the time change.

-(0625M/0062M-4)  !

.t l

O.I_ - -

)

3 C. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-454 UNIT: Byron One DATE: 11/10/87 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 i

MONTH: October, 1987 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

1. 1072 MW 16. 978 MW
2. 1072 MW 17. 1066 MW j
3. 1058 MW 18, 796 MW
4. 1058 MW 19. 979 MW
5. 1067 MW 20. 1042 MW
6. 1071 MW 21. 1018 MW
7. 899 MW 22. 1061 MW
8. 1016 MW 23. 1066 MW
9. 981 MW 24. 1066 MW __
10. 1052 MW 25, 1034 MW
11. 1040 MW 26. 1012 MW
12. 1037 MW 27. 962 MW
13. 1027 MW 28. 683 MW
14. 962 MW 29, 939 MW
15. 964 MW 30. 1036 MW
31. 1047 MW INSTRUCTIONS On this form list the average daily unit power level in liWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures l will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there l may be occasions when the daily average power level exceads the 100*/. line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

(0625M/0062M-5)

t d n r e a p v C m e u r e P P v i W o r F t D C )

n d 1 o o 1 o** i R x t6 e

  • t i r1 c
  • c p F o0 a
  • w o n eG o
  • e S T e r tRE o
  • v n o e R o
  • i  %  % o p

ff etU o

  • t 0 3 H ohnN o
  • c 5 5 m s S e(

v .

o

  • e o & nn C o o yE e oN* r o o oO* r t t Fiir l oR* o & ttt ei

_ oY* C n n t caneF eB* w w m i urEs o * & o o e bra it paeR n) c

  • D D t s

_

  • e s y

hset cE

_ e

  • s p p xnraiL e
  • u m m S EIPDL(

_ e

  • a a a .

n

  • C R R

_ o

  • o
  • o**

t n

e n

_ o p m d m a a S o rm- o N C cadL O S re

_ I cud T l 1 a r. S in cr e C m U

D t e d o

uuot ue nnt ndh E) s h aauoet

_ R3 y t e

MMACRO

/ S M 1234$9

_ I '

_ N r U e NT bt i

( b N

m u

r

_ S R o

_ T E r

_ I L r N E U n rn d ireo n o mehi o h d ptt i AOOc

_ t 5 5 t

_ e - - iga M FGHrnntii snm

_ n o et. eia

_ s rs Rax a ue yT rE e l T gr R i e

_ arnors s Foit on

_ 7 r l at e

_ 8 u pt el ac

_ 9 o n i nuuri

_ 1 H o uif gel qaeep

_ s

_ , a EMRRO&

r e e - - - - -

_ e p R ABCDE

_ b y

_ o T

_ t

_ c

_ O * *

  • 7 7 *
  • e
  • -y***

_ d 8 8

  • o t / /

a i 7 7

  • r D 0 2
  • r*

e / /

  • a*

n

_ P 0 0

  • d 1 1
  • u n ** ed t
  • u* ce r
  • S* rh o . *
  • E oc p o 9 0 *
  • P FS e N 1 *
  • Y - -

R * *

  • T FS

i I_ UNIQUE REPORTING REQUIREMENTS (UNIT 1) for the month o'f October 1987 t-Safety / Relief-valve operations for Unit One.

I VALVES NO & TYPE PLANT DESCRIPTION ACTUATED ACTUATION CONDITION .OF EVENT lCATE None i Licensee generated changes to ODCM. (Y/N)

No Indications of failed fuel. (Y/N)

No.

525M/0062M-7)

e

$Q

'c

t

l&s,).e.
4f%

'+s*S&~::) f;.5$?::

m..

,J l

  • F. LICENSEE EVENT REPORTS (UNIT 1)

.The following is a' tabular summary of all' Licensee Event Reports for Byron Nuclear Power Station, Unit One,' submitted during the reporting period, .

October 1 throughLOctober 31, .1987. This information.is provided pursuant to' the. reportable-occurrence reporting requirements as set forth in'10CFR 50.73. .

t

. Occurrence Licensee Event Report Number Date-' Title of Occurrence

~

87-021-00' 09/17/87 ' VC Makeup Train Auto Start Due to Quad City Station Trip 7

l-l l

l

.s (0625M/0062M-8) w

1

'l II. Monthly Report for Byron Unit 2 for the month of October 1987 A. Summary of Operating Experience for Unit' 2 - ,

l

-The unit began this reporting period in Mode 1 at 88% power. At 1323 on'10/1/87 a reactor trip' occurred. On 10/2/87 at 0445 the unit was-synchronized.to the grid. At 0446, the same day, a turbine' trip, reactor trip occurred due to hi steam generator level. At 1855 on aj

'10/3/87 the reactor was taken critical. At 2347, the same day, a 4 generator trip occurred. The unit was synchronized to the grid at i 0913 on 9/4/87. power was increased to 94% by 10/8/87. The unit.  ;

operated at power levels of up to 95% for the rest of:the' reporting j period.

i u

I l

'l l

(0625M/0062M-9) ca

'M

~ '

-B. OPERATING DATA REPORT  !

