Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000305/LER-1981-015, Forwards LER 81-015/03L-0 + (15:38:16, 23 December 2024)
- ML20004F013 + (15:38:18, 23 December 2024)
- L-81-231, Responds to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel).Neither Species Present in Cooling Canal Waters.Increased Prevention Unwarranted + (15:38:21, 23 December 2024)
- ML20004F009 + (15:38:23, 23 December 2024)
- ML20004F008 + (15:38:24, 23 December 2024)
- ML20004F007 + (15:38:24, 23 December 2024)
- ML20004F005 + (15:38:25, 23 December 2024)
- ML20004F006 + (15:38:25, 23 December 2024)
- ML20004F004 + (15:38:27, 23 December 2024)
- ML20004F003 + (15:38:28, 23 December 2024)
- ML20004F002 + (15:38:28, 23 December 2024)
- A01629, Submits Completion Date Schedules & Info Re Seismic re-evaluation Program Concerning SEP Topic III-6, Seismic Design Consideration, Per + (15:38:33, 23 December 2024)
- ML20004E999 + (15:38:38, 23 December 2024)
- ML20004F000 + (15:38:38, 23 December 2024)
- ML20004E998 + (15:38:39, 23 December 2024)
- ML20004E997 + (15:38:40, 23 December 2024)
- ML20004E996 + (15:38:41, 23 December 2024)
- ML20004E995 + (15:38:42, 23 December 2024)
- ML20004E993 + (15:38:43, 23 December 2024)
- ML20004E994 + (15:38:43, 23 December 2024)
- ML20004E992 + (15:38:44, 23 December 2024)
- ML20004E991 + (15:38:45, 23 December 2024)
- ML20004E990 + (15:38:45, 23 December 2024)
- ML20004E988 + (15:38:46, 23 December 2024)
- ML20004E989 + (15:38:46, 23 December 2024)
- AECM-81-191, Forwards Environ Sampling & Analysis 1979 & Environ Sampling & Analysis 1980 + (15:38:47, 23 December 2024)
- ML20004E985 + (15:38:49, 23 December 2024)
- IR 05000382/1981006 + (15:38:50, 23 December 2024)
- ML20004E983 + (15:38:52, 23 December 2024)
- ML20004E982 + (15:38:52, 23 December 2024)
- ML20004E981 + (15:38:53, 23 December 2024)
- ML20004E980 + (15:38:54, 23 December 2024)
- ML20004E974 + (15:38:55, 23 December 2024)
- 2CAN068106, Requests Approval for Unit 2 to Operate at 70% Power Until NRC Review of Matl Re Cycle 2 Reload Is Complete + (15:38:56, 23 December 2024)
- ML20004E970 + (15:39:04, 23 December 2024)
- ML20004E969 + (15:39:05, 23 December 2024)
- A01668, Discusses Implementation of TMI Action Plan,Item II.B.3, Post-Accident Sampling Capability, Per .Onsite Radiological & Chemical Analysis Capability Confirmed. Implementation Will Be Completed by 820101 Per + (15:39:06, 23 December 2024)
- ML20004E967 + (15:39:11, 23 December 2024)
- ML20004E966 + (15:39:18, 23 December 2024)
- L-81-232, Provides Addl Response to IE Bulletin 80-21 Re Use of Valve Parts Supplied by Malcolm Foundry Co,Inc in safety-related Sys.Two Vendors Do Not Use Any Parts Supplied by Malcolm Foundry + (15:39:19, 23 December 2024)
- 05000029/LER-1981-008-01, /01T-0:on 810527,mechanical Damage to Fuel Cladding Discovered During Visual Exam of Fuel Assemblies for Core XIV-XV Refueling.Caused by Fretting Damage to Clad Due to Pin Vibration.Pins to Be Replaced W/Dummy Pins + (15:39:22, 23 December 2024)
- IR 05000352/1981005 + (15:39:25, 23 December 2024)
- ML20004E960 + (15:39:27, 23 December 2024)
- 05000029/LER-1981-008, Forwards LER 81-008/01T-0 + (15:39:29, 23 December 2024)
- ML20004E957 + (15:39:31, 23 December 2024)
- ML20004E955 + (15:39:32, 23 December 2024)
- 05000271/LER-1981-012-03, /03L-0:on 810512,shock Suppressor on Main Steam D Piping Found W/No Visible Fluid in Site Glass Resulting in Failure to Lock Up within Procedural Tolerance When Tested in as-found Condition.Cause Not Determined + (15:39:34, 23 December 2024)
- ML20004E953 + (15:39:35, 23 December 2024)
- ML20004E952 + (15:39:36, 23 December 2024)
- ML20004E950 + (15:39:37, 23 December 2024)
- 05000271/LER-1981-012, Forwards LER 81-012/03L-0 + (15:39:39, 23 December 2024)