Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19354D761 + (21:30:49, 23 December 2024)
- ML19354D758 + (21:30:50, 23 December 2024)
- ML19354D754 + (21:30:54, 23 December 2024)
- ML19354D752 + (21:30:55, 23 December 2024)
- ML19354D751 + (21:30:56, 23 December 2024)
- ML19354D749 + (21:30:58, 23 December 2024)
- ML19354D748 + (21:30:59, 23 December 2024)
- ML19354D745 + (21:31:01, 23 December 2024)
- ML19354D746 + (21:31:01, 23 December 2024)
- ML19354D744 + (21:31:02, 23 December 2024)
- ML19354D743 + (21:31:03, 23 December 2024)
- 05000425/LER-1989-031, :on 891202,moisture Separator Reheater (MSR) Level Reached High Level Setpoint Giving Turbine/Reactor Trip.Caused by Personnel Error.Actuator Reinstalled W/ Actuator Piston Correctly Aligned + (21:31:04, 23 December 2024)
- 05000423/LER-1989-029, :on 891120,determined That Axial Flux Difference Monitoring Program Tilting Factors Not Operating Correctly.Caused by Procedural Inadequacy. Instructions Written Re Software Mods + (21:31:06, 23 December 2024)
- ST-HL-AE-3325, Special Rept:On 891121,generator Voltage Regulator Transformer in Standby Diesel Generator 22 Local Control Panel Overheated.Caused by Missing Insulation Between Transformer Core & Mounting Bolt.Transformer to Be Replaced + (21:31:07, 23 December 2024)
- IR 05000309/1989021 + (21:31:10, 23 December 2024)
- ML19354D737 + (21:31:12, 23 December 2024)
- 05000346/LER-1989-018, :on 891123,hydrogen Dilution Blower 1-1 Casing Drain Line Broke Off at Casing,Declaring Blower Inoperable. Caused by Drain Line Being Accidentally Stepped On.Drain Removed & Pipe Plug Installed + (21:31:13, 23 December 2024)
- ML19354D735 + (21:31:14, 23 December 2024)
- ML19354D730 + (21:31:16, 23 December 2024)
- ML19354D727 + (21:31:17, 23 December 2024)
- ML19354D725 + (21:31:18, 23 December 2024)
- ML19354D717 + (21:31:20, 23 December 2024)
- ML19354D718 + (21:31:20, 23 December 2024)
- B13382, Forwards Certification That fitness-for-duty Program Has Been Implemented at Facilities,Per 10CFR26.73(d).Attachment 1 Provides Brief Description of Major Facets of Program & Attachment 2 Provides Comparison of Drugs Tested + (21:31:22, 23 December 2024)
- ML19354D708 + (21:31:23, 23 December 2024)
- ML19354D707 + (21:31:25, 23 December 2024)
- ML19354D705 + (21:31:26, 23 December 2024)
- ML19354D706 + (21:31:26, 23 December 2024)
- ML19354D704 + (21:31:27, 23 December 2024)
- ML19354D703 + (21:31:28, 23 December 2024)
- TAC:65945 + (21:31:29, 23 December 2024)
- ML19354D701 + (21:31:30, 23 December 2024)
- ML19354D700 + (21:31:31, 23 December 2024)
- ML19354D699 + (21:31:32, 23 December 2024)
- JPN-89-083, Submits Revised Implementation Schedule for Rev 4 to Emergency Procedure Guidelines.New Schedule Allows Util to Make Transition During Outage & Return Plant to Power Using Single Rev of Emergency Operating Procedures + (21:31:33, 23 December 2024)
- ML19354D697 + (21:31:33, 23 December 2024)
- 3F1289-17, Certifies Implementation of fitness-for-duty Program That Meets Requirements of 10CFR26.Awareness Training,Escort Training & Supervisory Training Completed.Policies & Procedures for Implementing Subj Program Developed + (21:31:35, 23 December 2024)
- ML19354D694 + (21:31:37, 23 December 2024)
- ML19354D693 + (21:31:38, 23 December 2024)
- ML19354D692 + (21:31:39, 23 December 2024)
- TAC:72017 + (21:31:40, 23 December 2024)
- ML19354D690 + (21:31:41, 23 December 2024)
- ML19354D689 + (21:31:43, 23 December 2024)
- ML19354D687 + (21:31:44, 23 December 2024)
- ML19354D686 + (21:31:44, 23 December 2024)
- ML19354D685 + (21:31:45, 23 December 2024)
- ML19354D684 + (21:31:46, 23 December 2024)
- ML19354D681 + (21:31:47, 23 December 2024)
- ML19354D678 + (21:31:48, 23 December 2024)
- ML19354D677 + (21:31:50, 23 December 2024)
- ML19354D676 + (21:31:51, 23 December 2024)