ML19341C698
From kanterella
Jump to navigation
Jump to search
ML19341C698 | |
Person / Time | |
---|---|
Site: | Summer, South Texas, San Onofre, 05000449, 05000467, 05000448, Allens Creek ![]() |
Issue date: | 12/31/1980 |
From: | Zittel H OAK RIDGE NATIONAL LABORATORY |
To: | Regan W Office of Nuclear Reactor Regulation |
References | |
CON-FIN-B-0760-1, CON-FIN-B-760-1 ORNL-ED-EIS-144, NUDOCS 8103031067 | |
Download: ML19341C698 (4) | |
Category:CONTRACTED REPORT - RTA
MONTHYEARML20212L3541998-11-30030 November 1998
[Table view]Final Rept, Technical Evaluation Rept on Submittal-Only Review of IPEEE at San Onofre Nuclear Generating Station, Units 2 & 3 ML20199G8401997-11-0606 November 1997 Rev 0 to Ltr Rept, Supplemental Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20140G5721997-04-24024 April 1997 Rev 0 to, Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20140H5791996-12-10010 December 1996 Technical Evaluation Rept of IPE Submittal & RAI Responses for VC Summer Nuclear Station ML20117E2201996-06-28028 June 1996 Rev 0 to, Review of South Texas Project Fire Barrier Ampacity Assessments, Ltr Rept L-95-050, Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-3621995-11-0101 November 1995 Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-362 ML20094A4841995-08-31031 August 1995 Technical Evaluation Rept,Rev 6 for Plant Odcm ML20080J1841995-02-28028 February 1995 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:South Texas-1/2 ML20080J7181995-02-28028 February 1995 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:San Onofre-2/3,' Technical Evaluation Rept ML20072Q0251994-05-31031 May 1994 Technical Evaluation Rept Pump & Valve IST Program for Plant ML20059F4291993-12-31031 December 1993 Auxiliary Feedwater System RISK-BASED Inspection Guide for the South Texas Project Nuclear Power Plant ML20080G3131993-03-31031 March 1993 Draft Review of Operating Experience for South Texas 1 & 2, 1991-1992.Related Info Encl ML20128N4451993-02-28028 February 1993 Auxiliary Feedwater System RISK-BASED Inspection Guide for the San Onofre Unit 2 Nuclear Power Plant ML20116A4841992-09-30030 September 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Virgil C. Summer Nuclear Power Plant ML20094D2481991-12-13013 December 1991 Final, Technical Evaluation Rept,San Onofre Nuclear Generating Station,Units 2 & 3,Station Blackout Evaluation ML20113H1051991-11-30030 November 1991 Auxiliary Feedwater System Risk-Based Insp Guide for Virgil Summer Nuclear Power Plant ML20091K1001991-11-19019 November 1991 Final Technical Evaluation Rept Virgil C Summer Station Blackout Evaluation ML20082M5771991-08-31031 August 1991 a Review of the South Texas Project Probabilistic Safety Analysis for Accident Frequency Estimates and Containment Binning ML20082P8291991-06-30030 June 1991 Rev 2 to Pump & Valve Inservice Testing Program,Vc Summer Nuclear Station, Technical Evaluation Rept ML20084T3341991-01-31031 January 1991 Final Technical Evaluation Rept - South Texas Project Electrical Generating Station Station Blackout Evaluation ML20100P5411990-10-31031 October 1990 Draft, Auxiliary Feedwater Sys Risk Based Insp Guide for San Onofre Unit 2 Nuclear Power Plant ML20079A6151990-09-30030 September 1990 Technical Evaluation Rept Pump & Valve Inservice Testing Program San Onofre Generating Station,Units 2 & 3 ML20059N7941990-06-30030 June 1990 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan,South Texas Project Electric Generating Station Unit 2 ML20012A9911989-11-30030 November 1989 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Houston Lighting & Power Co,South Texas Project Electric Generating Station,Unit 1. ML19332B6171989-11-30030 November 1989 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: South Texas-1/2. ML19324A6181988-10-31031 October 1988 Technical Evaluation Rept for Evaluation of ODCM (Updated Through Rev 19) San Onofre Nuclear Station Units 2 & 3. ML20151K7891988-04-30030 April 1988 Conformance to Reg Guide 1.97:Summer, Technical