ML19347F839

From kanterella
Jump to navigation Jump to search
Responds to Generic Ltr 81-07, Control of Heavy Loads. Requests 810515 Implementation Date Be Changed to Allow for Complete Review of Existing Safe Load Paths,Procedures, Equipment & Personnel for Heavy Load Handling
ML19347F839
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/18/1981
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Ippolito T
Office of Nuclear Reactor Regulation
References
GL-81-07, JPN-81-37, NUDOCS 8105260440
Download: ML19347F839 (2)


Text

'

POWER AUTHORITY OF THE STATE OF NEW YORK 10 CoLuurus CincLE NEW Yonx, N. Y. toO19 (212) 397.6200 G EO R,G,E T,. S E R R Y open4rino orrican TRUSTEES

' " "".*ic"Nv's v"ce

" c" , , , *, , " , ' , , '

GEORGF. L. ING 4LLS

==-

vics cwainnease JOSEPH R. SCHMIEDER ass os e cMist RfCHARD M. PLYNN ROBERT 1. MILLONZ1 LEROY W. S.INCLA,IR May 18, 1981 n,;,,pu,,gion=r l rREoEmCic R. CLAR.c JPN-81-37 orrica. 1 THOM AS R. FREY

===' 1 Director of Nuclear Reactor Regulation g i U. S. Nuclear Regulatory Commission 4 D )

Washington, D. C. 20555 -p i I Attention: Mr. Thonas A. Ippolito, Chief !I 1 l

i Operauing Reactors Branch No. 2 i Division of Licensing - gg "9 2 I38I he. Q ,

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 J l Control of Heavy Loads (Generic Letter 81-07

  • fg g i

i

Dear Sir:

The subject letter requested the implementation of interim actions to control heavy loads by May 15, 1981. We request that this date be changed to allow more time to complete the review of our existing safe load paths, procedures, equipment and personnel '

1 for heavy load handling. We expect this review, which will deter-mine the extent of our present compliance with the interim action requirements, to be completed by July 1, 1981. We will submit a schedule for the implementation of any changes required to achieve full compliance with the interim action requirements by August 1, 1981. '

l l During the period prior to which we verify that the requested 1 interim actions have been fully implemented, it will be necessary )

for us to move heavy loads over safety related equipment and  ;

spent fuel. We must do this in order to complete structural I modifications in accordance with our commitments to the NRC and to prepare for the October 1, 1981 outage for refueling and installation of TMI modifications. Prior to the movement of any heavy load over safety related equipment or spent fuel, we will perfenn a safety analysis and prepare a written safety evaluation of the movement in accordance with 10CFR550.59.

l The subject letter also requires the submission of additional l l information in a six month report on June 22 and a nine month j report on September 22, 1981. We request that these dates be fDOI$

/0 8105260Qg

4 changed to September 1 and November 1 respectively. This will allow us to concentrate our full resources on~ verifying and achieving full compliance with the requested interim action re-quirements.

In accordance with the subject letter, following the sub-mission of these reports we will confirm implementation of the modifications required to satisfy NOREG-0612 or submit our just-ification for any modifications ' which we believe are unnece.ssary.

Very truly yours,.

h A(. l'DN .4L:$

J. P. Bayne -

1 Senior Vice President

, Nuclear Generation