ML19338C977

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-010/77-29 & 50-237/77-26 on 770920-22 & Notice of Violation
ML19338C977
Person / Time
Site: Dresden  
Issue date: 10/05/1977
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19338C978 List:
References
NUDOCS 8009120720
Download: ML19338C977 (2)


See also: IR 05000010/1977029

Text

..

.

CEMRRL FILE 6

O

!

i

!

UNITED ST ATES

  • "EG

NUCLEAR REGULATORY COMMISSION

f

,

f t, )M[,{

REGloN til

,

l

79$ ROOSEVELT RO AD

e

.3

,g

g

GLEN ELLYN. ILLINOIS 60137

j

S '.

  • 7

s, * "v f

/

TOCT 5 197T

50-10/7/'2_.7

Docket No.

Docket No. 50-237

,

i

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Fr. J.

L. Barhar of this

office on September 20-22, 1977, of activities at Dreuen Nuclear

Power Station, Units 1 and 2, authorized by NRC Operating Licenses

No. DPR-2 and No. DPR-19 and to the discussion of our findings with

l

Mr. B. B. Stephenson and others of your staff at the conclusion of

the inspection.

'

The enclosed copy of our inspection report identifies areas examined

l

during the inspection. Within these areas, the inspection consisted

j

of a selective examination of procedures and representative records,

!

observations, and interviews with personnel.

l

During this inspection, certain of your activities appeared to be in

noncomplience with NRC requirements, as described in the enclosed

Appendix A.

The inspection showed that action had been taken to

correct the identified noncompliance and to prevent recurrence.

Consequentle no reply to this noncompliance is required and we have

4 estions regarding this matter at this time.

no further

t

l

In accordance with Section 2.790 of the NRC's " Rules of P actice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

NRC's Public Document Room, except as follows.

If this report

contains information that you or your contractors believe to be

proprietary, you must apply in writing to this office, within

twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include

a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an

enclosure to the application.

fr

//

U O 91 gg 'y

h

.

.

r

---e

--

7

-

~

v-

"

'

-

.

.

Coussonwealth Edison

-2-

DCT 5 isTT

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

(.

Caston Fiorelli, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure s :

1.

Appendix A, Notice of

Violation

2.

IE Inspection Reports

No. 50-010/77-29

and No. 50-237/77-26

,

cc w/encls:

Mr. B. B. Stephenson,

Station Superintendent

'

Central Files

Reproduction Unit **C 20b

PDR

Local PDR

NSIC

TIC

Anthony Roismen, Esq. ,

Attorney

,

RIII

RIII

RIII

RIII

,,,,c,,

,,,,

_

T.ittle

Fiorelli

Shaferk

Barker / _s_

_

[.---

_

su...,

9/30/

o.v ,

NRC FORM 318 (9-76) NRCM 0240

W u. e. ge

t

sa e.ea4

I

&