Forwards IE Insp Rept 50-302/80-40 on 801202-05.No Noncompliance Noted
ML19341C750
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/09/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19341C749 List:
References
NUDOCS 8103040111
Download: ML19341C750 (2)


See also: IR 05000302/1980040

Text

94

.

b

gfLIt!

,

v

UNITED STATES

[

'o,j

.

NUCLEAR REGULATORY COMMISSION

. ,,

g

r

REGION 11

e

101 MARIETTA ST., N.W., SulTE 3100

ATLANTA. GEORGIA 30303

o

FEB - 91981

Florida Power Corporation

ATTN:

J. A. Hancock, Assistant

Vice President

Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

SUBJECT:

Report No. 50-302/80-40

This refers to the special safety inspection conducted by W. H. Miller, Jr. , of

this office on December 2-5,

19h0, of activities authorized by NRC Operating

License No. DPR-72 for the Crystal River facility, and to the discussion of our

findings held with D. C. Poole at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

As discussed during the exit interview of December 5,

1980 it is our under-

standing that you will provided a reply by February 15, 1981 as to the proposed

evaluation and implementation schedule for the following outstanding items:

unprotected fire barrier penetrations in the intermediate building; single

failure criteria for auxiliary building fire suppression systems; inspection of

fire damper installations; and provision of latching hardware for fire doors.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection -

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

l

l

l

l

t

1

810304011

!

l

[

. -

.

..

Florida Power Corporation

-2-

FEB - 91981

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/

Charles E. Murphp, Chief

Reactor Construction & Engineering

Support Branch

Enclosure:

Inspection Report No.

50-302/8

,

cc w/ encl:

D. C. Pooie, Nuclear Plant Manager

l

l