ML20004F008
| ML20004F008 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 05/26/1981 |
| From: | Nunn D SOUTHERN CALIFORNIA EDISON CO. |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8106160379 | |
| Download: ML20004F008 (1) | |
Text
90 9 Southern California Edison Company
_c;;3 P O O Cs X 8 00 22 44 W ALN UT GROVE AVENU E ROSEME AD. CALIFORNI A 91770 D. E. N U N N gaggemong asanaes s. ovaug, assumance gain,,,.ases May 26, 1981 c3, M TAM Mr. R. H. Engelken, Director 1
Office of Inspection and Enforcement x
U. S. Nuclear Regulatory Commission
.A D
N Region V
[ y.h,, U h.
h Suite 202, Walnut Creek Plaza t
J -'
I 1 -
1990 North California Boulevard JUll 151981
- r.
Walnut Creek, California 94506 u.s m m,
'-3 '
3
Dear Mr. Engelken:
,. s,/
Subj ect:
Docket Nos. 50-361 and 50-362
\\,'/
'S..
San Onofre Nuclear Generating Station, Units 2'an This letter confirms verbal notification on May 22, 1981 of a condition discovered in construction which is con-sidered potentially reportable in accordance with 10CFR50.55(e).
The condition concerns the separation of a blade from a CEDM cooling fan which was due to a fatigue crack in the area of a casting flaw at the stressed surface of the blade.
We are performing an evaluation of this condition and will submit an appropriate report in accordance with 10CFR50.55-(e)(3) if the condition is determined to be reportable.
If you have any questions or require additional information, please let me know.
Very truly yours,
~
4 AN R. J. Pate (NRC, San Onofre Units 2 and 3) gv$0 cc:
i Dr. L. T. Papay t110616 8 3 7 9
- , c3
_