ML19338C966

From kanterella
Jump to navigation Jump to search
Forwards App a to Branch Technical Position Apcsb 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to 760701 & Supplementary Guidance on Info Needed for Fire Protection Program Evaluation
ML19338C966
Person / Time
Site: Dresden, Quad Cities  Constellation icon.png
Issue date: 09/30/1976
From: Goller K
Office of Nuclear Reactor Regulation
To: Bolger R
COMMONWEALTH EDISON CO.
Shared Package
ML19338C968 List:
References
TASK-09-06, TASK-RR NUDOCS 8009101002
Download: ML19338C966 (3)


Text

,j q.

([

t r

..w Occket lio 37/249 Cor.conwealth Edison Company SEE ' E76 ATTH: Mr. R.1.. Bolger Assistant Vice President Post Office Box 767 t

h Chicago, Illinois 60690 t :.

Gentlemen:

F RE:

DRESDEN NUCLEAR POWEP. STATION, U4IT HOS.1/2/3 OUAD CITIES NUCLEAR POWER STATION, UNIT HOS.1/2 In our letter dated May 11,1976,.we requested that you conduct an examination of your facilities to compare its existing fire protection provisions with the guidelines in the Stanoard Review Plan 9.5.1, " Fire Protection," dated May 1,1976, which included Branch Technical Position APCSB 9.5-1.

We are enclosing a copy of Appendix A to Branch Technical Position APCSB 9.5-1, " Guidelines for Fire Protection For Nuclear Power Plants Docketed Prior to July 1,1976* (Enclosure 1). This document presents certain acceptable alternatives for operating plants to the positions given in APCSB 9.5-1.

We are sendi-9 this to you for your information because we will be using Appendix A in our evaluation of yot;r plants..

~

After reviewing the licensee 'submittals made to date in response to our letter, we believe;your initial response "ay not adequately present L

the results of your. fire hazards ~ analysis.be stress that in order k

to begin a re-evaluation of the fire protection program of your facilities,80u must~~ perform a fire hazards. analysis with the assistance p.

and technical direction of-a qualified fire potection engineer.

i:

In order for u's to evaluate your fire hazards analysis we require that if you subnf t the results in sufficient detail. To provide further guidance, we are enclosing a copy of " Supplementary Guidance on Infomation Needed For Fire Protection Program Evaluation" (Enclosure 2).

This document indicates the type of information that will enable us to evaluate the total fire hazards analysis for your facilities.

This type of inforration may or may not be included in the detailed point-by-point conparison with Standard Review Plan 9.5.1 depending upon how you present that information.

_. -m a

/j

//

W/

0 "'C E *

3. ? E P

, s. e AEC 318 (RcT. 9 53) AECM 0240

  1. u. s. oovsmausmr pasatino orricas i.,4.:

qq

'D 1

\\

8.0:0 9 lo;igc::og 1m e

a

/

-l*

[=

Comonwealth Edison Company 2-SEP b 01976 In a'ddition, we request at this tirse that you propose Technical Specifications for your present fire protection systems and inform us of the date you intend to meet Section B of Appendix A " Administrative Procedures, Controls and Fire Brigade". Your presently scheduled suicittal should include the information indicated by Enclosure 2 and proposed Technical. Specifications for the fire protection systems of your facilities..

Sincerely,-

i Original signed by:

Earl R. Go$r Karl R. Goller, Assistant Director for Operating Reactors Division of Operating Reactors

Enclosures:

y 1.

Appendix A to Branch Technical

..g Position APCS 8 9.5-1

=

2.

Supplementary Guidance cc w/ enci: ~

See next page BIIIREIIMIN:

DISTRIBUTION

.=.

Docket (5)

~JRBuchanan

.J.!E NRC PDR (5)1 ACRS.(16)

s+ -

Local PDR (2).,

y ORB #2: Reading --- +

VStello ; r

=TT j

TJCarter 1-DLZiemann RMDiggs (2)

I WEConverse RDSil ver PW0'Connor t'Grotenhuis TWambach OELD - Swanson/Treby/Kannan OI&E (3)-

1

~

~=

WButler

~~

VBenaroya

  • J DEisenhut TBAbernathy M

D0 :0

  1. 2

.: 2 DOR:0RB #2 0RB bOR:0RB#2 DO -

OR

,,,,c,_

DOR;,y y#1

..y WE erse RDSi'lver PW0'Connor;ah TWambach

,DLZiemann K_Gol..

r._. _

9/%/76_, _

9/,1y76 9/ 4 76 9,2f/76 9/y/76._. 9/39/76 f

term ATC 51f (Err. 9-5 3) AIC310240 W u. s. novsahuswv *nswvtwo orricas t eta.ess. nee

f

(

c e

~

Cormonwealth Edison Company 3-SEP 5 01976 cc w/ enclosures:

Mr. Charles Whitmore U'

President and Chairman

" 5i Iowa-Illinois Gas and Electric Company

=

206 East Second Avenue

=..

Davenport, Iowa 52801 Mr. John W. Rowe Isham, Lincoln & Beale

[.,..f=

Counselors at Law g

One First National Plaza, 42nd Floor Chicago, Illinois 60603 Anthony Z. Roisman, Esquire Roisman, Kessler and Cashdan

=

102515th Street, N. W., 5th Floor

=

Washington, D.

C.~

20005 1

Moline Public Library

. [.

504 - 17th Street.

~

Moline, Illinois,61265 7

p Morris Public Library 604 Liberty Street Horris, Illinois 604

~

=.::

I.'.,'

[...

m r:=:.. :- -

L

...:_.~.. _.. _..

?--

. _ z::: -

u._::..~

Fn o
  • ic E
  • G J 9 % s ea t &

oavs >

form AEC.319 (Rev. 9-5 5) Aldi 02+0

  1. u. e. oOVE RN M E NT PRINTING OFFlC E819M.526 lee

. -.... -.