Evaluation Rept ML20195J1521987-12-31031 December 1987 Rev 1 to Pump & Valve Inservice Testing Program, VC Summer Nuclear Station, Technical Evaluation Rept ML20235M3801987-06-30030 June 1987 Audit of Environ Qualification of Safety-Related Electrical Equipment for South Texas Project Unit 1, Final Informal Rept ML20235L9151987-06-30030 June 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Summer, Informal Rept ML20235M0021987-06-30030 June 1987 Resolution of Confirmatory Item Non-Class 1E Signal to Class 1E Circuit Interface:South Texas Project 1 & 2, Technical Evaluation Rept ML20235L8861987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - San Onofre Nuclear Generating Station Unit 1, Informal Rept ML20215M3061987-05-31031 May 1987 Evaluation of South Texas Project Unit 1 Tech Specs, Informal Technical Evaluation Rept ML20215M1091987-05-31031 May 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,South Texas Units 1 & 2, Technical Evaluation Rept ML20235M5221987-05-31031 May 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Southern California Edison Co,San Onofre Nuclear Generating Station Units 2 & 3, Informal Rept ML20245B5391987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Summer, Informal Rept ML20235M0401987-03-31031 March 1987 1 Sqrt Rept, Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20214S0391987-03-31031 March 1987 Analysis of Pressurizer Safety Valve Discharge Piping of VC Summer Nuclear Power Station,Unit 1, Informal Rept ML20245A4321987-03-10010 March 1987 Post-Implementation Audit Rept for South Carolina Electric & Gas Co Virgil C Summer Nuclear Station Spds ML20214R3791987-02-28028 February 1987 Review of South Texas Project Quality Data Processing Sys Reliability Study, Draft Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20207N2461986-12-16016 December 1986 Technical Assistance to Nrc,Region Iv,For Preservice Insp, Monthly Ltr Rept for Nov 1986 ML20211K5101986-11-30030 November 1986 Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 ML20215M8911986-10-20020 October 1986 Technical Assistance for Preservice Insp, Monthly Ltr Rept for Aug & Sept 1986 ML20215B6481986-09-29029 September 1986 In-Progress Audit of Dcrdr for San Onofre Nuclear Generating Station Unit 1 ML20215D7391986-09-29029 September 1986 Addendum to Pre-Implementation Audit of Dcrdr for San Onofre Nuclear Generating Station,Units 2 & 3, Technical Evaluation Rept ML20206Q4521986-07-31031 July 1986 Conformance to Reg Guide 1.97,San Onofre Nuclear Generating Station,Unit 1 ML20204G1921986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe ML20207F1591986-07-0808 July 1986 Energy Technology Engineering Ctr Technical Assistance to NRC for Preservice Insp, Monthly Ltr Rept for June 1986 1998-11-30 Category:QUICK LOOK MONTHYEARML20212L3541998-11-30030 November 1998
[Table view]Final Rept, Technical Evaluation Rept on Submittal-Only Review of IPEEE at San Onofre Nuclear Generating Station, Units 2 & 3 ML20199G8401997-11-0606 November 1997 Rev 0 to Ltr Rept, Supplemental Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20140G5721997-04-24024 April 1997 Rev 0 to, Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20140H5791996-12-10010 December 1996 Technical Evaluation Rept of IPE Submittal & RAI Responses for VC Summer Nuclear Station ML20117E2201996-06-28028 June 1996 Rev 0 to, Review of South Texas Project Fire Barrier Ampacity Assessments, Ltr Rept L-95-050, Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-3621995-11-0101 November 1995 Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-362 ML20094A4841995-08-31031 August 1995 Technical Evaluation Rept,Rev 6 for Plant Odcm ML20080J1841995-02-28028 February 1995 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:South Texas-1/2 ML20080J7181995-02-28028 February 1995 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:San Onofre-2/3,' Technical Evaluation Rept ML20072Q0251994-05-31031 May 1994 Technical Evaluation Rept Pump & Valve IST Program for