Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19341C750 + (21:37:34, 24 December 2024)
- ML19341C748 + (21:37:35, 24 December 2024)
- ML19341C746 + (21:37:36, 24 December 2024)
- ML19341C747 + (21:37:36, 24 December 2024)
- ML19341C745 + (21:37:37, 24 December 2024)
- ML19341C744 + (21:37:38, 24 December 2024)
- ML19341C743 + (21:37:38, 24 December 2024)
- PNO-III-80-181, on 801004,unit Tripped from 85% Power.Caused by High Water Level Trip Due to 1B Main Feedwater Pump Malfunction.Bus 1B Would Not Switch Over to Offsite Power Supply Automatically.Reactor Restarted + (21:37:40, 24 December 2024)
- ML19341C741 + (21:37:41, 24 December 2024)
- IR 05000413/1980036 + (21:37:42, 24 December 2024)
- ML19341C739 + (21:37:43, 24 December 2024)
- ML19341C737 + (21:37:44, 24 December 2024)
- ML19341C735 + (21:37:45, 24 December 2024)
- IR 05000312/1980035 + (21:37:47, 24 December 2024)
- PNO-III-80-233, electrical Connector Problems Resulted in Plant Shutdown Over Two Days.Caused by Lack of Adequate Matl &/Or Test Data to Determine Acceptability of Connectors.Program Identified to Rework Connectors + (21:37:49, 24 December 2024)
- ML19341C732 + (21:37:50, 24 December 2024)
- ML19341C731 + (21:37:51, 24 December 2024)
- ML19341C730 + (21:37:52, 24 December 2024)
- PNO-III-81-010, on 810116,stop Work Order Re Installation of Core Support Assembly Vent Valves Issued to B&W After Discrepancies Noted.Included Failure to Maintain Adequate Inventory Control & to Identify Valve Parts + (21:37:54, 24 December 2024)
- ML19341C727 + (21:37:56, 24 December 2024)
- ML19341C726 + (21:37:57, 24 December 2024)
- ML19341C725 + (21:37:58, 24 December 2024)
- ML19341C723 + (21:37:58, 24 December 2024)
- ML19341C722 + (21:37:59, 24 December 2024)
- PNO-III-81-011, water Found in 12 Containment Electrical Penetrations in East Penetration Room.Source of Water Undetermined + (21:38:05, 24 December 2024)
- ML19341C719 + (21:38:06, 24 December 2024)
- ML19341C718 + (21:38:07, 24 December 2024)
- ML19341C717 + (21:38:08, 24 December 2024)
- ML19341C716 + (21:38:09, 24 December 2024)
- ML19341C714 + (21:38:10, 24 December 2024)
- ML19341C713 + (21:38:11, 24 December 2024)
- ML19341C712 + (21:38:12, 24 December 2024)
- ML19341C711 + (21:38:13, 24 December 2024)
- ML19341C709 + (21:38:14, 24 December 2024)
- ML19341C707 + (21:38:15, 24 December 2024)
- IR 05000267/1980023 + (21:38:16, 24 December 2024)
- ML19341C704 + (21:38:18, 24 December 2024)
- ML19341C703 + (21:38:18, 24 December 2024)
- ML19341C701 + (21:38:20, 24 December 2024)
- ML19341C702 + (21:38:20, 24 December 2024)
- PNO-III-80-208A, on 801107,Unit 2 Commenced Cooldown to Cold Shutdown Resulting in Plant Shutdown Over Two Days.Caused by Maint on Pressurizer Spray Lines Due to 801106 Trip.Outage to Last at Least Three Days + (21:38:22, 24 December 2024)
- ML19341C699 + (21:38:23, 24 December 2024)
- ML19341C698 + (21:38:24, 24 December 2024)
- ML19341C697 + (21:38:25, 24 December 2024)
- ML19341C695 + (21:38:26, 24 December 2024)
- ML19341C694 + (21:38:27, 24 December 2024)
- ML19341C693 + (21:38:31, 24 December 2024)
- ML19341C692 + (21:38:32, 24 December 2024)
- PNO-III-80-208, on 801106,main Generator Output Breakers Tripped,Resulting in Plant Shutdown Over Two Days.Cause Not Determined.Unit Will Be Maintained in Hot Standby Until 801110,pending Determination of Cause + (21:38:34, 24 December 2024)
- PNO-III-80-231, on 801207,3 Ci Technetium Generator Reported Missing.Generator Properly Packaged & Labeled.As of 801215, Generator Would Contain 240 Mci Activity.No Hazard Exists Unless Generator Disassembled + (21:38:36, 24 December 2024)
- PNO-III-80-235, on 801227,unit Shutdown Initiated Resulting in Outage of Greater than Two Days.Caused by Maint on Main Condenser Tube Leaks.Repairs to Be Completed & Unit Returned to Svc by 801231 + (21:38:38, 24 December 2024)