Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19347F847 + (09:52:09, 24 December 2024)
- IR 05000010/1981005 + (09:52:11, 24 December 2024)
- ML19347F844 + (09:52:12, 24 December 2024)
- IR 05000373/1981008 + (09:52:14, 24 December 2024)
- IR 05000373/1981001 + (09:52:16, 24 December 2024)
- 05000339/LER-1981-021-03, Boron Injection Tank Was Found to Contain Boron Concentration Below Tech Spec Limit. Caused by Leak Past Check Valve 2-CH-155,located in Boric Acid Supply Line.Check Valve Will Be Replaced + (09:52:18, 24 December 2024)
- ML19347F839 + (09:52:22, 24 December 2024)
- 05000339/LER-1981-021, Forwards Updated LER 81-021/03X-1 + (09:52:25, 24 December 2024)
- ML19347F836 + (09:52:31, 24 December 2024)
- ML19347F834 + (09:52:32, 24 December 2024)
- ML19347F832 + (09:52:39, 24 December 2024)
- ML19347F831 + (09:52:45, 24 December 2024)
- ML19347F830 + (09:52:46, 24 December 2024)
- ML19347F829 + (09:52:47, 24 December 2024)
- ML19347F827 + (09:52:48, 24 December 2024)
- ML19347F826 + (09:52:49, 24 December 2024)
- ML19347F824 + (09:52:50, 24 December 2024)
- ML19347F825 + (09:52:50, 24 December 2024)
- 05000325/LER-1981-032-03, /03L-0:on 810419,heat Exchanger,Model Ceu,Size 52-8-144,baffle Plate Was Discovered to Be Bowed.Caused by Excessive Differential Pressure Across Baffle Plate from Accumulation of Shells in Heat Exchanger.Plate Reinstalled + (09:52:52, 24 December 2024)
- ML19347F822 + (09:52:56, 24 December 2024)
- ML19347F820 + (09:52:58, 24 December 2024)
- ML19347F821 + (09:52:58, 24 December 2024)
- 05000325/LER-1981-032, Forwards LER 81-032/03L-0 + (09:53:00, 24 December 2024)
- ML19347F817 + (09:53:01, 24 December 2024)
- ML19347F816 + (09:53:02, 24 December 2024)
- ML19347F815 + (09:53:04, 24 December 2024)
- BSEP-81-0999, Forwards Monthly Operating Repts for Apr 1981 + (09:53:05, 24 December 2024)
- ML19347F814 + (09:53:05, 24 December 2024)
- IR 05000461/1981006 + (09:53:08, 24 December 2024)
- ML19347F810 + (09:53:09, 24 December 2024)
- ML19347F808 + (09:53:10, 24 December 2024)
- 05000334/LER-1981-037-01, /01P-0:on 810515 Chlorination of Main Unit Condenser Increased in Anticipation of High Chlorine Demand. Following Chlorination,Outfall Free Chlorine Concentration Exceeded Peak Allowable.Followup Rept Forthcoming + (09:53:12, 24 December 2024)
- ML19347F806 + (09:53:15, 24 December 2024)
- ML19347F805 + (09:53:16, 24 December 2024)
- ML19347F804 + (09:53:17, 24 December 2024)
- ML19347F803 + (09:53:18, 24 December 2024)
- ML19347F801 + (09:53:19, 24 December 2024)
- ML19347F802 + (09:53:19, 24 December 2024)
- ML19347F800 + (09:53:21, 24 December 2024)
- ML19347F799 + (09:53:22, 24 December 2024)
- ML19347F798 + (09:53:23, 24 December 2024)
- ML19347F796 + (09:53:33, 24 December 2024)
- ML19347F795 + (09:53:34, 24 December 2024)
- ML19347F794 + (09:53:35, 24 December 2024)
- ML19347F792 + (09:53:36, 24 December 2024)
- ML19347F793 + (09:53:36, 24 December 2024)
- ML19347F791 + (09:53:37, 24 December 2024)
- BSEP-81-1002, Thirty-day Nonroutine Radiological Environ Event Rept Re Cs-137 Activity at Milk Sampling Stations.Source of Activity Under Evaluation.Followup Rept Expected Soon + (09:53:38, 24 December 2024)
- TXX-3321, Submits Info Re Loose Parts Monitoring Sys,Per 810515 Telcon.Sys Designed to Operate in Normal Containment Environ.Sys Designed in Accordance W/Reg Guide 1.133 + (09:53:40, 24 December 2024)
- ML19347F788 + (09:53:42, 24 December 2024)
- ML19347F787 + (09:53:43, 24 December 2024)
- ML19347F786 + (09:53:45, 24 December 2024)