Plant ML20059F4291993-12-31031 December 1993 Auxiliary Feedwater System RISK-BASED Inspection Guide for the South Texas Project Nuclear Power Plant ML20080G3131993-03-31031 March 1993 Draft Review of Operating Experience for South Texas 1 & 2, 1991-1992.Related Info Encl ML20128N4451993-02-28028 February 1993 Auxiliary Feedwater System RISK-BASED Inspection Guide for the San Onofre Unit 2 Nuclear Power Plant ML20116A4841992-09-30030 September 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Virgil C. Summer Nuclear Power Plant ML20094D2481991-12-13013 December 1991 Final, Technical Evaluation Rept,San Onofre Nuclear Generating Station,Units 2 & 3,Station Blackout Evaluation ML20113H1051991-11-30030 November 1991 Auxiliary Feedwater System Risk-Based Insp Guide for Virgil Summer Nuclear Power Plant ML20091K1001991-11-19019 November 1991 Final Technical Evaluation Rept Virgil C Summer Station Blackout Evaluation ML20082M5771991-08-31031 August 1991 a Review of the South Texas Project Probabilistic Safety Analysis for Accident Frequency Estimates and Containment Binning ML20082P8291991-06-30030 June 1991 Rev 2 to Pump & Valve Inservice Testing Program,Vc Summer Nuclear Station, Technical Evaluation Rept ML20084T3341991-01-31031 January 1991 Final Technical Evaluation Rept - South Texas Project Electrical Generating Station Station Blackout Evaluation ML20100P5411990-10-31031 October 1990 Draft, Auxiliary Feedwater Sys Risk Based Insp Guide for San Onofre Unit 2 Nuclear Power Plant ML20079A6151990-09-30030 September 1990 Technical Evaluation Rept Pump & Valve Inservice Testing Program San Onofre Generating Station,Units 2 & 3 ML20059N7941990-06-30030 June 1990 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan,South Texas Project Electric Generating Station Unit 2 ML20012A9911989-11-30030 November 1989 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Houston Lighting & Power Co,South Texas Project Electric Generating Station,Unit 1. ML19332B6171989-11-30030 November 1989 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: South Texas-1/2. ML19324A6181988-10-31031 October 1988 Technical Evaluation Rept for Evaluation of ODCM (Updated Through Rev 19) San Onofre Nuclear Station Units 2 & 3. ML20151K7891988-04-30030 April 1988 Conformance to Reg Guide 1.97:Summer, Technical Evaluation Rept ML20195J1521987-12-31031 December 1987 Rev 1 to Pump & Valve Inservice Testing Program, VC Summer Nuclear Station, Technical Evaluation Rept ML20235M3801987-06-30030 June 1987 Audit of Environ Qualification of Safety-Related Electrical Equipment for South Texas Project Unit 1, Final Informal Rept ML20235L9151987-06-30030 June 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Summer, Informal Rept ML20235M0021987-06-30030 June 1987 Resolution of Confirmatory Item Non-Class 1E Signal to Class 1E Circuit Interface:South Texas Project 1 & 2, Technical Evaluation Rept ML20235L8861987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - San Onofre Nuclear Generating Station Unit 1, Informal Rept ML20215M3061987-05-31031 May 1987 Evaluation of South Texas Project Unit 1 Tech Specs, Informal Technical Evaluation Rept ML20215M1091987-05-31031 May 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,South Texas Units 1 & 2, Technical Evaluation Rept ML20235M5221987-05-31031 May 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Southern California Edison Co,San Onofre Nuclear Generating Station Units 2 & 3, Informal Rept ML20245B5391987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Summer, Informal Rept ML20235M0401987-03-31031 March 1987 1 Sqrt Rept, Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20214S0391987-03-31031 March 1987 Analysis of Pressurizer Safety Valve Discharge Piping of VC Summer Nuclear Power Station,Unit 1, Informal Rept ML20245A4321987-03-10010 March 1987 Post-Implementation Audit Rept for South Carolina Electric & Gas Co Virgil C Summer Nuclear Station Spds ML20214R3791987-02-28028 February 1987 Review of South Texas