DOCKET NO. 050-455 UNIT: Byron Two DATE: 11/10/87 COMPILED BY: D. J. Spitzer i TELEPHONE: (815)234-5441 >

x2023 OPERATING STATUS

1. Reporting Period: October 1987. Gross Hours: 743**
2. Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross) '

Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity (MWe-net): NOT DETERMINED

3. Power Level to Which Restricted (If Any): 1055
4. Reasons for Restriction (If Any): Steam Generator Split Flow. (65 MW)

THIS MONTH YR TO DATE CUMULATIVE *

5. Report Period Hrs. 743 1727 1727 j
6. Rx Critical Hours 697 1475 1475
7. Rx Reserve Shutdown Hours 0 0 0
8. Hours Generator on Line 675.2 1439 1439 l t
9. Unit Reserve Shutdown Hours 0 0 0  :

I

10. Gross Thermal Energy (MWH) 1996878 4388540 4388540 j
11. Gross Elec. Energy (MWH) 671579 1413473 1413473
12. Net Elec. Energy (MWH) 634809 1330574 1330574
13. Reactor Service Factor 94 85.4 85.4 l
14. Reactor Availability Factor 94 85.4 85.4
15. Unit Service Factor 91 83.3 83.3
16. Unit Availability Factor 91 83.3 83.3
17. Unit Capacity Factor (MDC net) N/A N/A N/A
18. Unit Capacity Factor (DER net) 76.3 69 69  ;

l 19. Unit Forced Outage Hrs. 67.8 288 288 l

20. Unit Forced Outage Rate 9 17 17
21. Shutdowns Scheduled Over Next 6 Months: 11/28/87  !

i

22. If Shutdown at End of Report Period, Estimated Date of Startup:  !
23. Units in Test Status (Prior to Commercial Operation): (UNIT 2)

Forecast Achieved Initial Criticality 01/07/87 01/09/87 Initial Electricity 02/05/87 02/06/87 Commercial Operation 05/31/87 08/21/87

  • Note - The cumulative numbers do not reflect power generated prior to commercial service.  !
    • One less hour in time period due to the time change. l j

(0625M/0062M-10) 1 L___ _ _ _ - - _ - -

'5' C. AVERAGE DAILY UNIT POWER LEVEL F .

DOCKET NO.:) 050-455 '!

UNIT: l Byron Two.<

DATE: .11/10/87-

')

COMPILED BY: D.'J.-Spitzer' TELEPHONE: '(815)234-5441; .1 x2023. ij MONTH: October, 1987

.a DAY AVERAGE DAILY POWER LZVEL (MWe-Net) j

1. 485 MW 16. 962 -MW
2. MW :17. 1031' MW u

~

3. -22 MW 18, 949 MW
4. 104 MW 19. 890 MW'

! 5. 419 MW 20. 992~ MW. l

6. 909' MW ~21. 1025 MW
7. 1008 MW 22, 1030 MW '  !

l

8. 1037 MW 23. '1007 MW i i
9. 1009 MW 24. 1022 MW -j 1
10. 1025 MW 25. 973 'MW d i
11. 1018 MW 26, 1000 MW- ,

.t l 12. 988 MW 27. 1022- MW

13. 797 MW 28, 1027 MW j 14, 810 MW 29. -1031 MW
15. 810 MW 30. 1031 MW l

l 31. 1022 MW  !

l '!

l INSTRUCTIONS i On this form list the average daily. unit. power level in MWe-Net for each' day in the reporting month. Compute to the nearest lwhole megawatt. . These figures will be used to plot'a graph for each reporting month. Note.that when maximum dependable capacity is used for the net electrical' rating of the unit there may be occasions when the daily average power' level exceeds the 100% line (or the' restricted power level line.)- In such cases the average' daily unit power output sheet should be^ footnoted to explain:the apparent,. anomaly. >

l i

i (0625M/0062M-11)

