Forwards IE Insp Rept 50-352/81-05 on 810309-13.No Noncompliance Noted
ML20004E955
Person / Time
Site: Limerick Constellation icon.png
Issue date: 05/20/1981
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20004E956 List:
References
NUDOCS 8106160233
Download: ML20004E955 (2)


See also: IR 05000352/1981005

Text

.

_

..

1

-

.

,

pnneay',

,/

o

UNITED STATES

f

' ,i

'

NUCLEAR REGULATORY COMMISSION

s

j

REGION I

$

631 PARK AVENUE

.....',e

%,

,o

KING OF PRUSSIA, PENNSYLVANIA 19406

Docket No. 50-352

I. LAY E O '.131

et 1 s 'n

Philadelphia Electric Company

y

j %.

T ^

([ /*f.fh,/'Q

ATTN: Mr. John S. Kemper

4s

Vice President

Wu

Engineering and Research

4'.,l 5 gg7Ng

'

2301 Market Street

u , Mip g

Philadelphia, Pennsylvania

19101

,\\

'% '% C-

Gentlemen:

s(.\\

-G9

%7VSNNy

Subject:

Inspection 50-352/81-05

This refers to the routine inspection conducted by Mr. A. D. Sassani, Jr., of

this office on March 9-13, 1981 of activities authorized by NRC License No.

CPPR-106 at Limerick Generating Station, Unit No.1, Limerick, Pennsylvania

and to the discussions of our findings held by Mr. Sassani with Mr. G. Lauderback,

Jr., and others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Irspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of precadures

and representative records, interviews with personnel, and observations by the

'

inspector.

Within the scope of this inspection, no items of nor: compliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

--

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure. Any

such application must be accompanie i by an affidavit executed by the owner of

the information, which identifies tna document ,or part sought to be withheld,

and which contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subparagraph (b)

(4) of Section 2.790. The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear

from you in this regard within the specified period, the report will be placed

in the Public Document Rocm.

.

h\\\\

610616O W

Q

.

_

.

.

.

.

. _ . -

T

..

.:

- " *

-

' ^ -

'

.

.

-

,

}

.

i

,.

.

Philadelphia Electric Company

2

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

m

Thomas T. Martin, Chief, Engineering

Inspection Branch, Division of

Technical Inspection

Enclosure: Office of Inspection and Enforcement Inspection

Report No. 50-352/81-05

cc w/ encl:

V. S. Boyer, Senior Vice President, Nuclear Power

!

--