Project Quality Data Processing Sys Reliability Study, Draft Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20207N2461986-12-16016 December 1986 Technical Assistance to Nrc,Region Iv,For Preservice Insp, Monthly Ltr Rept for Nov 1986 ML20211K5101986-11-30030 November 1986 Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 ML20215M8911986-10-20020 October 1986 Technical Assistance for Preservice Insp, Monthly Ltr Rept for Aug & Sept 1986 ML20215B6481986-09-29029 September 1986 In-Progress Audit of Dcrdr for San Onofre Nuclear Generating Station Unit 1 ML20215D7391986-09-29029 September 1986 Addendum to Pre-Implementation Audit of Dcrdr for San Onofre Nuclear Generating Station,Units 2 & 3, Technical Evaluation Rept ML20206Q4521986-07-31031 July 1986 Conformance to Reg Guide 1.97,San Onofre Nuclear Generating Station,Unit 1 ML20204G1921986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe ML20207F1591986-07-0808 July 1986 Energy Technology Engineering Ctr Technical Assistance to NRC for Preservice Insp, Monthly Ltr Rept for June 1986 1998-11-30 Category:ETC. (PERIODIC MONTHYEARML20212L3541998-11-30030 November 1998
[Table view]Final Rept, Technical Evaluation Rept on Submittal-Only Review of IPEEE at San Onofre Nuclear Generating Station, Units 2 & 3 ML20199G8401997-11-0606 November 1997 Rev 0 to Ltr Rept, Supplemental Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20140G5721997-04-24024 April 1997 Rev 0 to, Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20140H5791996-12-10010 December 1996 Technical Evaluation Rept of IPE Submittal & RAI Responses for VC Summer Nuclear Station ML20117E2201996-06-28028 June 1996 Rev 0 to, Review of South Texas Project Fire Barrier Ampacity Assessments, Ltr Rept L-95-050, Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-3621995-11-0101 November 1995 Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-362 ML20094A4841995-08-31031 August 1995 Technical Evaluation Rept,Rev 6 for Plant Odcm ML20080J1841995-02-28028 February 1995 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:South Texas-1/2 ML20080J7181995-02-28028 February 1995 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:San Onofre-2/3,' Technical Evaluation Rept ML20072Q0251994-05-31031 May 1994 Technical Evaluation Rept Pump & Valve IST Program for Plant ML20059F4291993-12-31031 December 1993 Auxiliary Feedwater System RISK-BASED Inspection Guide for the South Texas Project Nuclear Power Plant ML20080G3131993-03-31031 March 1993 Draft Review of Operating Experience for South Texas 1 & 2, 1991-1992.Related Info Encl ML20128N4451993-02-28028 February 1993 Auxiliary Feedwater System RISK-BASED Inspection Guide for the San Onofre Unit 2 Nuclear Power Plant ML20116A4841992-09-30030 September 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Virgil C. Summer Nuclear Power Plant ML20094D2481991-12-13013 December 1991 Final, Technical Evaluation Rept,San Onofre Nuclear Generating Station,Units 2 & 3,Station Blackout Evaluation ML20113H1051991-11-30030 November 1991 Auxiliary Feedwater System Risk-Based Insp Guide for Virgil Summer Nuclear Power Plant ML20091K1001991-11-19019 November 1991 Final Technical Evaluation Rept Virgil C Summer Station Blackout Evaluation ML20082M5771991-08-31031 August 1991 a Review of the South Texas Project Probabilistic Safety Analysis for Accident Frequency Estimates and Containment Binning ML20082P8291991-06-30030 June 1991 Rev 2 to Pump & Valve Inservice Testing Program,Vc Summer Nuclear Station, Technical Evaluation Rept ML20084T3341991-01-31031 January 1991 Final Technical Evaluation Rept - South Texas Project Electrical Generating Station Station Blackout Evaluation ML20100P5411990-10-31031 October 1990 Draft, Auxiliary Feedwater Sys Risk Based Insp Guide for San Onofre Unit 2 Nuclear Power Plant ML20079A6151990-09-30030 September 1990 Technical Evaluation Rept Pump & Valve Inservice Testing Program San Onofre Generating Station,Units 2 & 3 ML20059N7941990-06-30030 June 1990 