Forwards IE Insp Repts 50-413/80-23 & 50-414/80-23 on 800825-29 & Notice of Violation
ML19341C745
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/26/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19341C738 List:
References
NUDOCS 8103040097
Download: ML19341C745 (2)


See also: IR 05000413/1980023

Text

.

.

p urg

'

1

8"

o$

,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

- Oe

~s

riEoio~ ii

o,

[

101 MARIETTA ST.. N.W.. SUITE 3100

% ""' /

ATLANTA. GEORGIA 30303

SEP 2 61980

In Reply Refer To:

RII:DKW

50-413/80-23

50-414/80-23

Duke Power Company

A1TN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

.

This refers to the inspection conducted by D. K. Walters of this office on

August 25-29, 1980, of activities authorized by NRC Construction "ermit Nos.

CPPR-116 and CPPR-117 for the Catawba facility held with D. G. beam at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

,

'

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

G 03040oqn

.

.-

.

.

.

,

-

--

_

l

.

>

'

SEP 2 61980

6

' Duke-Power Company

-2-

>

t

1

l

Should you have any questions concerning this letter, we will be glad to discuss

!

them with you.

Sincerely,

1

i

s)

<

"

C. E. Murph , hief

Reactor Construction and Engineering

Support Branch

.

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-413/80-23

!

and 50-414/80-23

i

!

cc w/ enc 1:

i

J. W. Hampton, Station Manager

D. G. Beam, Project Manager

5

-

1-

,

4

i

3

.

i

l

.!o

l

4

1

.

1

i

[

I

..

-

__..,._;._._7___.

_ . _ . , . _ _

_

.-

_- _

.

7

, ,