f/6
[om\\..
UNITED STATES
8
3,
NUCLEAR REGULATORY COMMISSION
$
E
REGION lli
g[
799 ROOSEVELT ROAD
g
- .
GLEN ELLYN, ILLINOIS 60137
May 7, 1981
.lM t>
lh$[$'
25
pg
j
Docket No. 50-10
Docket No. 50-237
'
Q /g//
iJ -
Docket No. 50-249
f
n
/g / Id>
g' S
[
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
,
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. T. M. Tongue,
M. J. Jordan, and D. Robinson of this office on February 28 - April 3, 1981,
of activities at Dresden Nuclear Power Station, Units 1, 2, and 3, authorized
by NRC Operating Licenses No. DPR-02, No. DPR-19, and No. DPR-25 and to the
discussion of our findings with Mr. D. Scott and others of your staff at the
conclusion of the inspection.
The enclosed copy of our inspe'ction report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
The two apparent items of noncompliance identified in paragraph five of the
report will be addressed in separate investigation or inspection reports. No
other items of noncompliance were identified.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
.
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter.of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons on the basis which it is claimed that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
8195260tfyg
.
-
_
_
1
.
J
- -
-
Commonwealth Edison Company
~ -2-
May 7, 1981
in 10 CFR 2.790(b)(4). 'The information. sought to be' withheld shall'be
incorporated as far as possible ,into a separate aart of the affidavit.-
If
we do not hear from you in this regard within the specified periods'noted
,
above, a copy of this letter and the enclosed inspection report will be-
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
,
,
i
c.dldL'
L.
. F. Ifeishman, Acting irector
Division of Resident and Project
Inspection
Enclosure:
IE Inspection
Reports No. 50-10/81-05,
No. 50-237/81-11, and
No. 50-249/81-07
cc w/ enc 1:
J. S. Abel, Director
of Nuclear Licensing
D. J. Scott,
Station Superintendent
!
Central Files
-
Reproduction Unit NRC 20b
AE0D
j
Resident Inspector, RIII
t
.
.
Local PDR
,
l
'
Mary Jo Hurray, Office of
Assistant Attorney General
.
O
l
i