Text
94
.
b
gfLIt!
,
v
UNITED STATES
[
'o,j
.
NUCLEAR REGULATORY COMMISSION
. ,,
g
r
REGION 11
e
101 MARIETTA ST., N.W., SulTE 3100
ATLANTA. GEORGIA 30303
o
FEB - 91981
Florida Power Corporation
ATTN:
J. A. Hancock, Assistant
Vice President
Nuclear Operations
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
Gentlemen:
SUBJECT:
Report No. 50-302/80-40
This refers to the special safety inspection conducted by W. H. Miller, Jr. , of
this office on December 2-5,
19h0, of activities authorized by NRC Operating
License No. DPR-72 for the Crystal River facility, and to the discussion of our
findings held with D. C. Poole at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
As discussed during the exit interview of December 5,
1980 it is our under-
standing that you will provided a reply by February 15, 1981 as to the proposed
evaluation and implementation schedule for the following outstanding items:
unprotected fire barrier penetrations in the intermediate building; single
failure criteria for auxiliary building fire suppression systems; inspection of
fire damper installations; and provision of latching hardware for fire doors.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection -
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
l
l
l
l
t
1
810304011
!
l
[
. -
.
..
Florida Power Corporation
-2-
FEB - 91981
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/
Charles E. Murphp, Chief
Reactor Construction & Engineering
Support Branch
Enclosure:
Inspection Report No.
50-302/8
,
cc w/ encl:
D. C. Pooie, Nuclear Plant Manager
l
l