_.
-
_
.
_
_
6
.
-
-
. . . _ .
.
.
e
UNITED STATES
NUCLEAR REGULATORY COMMISSION
-
REClON 111
799 ROOSEVELT ROAD
GLEN ELLYN, ILLINOIS 60137
1
DiiC 2 4 19(b
!
Causmosuaalth Edison Company
Doaket No. 50-10'
ATTN
Mr. Byron Lee, Jr.
Docket No. 50-237
Vice President
Docket No. 50-249
F. O. Box 767
Chicago, Illinois
60590
Gentlemen
This refers to the inspection conducted by Messrs. Johnson
and Shafer of this office on November 5-7 and 25-26,1975,
of activities at Dresdes Nuclear Power Station Units 1, 2
and 3 authorised by NBC Operating Licenses No. DPR-2,
No. DPR-19 and No. DPR-25 and to the discussions of ou-
findings with Messrs. Roberts and Abel and others of your
_
staff at the eammlusion of the inspection.
A sopy of our report of this inspection is enclosed and identi-
fios the areas avamin=d during the inspection. Within these
!
areas, the inspection consisted of a selective ar==4 nation of
precedures and representative records, interviews with plant
personnel, and observations by the inspectors.
During this inspection, it wao found that certain of your
activities appear to be in noncompliance with NRC requirements.
ib items and reference to the pertinent requirements are
listed under Enforcement Astion in the Sisiimary of Findings
section of the analosed inspection report.
l
This notica is sent to you pursuant to the provisions of
l
Sestion 2.201 of the NRC's " Rules of Practice," Fort 2,
Title 10, Code of Fedevel Regulations. .Sestion 2.201 requires
!
yes to submit to this office within twenty days of your
receipt of this notice, a written statement or explanation
in reply, including
(1) correstive steps which have been
l
taken by you, and the results as.hieved; (2) corrective steps
PD4 ElGINE
'
8 0 0 9 y 2,o 7 %
9
-
.
. -
-
.
- -
-
.
.
-
--
._. .
._
_ _ _____ _ - _ ___
-
.
l
!
. .
.
.
.
.
0tC Z 4 IdlD
P N th Edison
2-
Company
-
which will be taken to avoid further items of noncompliance;
and (3) the date when full compliance will be schieved.
Except for Infraction Fos. 3 sad 4, suah a statement or
explanation should be provided for each noncompf fmace item
listed. Prior to the conclusion of the inspection, the
inspectors determined that correstive actions had been taken
or were in progress with respect to Infraction Nos. 3 and 4,
and we have ne further questions. regarding these items at
this time.
In accordance with Section 2.790 of the NRC's " Rules of
Practice," Part 2, Title 10, code of Federal Regulations, a
copy of this notice, the enclosed inspection report, and your
response to this notice will be placed in tbs NRC's Public
Dosument Boom. If this report contains any information that
you or your contractors believe to be proprietary, it is
_
ancessary that you make a written application to this office,
within twenty days of your receipt of this notice, to with-
held such information from public disclosure. Any such
application must include a full statement of the reasons for
which it is claimed that the information is proprietary. and
should be prepared so the proprietary information identified
in the application is contained in a separate part of the
document. Unless we receive an application to withhold in-
formation or are otherwise contacted within the specified
time period, the written material identified in this para-
graph will be placed in the Public Document Room.
Other noncompliance items identified by your management
controls program which were in the process of being corrected
are sat forth under "Other Significant Findings" in the
Samary of Findings section of the attached inspection report.
No additional information is needed for these items at this
time.
l
b
Iu.
-
-
-
,
-
.
.
.
.
.
Ceamwawaalth Edison
-3-
Company
Sh =1A you have any questions concerning this inspection, we
will be glad to discuss them with you.
Sinserely yours.
Caston Fiore111, Chief
Reestor Operations and
Nealear Support Branch
Enclosures
IE Inspection Rpts No. 050-010/75-20,
No. 050-237/75-26 and No.
050-249/75-23
-
cc w/enci:
- '-
3. B. Stephenson
(-
Station Superintend rat
bec w/en';1:
Local PDR
Anthony Roisman, Esq.
l