_ _ _ _ = _ _ __. - 2

u P c t e W n R F i M o p

t n B t e 2 e v s e n r o 2 P -

g i )

o n H t6 1

cO

  • t i r1 e
  • k e o0 a
  • n r h p-c
  • o o t t n eG e
  • i w r c
  • t e e n o tRE e R e
  • c e v c
  • A t o o ff etU n
  • i b p H ohnN e
  • e n a m s S e(

e

  • v a o &nn v cN* i m g C o o yE e cO* t r n Fiir l oR* c u i & ttt ei cY* e F l t caneF aB* r l m iurEs c
  • r - e e b ra it paeR n) e
  • o w t e
  • C e s s h set cE c
  • s y xnraiL c * & u l S EIPDL(

e

  • a e s
  • e C v o
  • s e c
  • u e 1 a

c0

  • l C G

_ b

_ a /

_ b S o

r C P 2 m d a a

_ S t rm o N n p cadL O e P S re I n G cud

_ T o p

W /

S llS ne aa icr

_ C F U m d uuot ue o

D o B C nnt ndh E) C 2 2 h aauoet R2 t MMACRO

_ / m e - - - - - -

ST M 123459

_ e NI t WN s OU y W P D( S F R

_ T U r H e 0 0 r

S b 0 0

_ m -

o T u 8 9 r I N 1 1 r N 0 0 E U R - - n rn n E 7 7 ireo L 8 8 mehi o d ptt i d AOOc iga t

_ o - -

_ h FGHrnn tii 3

t 3 snm

_ e M et eia

_ rs R ax

_ n ue rE

_ o l T gr yT e

s i

_ a A A arnors

_ e F oit on 7 R l at e pt el ac 8

n 9 s 3 5 i nuuri 1 r o uif gel qaeep u 5 2 s

, o 1 5 a EMRRO&

b r

e H

e R

e - - - - -

ABCDE o p

- t c

y F F )

_ T * *

  • 2

_ O *

  • 1 7 7

_ d 8 8 * * -

o e / / *

  • M i t 1 2
  • y* 2

_ r a 0 0

  • r* 6 a*

e D / /

  • 0 P 0 0
  • m* d 0 1 1
  • m*
  • u*

ed ce

/

M t 5 r

  • S* rh o . *
  • E oc 2 p o . . *
  • P FS 6 e N 3 4 *
  • Y - - 0 R * *
  • T FS (

4- ,

E. - UNIQUE REPORTING REQUIREMENTS (UNIT '2)' fer the month tf- Octrb7r 1987-1.' Safety / Relief-valve. operations for Unit Two.-

, ' VALVES NO & TYPE PLANT DESCRIPTION I DATE ' ACTUATED ACTUATION- CONDITION OF EVENT None

's 2.- Licensee generated changes to ODCM. -(Y/N)

-i No j

3. Indications of failed fuel. '(Y/N)

~i Yes I131 = 10-2 pcuries/ gram. i l

1 l

l 1

l l

l i

l i

j'. .

(0625M/0062M-13)

p-F. ~ LICENSEE EVENT' REPORTS '(UNIT 2)-

1 The following is a tabular. sumary of ~all Licensee Event Reports for Byron ,j

, Nuclear Power Station,. Unit Two, submitted during the. reporting: period, October 1 through October 31, 1987. This information is provided pursuant to:-

.the reportable occurrence: reporting requirementsfas set forth in 10CFR.50.73.

Occurrence- )

Licensee Event Report Number Date -Title of Occurrence .l l

87-017-00 09/03/87' Misse'd'ISI Stroke Test After ~  ;

Completion of: Maintenance .on -1 MS101C Solenoid.

L 87-018-00 10/01/87 Reactor Trip Due to Loss of Feedwater Pump.

87-019-00 10/02/87' Reactor Trip and Loss of Offsite Power.

l l

l l i

l i

I i

1 i

.j l

(0625M/0062M-14)

i November 10, 1987 LTR: BYRON 87-1110 File: 2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulatory Commission a i

Washington, D.C. 20555 ATTN: Document Control Desk Gentlemen:

Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period October 1 through October 31, 1987.

Very truly yours,

.l j

R. E. Querio Station Manager {

Byron Nuclear Power Station j REQ /DJS/bb I'

cc: A.B. Davis, NRC, Region III NRC Resident Inspector Byron Gary Wright, Ill. Dept. of Nuclear Safety K.L. Graesser T.J. Maiman L.D. Butterfield Nuclear Fuel Services, PWR Plant Support L. Anastasia, Station Nuclear' Engineering INPO Records Center Thermal Group, Tech Staff Byron Station Nuclear Group, Tech Staff Byron Station L. Olshan - USNRC j I

D.J. Spitzer (0625M/0062M-1)