Forwards IE Insp Repts 50-010/75-20,50-237/75-26 & 50-249/75-23 on 751105-07 & 25-26.Noncompliance Noted
ML19338C987
Person / Time
Site: Dresden  
Issue date: 12/24/1975
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19338C988 List:
References
NUDOCS 8009120730
Download: ML19338C987 (3)


See also: IR 05000010/1975020

Text

_.

-

_

.

_

_

6

.

-

-

. . . _ .

.

.

e

UNITED STATES

NUCLEAR REGULATORY COMMISSION

-

REClON 111

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

1

DiiC 2 4 19(b

!

Causmosuaalth Edison Company

Doaket No. 50-10'

ATTN

Mr. Byron Lee, Jr.

Docket No. 50-237

Vice President

Docket No. 50-249

F. O. Box 767

Chicago, Illinois

60590

Gentlemen

This refers to the inspection conducted by Messrs. Johnson

and Shafer of this office on November 5-7 and 25-26,1975,

of activities at Dresdes Nuclear Power Station Units 1, 2

and 3 authorised by NBC Operating Licenses No. DPR-2,

No. DPR-19 and No. DPR-25 and to the discussions of ou-

findings with Messrs. Roberts and Abel and others of your

_

staff at the eammlusion of the inspection.

A sopy of our report of this inspection is enclosed and identi-

fios the areas avamin=d during the inspection. Within these

!

areas, the inspection consisted of a selective ar==4 nation of

precedures and representative records, interviews with plant

personnel, and observations by the inspectors.

During this inspection, it wao found that certain of your

activities appear to be in noncompliance with NRC requirements.

ib items and reference to the pertinent requirements are

listed under Enforcement Astion in the Sisiimary of Findings

section of the analosed inspection report.

l

This notica is sent to you pursuant to the provisions of

l

Sestion 2.201 of the NRC's " Rules of Practice," Fort 2,

Title 10, Code of Fedevel Regulations. .Sestion 2.201 requires

!

yes to submit to this office within twenty days of your

receipt of this notice, a written statement or explanation

in reply, including

(1) correstive steps which have been

l

taken by you, and the results as.hieved; (2) corrective steps

PD4 ElGINE

'

8 0 0 9 y 2,o 7 %

9

-

.

. -

-

.

- -

-

.

.

-

--

._. .

._

_ _ _____ _ - _ ___

-

.

l

!

. .

.

.

.

.

0tC Z 4 IdlD

P N th Edison

2-

Company

-

which will be taken to avoid further items of noncompliance;

and (3) the date when full compliance will be schieved.

Except for Infraction Fos. 3 sad 4, suah a statement or

explanation should be provided for each noncompf fmace item

listed. Prior to the conclusion of the inspection, the

inspectors determined that correstive actions had been taken

or were in progress with respect to Infraction Nos. 3 and 4,

and we have ne further questions. regarding these items at

this time.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, code of Federal Regulations, a

copy of this notice, the enclosed inspection report, and your

response to this notice will be placed in tbs NRC's Public

Dosument Boom. If this report contains any information that

you or your contractors believe to be proprietary, it is

_

ancessary that you make a written application to this office,

within twenty days of your receipt of this notice, to with-

held such information from public disclosure. Any such

application must include a full statement of the reasons for

which it is claimed that the information is proprietary. and

should be prepared so the proprietary information identified

in the application is contained in a separate part of the

document. Unless we receive an application to withhold in-

formation or are otherwise contacted within the specified

time period, the written material identified in this para-

graph will be placed in the Public Document Room.

Other noncompliance items identified by your management

controls program which were in the process of being corrected

are sat forth under "Other Significant Findings" in the

Samary of Findings section of the attached inspection report.

No additional information is needed for these items at this

time.

l

b

Iu.

-

-

-

,

-

.

.

.

.

.

Ceamwawaalth Edison

-3-

Company

Sh =1A you have any questions concerning this inspection, we

will be glad to discuss them with you.

Sinserely yours.

Caston Fiore111, Chief

Reestor Operations and

Nealear Support Branch

Enclosures

IE Inspection Rpts No. 050-010/75-20,

No. 050-237/75-26 and No.

050-249/75-23

-

cc w/enci:

'-

3. B. Stephenson

(-

Station Superintend rat

bec w/en';1:

PDR

Local PDR

NSIC

TIC

Anthony Roisman, Esq.

l

l

l

P00RBRICENRI.