Forwards IE Insp Repts 50-010/81-05,50-237/81-11 & 50-249/81-07 on 810228-0403.Two Apparent Items of Noncompliance Re Personnel Overexposure Will Be Addressed in Separate Investigation or Insp Repts
ML19347F844
Person / Time
Site: Dresden  
Issue date: 05/07/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19347F845 List:
References
NUDOCS 8105260453
Download: ML19347F844 (2)


See also: IR 05000010/1981005

Text

f/6

[om\\..

UNITED STATES

8

3,

NUCLEAR REGULATORY COMMISSION

$

E

REGION lli

g[

799 ROOSEVELT ROAD

g

- .

GLEN ELLYN, ILLINOIS 60137

May 7, 1981

.lM t>

lh$[$'

25

pg

j

Docket No. 50-10

Docket No. 50-237

'

Q /g//

iJ -

Docket No. 50-249

f

n

/g / Id>

g' S

[

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

,

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. T. M. Tongue,

M. J. Jordan, and D. Robinson of this office on February 28 - April 3, 1981,

of activities at Dresden Nuclear Power Station, Units 1, 2, and 3, authorized

by NRC Operating Licenses No. DPR-02, No. DPR-19, and No. DPR-25 and to the

discussion of our findings with Mr. D. Scott and others of your staff at the

conclusion of the inspection.

The enclosed copy of our inspe'ction report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

The two apparent items of noncompliance identified in paragraph five of the

report will be addressed in separate investigation or inspection reports. No

other items of noncompliance were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

.

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter.of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

8195260tfyg

.

-

_

_

1

.

J

- -

-

Commonwealth Edison Company

~ -2-

May 7, 1981

in 10 CFR 2.790(b)(4). 'The information. sought to be' withheld shall'be

incorporated as far as possible ,into a separate aart of the affidavit.-

If

we do not hear from you in this regard within the specified periods'noted

,

above, a copy of this letter and the enclosed inspection report will be-

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,

,

i

c.dldL'

L.

. F. Ifeishman, Acting irector

Division of Resident and Project

Inspection

Enclosure:

IE Inspection

Reports No. 50-10/81-05,

No. 50-237/81-11, and

No. 50-249/81-07

cc w/ enc 1:

J. S. Abel, Director

of Nuclear Licensing

D. J. Scott,

Station Superintendent

!

Central Files

-

Reproduction Unit NRC 20b

AE0D

j

Resident Inspector, RIII

t

PDR

.

.

Local PDR

NSIC

,

l

TIC

'

Mary Jo Hurray, Office of

Assistant Attorney General

.

O

l

i