ML19341C739
| ML19341C739 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 01/21/1981 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19341C736 | List: |
| References | |
| NUDOCS 8103040050 | |
| Download: ML19341C739 (2) | |
See also: IR 05000413/1980036
Text
.
-
.
Y
pn r.t;g#o%
8
.
UNITED STATES
,
8'
NUCLEAR REGULATORY COMMISSION
U
E
REGION il
I
101 MARIETTA ST., N.W.. SulTE 3100
4]
g . . . . . ,o/
b
ATLANTA. GEORGIA 30303
J AN 211981
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
SUBJECT: Report Nos. 50-413/80-36 and 50-414/80-36
This refers to the routine inspection conducted by P. K. VanDoorn of this office
on December 2-5, 1980, of activities authorized by NRC Construction Permit Nos.
CPPR-116 and CPPR-117 for the Catawba facility, and to the discussion of our
findings held with D. G. Beam at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinatiens of procedures and representative records, interviews with
personnel, and obse rvations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
~
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietars, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
d'
s
,
Charles E. M
hy,
'ef
<
Reactor Construction & Engineering
Support Branch
Enclosure:
(See Page 2)
8103040050
--
-
.
.
. l
s-
%
.
\\
Duke Power Company
-2-
'
Enclosure:
Inspection Report Nos.
50-413/80-36 and 50-414/80-36
cc w/ enc 1:
J. W. Hampton, Station Manager
D. G. Beam, Project Manager
.