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan,South Texas Project Electric Generating Station Unit 2 ML20012A9911989-11-30030 November 1989 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Houston Lighting & Power Co,South Texas Project Electric Generating Station,Unit 1. ML19332B6171989-11-30030 November 1989 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: South Texas-1/2. ML19324A6181988-10-31031 October 1988 Technical Evaluation Rept for Evaluation of ODCM (Updated Through Rev 19) San Onofre Nuclear Station Units 2 & 3. ML20151K7891988-04-30030 April 1988 Conformance to Reg Guide 1.97:Summer, Technical Evaluation Rept ML20195J1521987-12-31031 December 1987 Rev 1 to Pump & Valve Inservice Testing Program, VC Summer Nuclear Station, Technical Evaluation Rept ML20235M3801987-06-30030 June 1987 Audit of Environ Qualification of Safety-Related Electrical Equipment for South Texas Project Unit 1, Final Informal Rept ML20235L9151987-06-30030 June 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Summer, Informal Rept ML20235M0021987-06-30030 June 1987 Resolution of Confirmatory Item Non-Class 1E Signal to Class 1E Circuit Interface:South Texas Project 1 & 2, Technical Evaluation Rept ML20235L8861987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - San Onofre Nuclear Generating Station Unit 1, Informal Rept ML20215M3061987-05-31031 May 1987 Evaluation of South Texas Project Unit 1 Tech Specs, Informal Technical Evaluation Rept ML20215M1091987-05-31031 May 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,South Texas Units 1 & 2, Technical Evaluation Rept ML20235M5221987-05-31031 May 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Southern California Edison Co,San Onofre Nuclear Generating Station Units 2 & 3, Informal Rept ML20245B5391987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Summer, Informal Rept ML20235M0401987-03-31031 March 1987 1 Sqrt Rept, Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20214S0391987-03-31031 March 1987 Analysis of Pressurizer Safety Valve Discharge Piping of VC Summer Nuclear Power Station,Unit 1, Informal Rept ML20245A4321987-03-10010 March 1987 Post-Implementation Audit Rept for South Carolina Electric & Gas Co Virgil C Summer Nuclear Station Spds ML20214R3791987-02-28028 February 1987 Review of South Texas Project Quality Data Processing Sys Reliability Study, Draft Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20207N2461986-12-16016 December 1986 Technical Assistance to Nrc,Region Iv,For Preservice Insp, Monthly Ltr Rept for Nov 1986 ML20211K5101986-11-30030 November 1986 Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 ML20215M8911986-10-20020 October 1986 Technical Assistance for Preservice Insp, Monthly Ltr Rept for Aug & Sept 1986 ML20215B6481986-09-29029 September 1986 In-Progress Audit of Dcrdr for San Onofre Nuclear Generating Station Unit 1 ML20215D7391986-09-29029 September 1986 Addendum to Pre-Implementation Audit of Dcrdr for San Onofre Nuclear Generating Station,Units 2 & 3, Technical Evaluation Rept ML20206Q4521986-07-31031 July 1986 Conformance to Reg Guide 1.97,San Onofre Nuclear Generating Station,Unit 1 ML20204G1921986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe ML20207F1591986-07-0808 July 1986 Energy Technology Engineering Ctr Technical Assistance to NRC for Preservice Insp, Monthly Ltr Rept for June 1986 1998-11-30 Category:RESEARCH AND TECHNICAL ASSISTANCE REPORTS MONTHYEARML20024B9571983-07-31031 July 1983
[Table view]Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant. ML20028B4921982-10-31031 October 1982 Ser,Inservice Testing Program,Vc Summer Nuclear Station, Interim Rept ML20054M8661982-05-31031 May 1982 Technical Evaluation Rept of Overpressure Protection Sys for San Onofre Nuclear Generating Station,Unit 1, Informal Rept ML20039A7271981-10-31031 October 1981 Small & Large Break Calculations for San Onofre Unit 2, Technical Rept ML20005B1721981-05-31031 May 1981 Environ Statements Project, Monthly Progress Rept for May 1981 ML19347E9251981-03-31031 March 1981 Environ Statements Project, Progress Rept for Mar 1981 ML20003F9571981-02-28028 February 1981 Environ Statements Project, Monthly Progress Rept for Feb 1981 ML19341C6981980-12-31031 December 1980 Environ Statements Project, Monthly Progress Rept for Dec 1980 ML19294B2881979-12-31031 December 1979 Environ Statements Project, Monthly Progress Rept for Dec 1979 1983-07-31 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML20212L3541998-11-30030 November 1998
