Responds to IE Bulletin 79-14,Revision 2 Re Seismic Analysis of safety-related Piping.Per Review of marked-up Drawings, Supports Will Be Installed to Restore Intended Margin of Safety.Installation Complete
ML19347F794
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/25/1981
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-79-14, IEB-79-14-R2, LQA8100133, NUDOCS 8105260351
Download: ML19347F794 (1)


Text

y -

GENERAL OFFICE i* . Nebraska Public Power District ~*fel'e'dsMlo#'s#E7*^'"'

] '4:

LQA8100133 March 25, 1981 CENTRAL FILES PDR:H0 Mr. Karl V. Seyfrit, Director LPDR U.S. Nuclear Regulatory Commission g Office of Inspection & Enforcement .NSIC Region IV 611 Ryan Plaza Drive 3 Suite 1000

\\ /,

Arlington, Texas 76011

[.k /4

Subject:

IE Bulletin 79-14 " Seismic Analysis for s -

As-Built Safety-Related Piping Systems" I l q' \SS\ "

Reference:

1) Letter J. M. Pilant to K. V. Seyfrit y Ib,*e l p ,j Dated November 8, 1979, Same Subject  ; u.o q$g a /

e b> '*

2) Letter J. M. Pilant to K. V. Seyfrit ..

Dated March 25, 1981, "IE Bulletin 79-02 (Revision No. 2)" .

[ifY

Dear Mr. Seyfrit:

As indicated in Reference 1, marked up drawings of field verified dimen-sions, locations, etc., were sent to our architect-engineer for detailed review and were being assessed per the schedule provided. That schedule has been subject to the efforts required to complete work on IE Bulletin 79-02 (Reference 2). Our architect-engineer recommended that additional pipe supports be installed to restore the intended margin of safety.

These additional supports have been installed and all efforts on the subject bulletin have been completed.

As ucual, detailed documentation is available at Cooper Nuclear Station for NRC review (reference NCR 1167 and 2026).

Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> was used for the preparation of this response.

Sincerely, M

Jay M. Pilant Director of Licensing and Quality Assurance

~6 JMP:JDW:KJD:cmk cc: U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement Division of Reactor Operations Inspection Washington, DC 20555