Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000348/LER-1981-007-01, /01T-0:on 810402,mathematical Sign Error Was Found in Load Summation in Turbine Driven Auxiliary Feedwater Pump Nozzle Load Design Analysis.Caused by Designer Error. Seismic Restraint Mod Made + (07:22:06, 23 December 2024)
- 05000267/LER-1981-020-03, /03L-0:on 810226,primary Coolant Moisture & Oxidants Exceeded Limits.Caused by Circulator Buffer Sys Upset & Helium Circulator Trip Due to 810223 Reactor Scram. Reactor Power Reduced Until Moisture Level Decreased + (07:22:08, 23 December 2024)
- ML20008F685 + (07:22:10, 23 December 2024)
- ML20008F683 + (07:22:11, 23 December 2024)
- 05000348/LER-1981-007, Forwards LER 81-007/01T-0 + (07:22:13, 23 December 2024)
- 05000267/LER-1981-020, Forwards LER 81-020/03L-0.Detailed Event Analysis Encl + (07:22:15, 23 December 2024)
- ML20008F678 + (07:22:16, 23 December 2024)
- ML20008F675 + (07:22:17, 23 December 2024)
- ML20008F673 + (07:22:20, 23 December 2024)
- ML20008F669 + (07:22:23, 23 December 2024)
- ML20008F670 + (07:22:23, 23 December 2024)
- ML20008F668 + (07:22:25, 23 December 2024)
- AECM-81-135, Forwards Clarifications & Exceptions to ANSI N18.1-1971 Re Selection & Training of Nuclear Power Plant Personnel.Review & Reply Requested + (07:22:26, 23 December 2024)
- ML20008F665 + (07:22:27, 23 December 2024)
- B10170, Submits Info Re Revision 4 to Facility Modified Amended Security Plan.Info Withheld (Ref 10CFR2.790) + (07:22:28, 23 December 2024)
- ML20008F663 + (07:22:30, 23 December 2024)
- ML20008F661 + (07:22:36, 23 December 2024)
- 05000267/LER-1981-021-03, /03L-0:on 810302,liquid Nitrogen Storage Tank Level Lower than Tech Spec Requires.Caused by Sys Usage & Unavailable Recondensers.Level Restored W/Two Loads + (07:22:37, 23 December 2024)
- ML20008F658 + (07:22:38, 23 December 2024)
- 05000267/LER-1981-021, Forwards LER 81-021/03L-0.Detailed Event Analysis Encl + (07:22:40, 23 December 2024)
- 05000327/LER-1981-036-03, /03L-0:on 810320,remote Shutdown Monitoring Channel for Steam Generator 4 Pressure Declared Inoperable. Caused by Blown Fuse in Loop Power Supply.Fuse Replaced + (07:22:42, 23 December 2024)
- 05000327/LER-1981-036, Forwards LER 81-036/03L-0 + (07:22:44, 23 December 2024)
- 05000267/LER-1981-017-03, /03L-0:on 810217,standby Diesel Engine 1B Tripped on High Cooling Water Temp.Caused by Sticking Temp Control Valve.Valve Disassembled,Cleaned & Returned to Svc + (07:22:46, 23 December 2024)
- 05000267/LER-1981-017, Forwards LER 81-017/03L-0 + (07:22:48, 23 December 2024)
- ML20008F646 + (07:22:49, 23 December 2024)
- 05000333/LER-1981-025-03, /03L-0:on 810323,while Conducting Surveillance During Normal Operation,Reactor Water Level Switch Found Set Contrary to Tech Specs.Caused Attributed to Instrument Drift.Switch Adjusted & Weekly Surveillance Performed + (07:22:51, 23 December 2024)
- 05000333/LER-1981-025, Forwards LER 81-025/03L-0 + (07:22:55, 23 December 2024)
- 05000255/LER-1981-012-01, /01T-0:on 810331,safety Injection Tank T-82A Level Decreased Below Requirements.Caused by Leaking Safety Injection Control Valve PCV-3042.Valve Will Be Repaired + (07:23:01, 23 December 2024)
- ML20008F636 + (07:23:03, 23 December 2024)
- 05000267/LER-1981-019-03, /03L-0:on 810220,plant Operated in Degraded Mode to Repair Pressure Control Valve PV-21243-1.Caused by Excessive Leakage Through 1/2-inch Masoneilan Pressure Control Valve.Valve Stroke Lengthened.Seat & Stem Replaced + (07:23:06, 23 December 2024)
- 05000267/LER-1981-019, Forwards LER 81-019/03L-0.Detailed Event Analysis Encl + (07:23:10, 23 December 2024)
- ML20008F629 + (07:23:12, 23 December 2024)
- ML20008F627 + (07:23:13, 23 December 2024)
- ML20008F626 + (07:23:13, 23 December 2024)
- ML20008F625 + (07:23:14, 23 December 2024)
- ML20008F624 + (07:23:15, 23 December 2024)
- ML20008F623 + (07:23:16, 23 December 2024)
- AECM-81-140, Forwards Revised Emergency Procedures EP-1 Through EP-9 Which Reflect Agreements Reached at 810226-27 Meeting W/Nrc & During 810309-10 Simulator Demonstrations.Atws Procedure Will Be Submitted by June 1981 + (07:23:17, 23 December 2024)
- ML20008F621 + (07:23:19, 23 December 2024)
- ML20008F619 + (07:23:20, 23 December 2024)
- ML20008F618 + (07:23:21, 23 December 2024)
- ML20008F617 + (07:23:22, 23 December 2024)
- ML20008F616 + (07:23:23, 23 December 2024)
- ML20008F614 + (07:23:24, 23 December 2024)
- ML20008F613 + (07:23:25, 23 December 2024)
- ML20008F612 + (07:23:26, 23 December 2024)
- ML20008F610 + (07:23:27, 23 December 2024)
- ML20008F608 + (07:23:28, 23 December 2024)
- ML20008F607 + (07:23:29, 23 December 2024)
- TAC:43369 + (07:23:30, 23 December 2024)
- ML20008F605 + (07:23:31, 23 December 2024)