Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19338C991 + (20:59:28, 25 December 2024)
- IR 05000010/1975020 + (20:59:36, 25 December 2024)
- ML19338C987 + (20:59:39, 25 December 2024)
- IR 05000010/1977030 + (20:59:44, 25 December 2024)
- ML19338C983 + (20:59:46, 25 December 2024)
- ML19338C981 + (20:59:48, 25 December 2024)
- IR 05000010/1977029 + (20:59:50, 25 December 2024)
- ML19338C979 + (20:59:52, 25 December 2024)
- ML19338C977 + (20:59:57, 25 December 2024)
- IR 05000010/1977020 + (21:00:00, 25 December 2024)
- ML19338C974 + (21:00:04, 25 December 2024)
- ML19338C972 + (21:00:07, 25 December 2024)
- ML19338C971 + (21:00:09, 25 December 2024)
- ML19338C969 + (21:00:17, 25 December 2024)
- ML19338C966 + (21:00:19, 25 December 2024)
- ML19338C965 + (21:00:23, 25 December 2024)
- ML19338C962 + (21:00:25, 25 December 2024)
- ML19338C961 + (21:00:28, 25 December 2024)
- ML19338C960 + (21:00:30, 25 December 2024)
- ML19338C959 + (21:00:32, 25 December 2024)
- ML19338C958 + (21:00:34, 25 December 2024)
- ML19338C957 + (21:00:36, 25 December 2024)
- ML19338C956 + (21:00:37, 25 December 2024)
- ML19338C955 + (21:00:40, 25 December 2024)
- ML19338C954 + (21:00:42, 25 December 2024)
- ML19338C952 + (21:00:44, 25 December 2024)
- ML19338C951 + (21:00:50, 25 December 2024)
- ML19338C949 + (21:00:53, 25 December 2024)
- 05000265/LER-1980-017-03, /03L-0:on 800724,during Testing,Pressure Switch PS-2-1622B Was Found to Actuate at 20.3 Rather than 13.8 Inches of Water.Caused by Setpoint Drift.Switch Replaced + (21:01:12, 25 December 2024)
- 05000265/LER-1980-017, Forwards LER 80-017/03L-0 + (21:01:31, 25 December 2024)
- ML19338C945 + (21:01:34, 25 December 2024)
- 05000265/LER-1980-016-03, /03L-0:on 800723,discovered That Pressure Switch PS-2-261-30C Would Trip at 841 Psig,Under Limit of 850 Psig. Caused by Instrument Drift.Pressure Switch Recalibr & Tested Satisfactorily + (21:02:12, 25 December 2024)
- ML19338C941 + (21:02:15, 25 December 2024)
- ML19338C939 + (21:02:18, 25 December 2024)
- 05000306/LER-1980-022-03, /03L-0:on 800805,during Surveillance test,fan-coil Unit Dome Damper 23 Could Not Be Positioned Properly.Caused by Leaking Air Supply Line to Damper Actuator.Air Supply Line Replaced + (21:02:33, 25 December 2024)
- 05000265/LER-1980-016, Forwards LER 80-016/03L-0 + (21:02:45, 25 December 2024)
- 05000306/LER-1980-022, Forwards LER 80-022/03L-0 + (21:02:52, 25 December 2024)
- 05000327/LER-1980-129-03, /03L-0:on 800808,while Operating in Mode 2 at 3.5% Power,Diesel Generator 1A-A Failed to Start During Simulated Loss of Power to 2A-A 6.9-kV Shutdown Board.Caused by 43T (L) Switch Being Left in Test Position from Previous T + (21:02:58, 25 December 2024)
- ML19338C927 + (21:03:01, 25 December 2024)
- 05000327/LER-1980-129, Forwards LER 80-129/03L-0 + (21:03:05, 25 December 2024)
- 05000327/LER-1980-140-03, /03L-0:on 800809,during Preoperational Test,Diesel Generator 86LOR Relay Coils Burned Out Following Blackout Initiation.Caused by 86LOR Relay Being Reset Before Blackout Relays.Coils Replaced & Relays Reset + (21:03:08, 25 December 2024)
- AECM-80-198, Interim Deficiency Rept Re Fractured Actuator to Damper Shaft Couplings in Diesel Generator Bldg Bay A.Final Evaluation to Be Completed by 801219 + (21:03:10, 25 December 2024)
- 05000327/LER-1980-140, Forwards LER 80-140/03L-0 + (21:03:23, 25 December 2024)
- ML19338C919 + (21:03:25, 25 December 2024)
- 05000327/LER-1980-142-03, /03L-0:on 800718,during Testing W/Unit in Mode 3, Ice Bed Temp Exceeded Tech Spec Limit of 27 F.Caused by Insufficient Recovery Time Between Personnel Entries & Exits.Work Halted & Temp Reduced to 27 F,19.5-h Later + (21:03:29, 25 December 2024)
- 05000327/LER-1980-142, Forwards LER 80-142/03L-0 + (21:03:32, 25 December 2024)
- 05000327/LER-1980-138-03, /03L-0:on 800801,during Heavy Thunderstorm,Cooling Tower Blowdown Line Effluent Monitor Declared Inoperable. Caused by Nearby Lightning Strike or Power Line Surge. Damaged Parts Being Repaired & Backup Channel Installed + (21:03:37, 25 December 2024)
- 05000327/LER-1980-138, Forwards LER 80-138/03L-0 + (21:03:41, 25 December 2024)
- ML19338C912 + (21:03:43, 25 December 2024)
- ML19338C910 + (21:03:45, 25 December 2024)
- ML19338C909 + (21:03:46, 25 December 2024)