Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- CLI-88-07, NRC Staff Response to Intervenors Motions to Reopen Record & Admit late-filed Decommissioning Contentions.* Motions Should Be Denied & Stay Imposed by Commission in CLI-88-07 Lifted + (00:35:40, 24 May 2025)
- ML20206J596 + (00:35:45, 24 May 2025)
- TXX-8875, Responds to NRC Re Violations Noted in Insp Repts 50-445/88-56 & 50-446/88-52.Corrective Actions:Rev 8 to TNE-CS-CA-CA-1a Prepared to Incorporate More Conservative Spacing Criteria for Hilti Super Kwik Bolts Installation + (00:35:49, 24 May 2025)
- ML20206J556 + (00:35:55, 24 May 2025)
- ML20206J461 + (00:36:23, 24 May 2025)
- 0CAN059901, Requests Registration of Initial Use on 990427 of Tenth Dry Fuel Storage Cask Utilized at ANO by Providing Listed Info, in Compliance with Requirements of 10CFR72.212(b)(1)(ii) + (00:36:32, 24 May 2025)
- IR 05000333/1986004 + (00:36:57, 24 May 2025)
- ML20206J201 + (00:37:40, 24 May 2025)
- 05000354/LER-1998-008-01, Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a + (00:38:07, 24 May 2025)
- ML20206J057 + (00:38:21, 24 May 2025)
- ML20206J015 + (00:38:32, 24 May 2025)
- IR 05000219/1986015 + (00:38:59, 24 May 2025)
- ML20206H875 + (00:39:03, 24 May 2025)
- IR 05000352/1999301 + (00:40:01, 24 May 2025)
- IR 05000211/2014001 + (00:40:10, 24 May 2025)
- IR 05000361/1999301 + (00:40:52, 24 May 2025)
- ML20206H711 + (00:42:12, 24 May 2025)
- TXX-8877, Forwards Draft Rev 0 to Comanche Peak Steam Electric Station Tech Spec Improvement Program Tech Spec Requirements, Per NRC Rev 4a of Sts,For Review + (00:42:41, 24 May 2025)
- ML20206H470 + (00:43:15, 24 May 2025)
- ML20206H102 + (00:44:36, 24 May 2025)
- ML20206H062 + (00:44:51, 24 May 2025)
- IR 05000482/1985019 + (00:45:03, 24 May 2025)
- ML20206H013 + (00:45:05, 24 May 2025)
- L-99-017, Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers + (00:45:11, 24 May 2025)
- IR 05000461/1999011 + (00:45:16, 24 May 2025)
- TXX-8878, Supplemental Deficiency Rept CP-88-22 Re Svc Water Discharge Pipe Missile Protection.Initially Reported on 880205.Addl Missile Protection Will Not Be Required & Deficiency Not Reportable Under Provisions of 10CFR50.55(e) + (00:45:24, 24 May 2025)
- ML20206G955 + (00:45:26, 24 May 2025)
- IR 05000482/1983013 + (00:45:27, 24 May 2025)
- IR 05000302/1988026 + (00:46:37, 24 May 2025)
- ML20206G905 + (00:46:42, 24 May 2025)
- IR 05000482/1985031 + (00:47:03, 24 May 2025)
- IR 05000458/1988021 + (00:47:16, 24 May 2025)
- ML20206G778 + (00:47:19, 24 May 2025)
- 05000458/LER-1999-005, :on 990228,noted That Standby Swp Was Inoperable for Greater than 30 Days.Caused by Mechanical Failure of Breaker.Breaker E22-S004 ACB-05 Was Replaced with Like,Operable Breaker & Standby Swp Was Declared Operable + (00:47:30, 24 May 2025)
- TAC:MA3478 + (00:49:29, 24 May 2025)
- IR 05000498/1988046 + (00:49:35, 24 May 2025)
- L-99-076, Forwards 1998 Annual Environ Rept,Radiological & 1998 Annual Environ Rept,Non-Radiological, to Appropriate NRC Parties,Iaw TS 6.9.1.10 + (00:50:19, 24 May 2025)
- IR 05000313/1988027 + (00:50:28, 24 May 2025)
- L-99-018, Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity + (00:50:37, 24 May 2025)
- L-99-074, Forwards Changes to BVPS ERDS Data Point Library,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394, Rev 1,Section 3.6, Administrative Implementation Requirements + (00:50:55, 24 May 2025)
- TAC:47170 + (00:51:10, 24 May 2025)
- ML20206G196 + (00:51:14, 24 May 2025)
- NUREG-1434, Discusses Licensee 960418 Request for Amend for Plant That Would Permit Addl Method of Fuel Movement & Loading in Core Upon Removal of Control Rods from Defueled Core Cells.Nei TSs Task Force Process Will Be Used to Review TSTF-226 + (00:51:15, 24 May 2025)
- DD-98-08, Notice of Issuance of Directors Decision (DD-98-08) Denying Petitioner 980925 & 981109 Requests That NRC Shutdown RBS & Perry NPP Unit 1 Until Facility Design & Licensing Bases Updated to Permit Operation with Failed FAs + (00:51:37, 24 May 2025)
- IR 05000277/1988026 + (00:51:42, 24 May 2025)
- IR 05000334/1987099 + (00:52:32, 24 May 2025)
- L-99-069, Forwards BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031, Per 10CFR50.59.Determination of Changes,Discussed + (00:52:40, 24 May 2025)
- 05000282/LER-1999-004, :on 990402,discovered That Sp That Demonstrates Inoperability of SFP Special Ventilation Sys Was Inadequate. Caused by Inadequate GL 96-01 Initial Review.Isolation Order Removed Control Fuses from Affected Fail Close Valves + (00:52:45, 24 May 2025)
- TAC:M93427 + (00:53:00, 24 May 2025)
- ML20206F909 + (00:53:17, 24 May 2025)
- ML20206F796 + (00:53:48, 24 May 2025)