[Table view]Final Rept, Technical Evaluation Rept on Submittal-Only Review of IPEEE at San Onofre Nuclear Generating Station, Units 2 & 3 ML20199G8401997-11-0606 November 1997 Rev 0 to Ltr Rept, Supplemental Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20140G5721997-04-24024 April 1997 Rev 0 to, Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20140H5791996-12-10010 December 1996 Technical Evaluation Rept of IPE Submittal & RAI Responses for VC Summer Nuclear Station ML20117E2201996-06-28028 June 1996 Rev 0 to, Review of South Texas Project Fire Barrier Ampacity Assessments, Ltr Rept L-95-050, Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-3621995-11-0101 November 1995 Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-362 ML20094A4841995-08-31031 August 1995 Technical Evaluation Rept,Rev 6 for Plant Odcm ML20080J1841995-02-28028 February 1995 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:South Texas-1/2 ML20080J7181995-02-28028 February 1995 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:San Onofre-2/3,' Technical Evaluation Rept ML20072Q0251994-05-31031 May 1994 Technical Evaluation Rept Pump & Valve IST Program for Plant ML20059F4291993-12-31031 December 1993 Auxiliary Feedwater System RISK-BASED Inspection Guide for the South Texas Project Nuclear Power Plant ML20080G3131993-03-31031 March 1993 Draft Review of Operating Experience for South Texas 1 & 2, 1991-1992.Related Info Encl ML20128N4451993-02-28028 February 1993 Auxiliary Feedwater System RISK-BASED Inspection Guide for the San Onofre Unit 2 Nuclear Power Plant ML20116A4841992-09-30030 September 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Virgil C. Summer Nuclear Power Plant ML20094D2481991-12-13013 December 1991 Final, Technical Evaluation Rept,San Onofre Nuclear Generating Station,Units 2 & 3,Station Blackout Evaluation ML20113H1051991-11-30030 November 1991 Auxiliary Feedwater System Risk-Based Insp Guide for Virgil Summer Nuclear Power Plant ML20091K1001991-11-19019 November 1991 Final Technical Evaluation Rept Virgil C Summer Station Blackout Evaluation ML20082M5771991-08-31031 August 1991 a Review of the South Texas Project Probabilistic Safety Analysis for Accident Frequency Estimates and Containment Binning ML20082P8291991-06-30030 June 1991 Rev 2 to Pump & Valve Inservice Testing Program,Vc Summer Nuclear Station, Technical Evaluation Rept ML20084T3341991-01-31031 January 1991 Final Technical Evaluation Rept - South Texas Project Electrical Generating Station Station Blackout Evaluation ML20100P5411990-10-31031 October 1990 Draft, Auxiliary Feedwater Sys Risk Based Insp Guide for San Onofre Unit 2 Nuclear Power Plant ML20079A6151990-09-30030 September 1990 Technical Evaluation Rept Pump & Valve Inservice Testing Program San Onofre Generating Station,Units 2 & 3 ML20056A8481990-07-24024 July 1990 Notification of Contract Execution,Task Order 12,to Technical Assistance in Support of NRC Licensing Activities. Contractor:Viking Sys Intl ML20059N7941990-06-30030 June 1990 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan,South Texas Project Electric Generating Station Unit 2 ML20012A9911989-11-30030 November 1989 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Houston Lighting & Power Co,South Texas Project Electric Generating Station,Unit 1. ML19332B6171989-11-30030 November 1989 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: South Texas-1/2. ML19324A6181988-10-31031 October 1988 Technical Evaluation Rept for Evaluation of ODCM (Updated Through Rev 19) San Onofre Nuclear Station Units 2 & 3. ML20151K7891988-04-30030 April 1988 Conformance to Reg Guide 1.97:Summer, Technical Evaluation Rept ML20195J1521987-12-31031 December 1987 Rev 1 to Pump & Valve Inservice Testing Program, VC Summer Nuclear Station, Technical Evaluation Rept ML20235M0021987-06-30030 June 1987 Resolution of Confirmatory Item Non-Class 1E Signal to Class 1E Circuit Interface:South Texas Project 1 & 2, Technical Evaluation Rept ML20235M3801987-06-30030 June 1987 Audit of Environ Qualification of Safety-Related Electrical Equipment for South Texas Project Unit 1, Final Informal Rept ML20235L9151987-06-30030 June 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Summer, Informal Rept ML20235L8861987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - San Onofre Nuclear Generating Station Unit 1, Informal Rept ML20215M1091987-05-31031 May 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,South Texas Units 1 & 2, Technical Evaluation Rept ML20215M3061987-05-31031 May 1987 Evaluation of South Texas Project Unit 1 Tech Specs, Informal Technical Evaluation Rept ML20245B5391987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Summer, Informal Rept ML20235M5221987-05-31031 May 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Southern California Edison Co,San Onofre Nuclear Generating Station Units 2 & 3, Informal Rept ML20214S0391987-03-31031 March 1987 Analysis of Pressurizer Safety Valve Discharge Piping of VC Summer Nuclear Power Station,Unit 1, Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20235M0401987-03-31031 March 1987 1 Sqrt Rept, Informal Rept ML20245A4321987-03-10010 March 1987 Post-Implementation Audit Rept for South Carolina Electric & Gas Co Virgil C Summer Nuclear Station Spds ML20214R3791987-02-28028 February 1987 Review of South Texas Project Quality Data Processing Sys Reliability Study, Draft Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20207N2461986-12-16016 December 1986 Technical Assistance to Nrc,Region Iv,For Preservice Insp, Monthly Ltr Rept for Nov 1986 ML20211K5101986-11-30030 November 1986 Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 ML20215M8911986-10-20020 October 1986 Technical Assistance for Preservice Insp, Monthly Ltr Rept for Aug & Sept 1986 ML20215B6481986-09-29029 September 1986 In-Progress Audit of Dcrdr for San Onofre Nuclear Generating Station Unit 1 ML20215D7391986-09-29029 September 1986 Addendum to Pre-Implementation Audit of Dcrdr for San Onofre Nuclear Generating Station,Units 2 & 3, Technical Evaluation Rept ML20206Q4521986-07-31031 July 1986 Conformance to Reg Guide 1.97,San Onofre Nuclear Generating Station,Unit 1 ML20204G1921986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe 1998-11-30 |
Text
.
/
INTERIM REPORT Accession No.
ORNL/ED/EIS-144 W c)N Environmental Statements Project Project
Title:
4
)
Subject of this Document: Monthly Progress Report 9 N[$ J-i -
f FEB 101981
- l-Type of Document: Monthly Progress Report um gggu"
. A
.ernal Distribution
- 1. F. R. Mynatt C. W. Fulkerson
- 3. R. 8. Craig
- 4. Laboratory Records (RC) 5-6. H. E. Zittel External Distribution
- 7. Office of Assistant Manager for Energy Research and Development, Department of Energy, Oak Ridge Operationg Office, Oak Ridge, TN 37830 8-9. Division of Technical Information and Document Control, U.S.
Nuclear Regulatory Commii.sion, Washington, D. C. 20555 10-11. Technical Information Center, U.S. Department of Energy, P. O. Box 62, Oak Ridge, TN 37830
- 12. D. Muller, Assistant Director for Environmental Technology, Division of of Engineering, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555
- 13. Director, Division of Engineering, Attention C. Poslusny, Chief, Siting Analysis Branch, U. S. Nuclear Regulatory Commission, Washington, D.C. 20555
- 14. B. L. Grenier, NRR, U. S. Nuclear Regulatory Commission, Washington, D.C. 20555 15-20. William H. Regan, U.S. Nuclear Regulatory Commission, Washington, D. C. 20555