Metrorcditan Edison Company Post Office Box 480 e
Middletown, Pennsylvania 17057 717 9444041 wnter's onct o o %,r,oer April 1/+, 1981 C h, LlL 111
[
/7 Office of Nuclear Reactor Regulations
[
Attn: John Stolz, Chief f
=
Operating Reactors Branch !.
l5], i. P R 2 Q }9 8 j > 11 U. S. Nuclear Regulatory Co==ission p m s, Washington, D.C.
20555 omaa
%s
Dear Sir:
A
[c
' N1 Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Vendor Review of Procedares Ite= 1.C.7 of NURE.G 0660 specifies that operating license applicants obtain reactor vendor review of their low-power, power-ascension, and e=ergency procedures. Since Dil-1 is an operating reactor it has already co=pleted an initial low-power and power-ascension test progra= and exer-cised the procedures associated with those activities then and during the four refuelings.
GPU Nuclear believes it is appropriate to approach the restart in a =anner similar to the initial startup program. For the original startup of mI-l a Test Working Group (WG) was for=ed.
The purpose of the WG was to review the startup procedures for low-power and power-ascension tests that were conducted. B & W was represented on the TWG and the B & W WG =e=ber provided B & W input to the review of the procedures including,as appropriate,co==ents fro = the B & W ho=e office. GPU Nuclear intends to use the WG concept again for ntI-1 I.. start and has re-established the WG.
B & W is again represented on the WG.
In addition to the above, CPU Nuclear established a progra= with B & W in March 1981 for B & W to review and co_ ent on selected MI-l e=ergency l
procedures where their input would be =eaningful, his e=ergency procedure review progra= will be an ongoing progra= until UI-1 is restarted. To l
date we have received and are considering co==ents on all procedures which l
have becn forwarded to B & W for review. It is also possible that additional procedures including ATOG procedures will be identified for B & W revicw before co=pletion of this progra=,
ne above progra=s are auditable by the NRC at any time.
Sincerely,
,I-3
. wt
- n. D.
..J N111 Director, IMI-1 l
HDH:CWS:vjf
'y
)
I cc:
D. DiIanni R. Jacobs H. Silver
e~ccc a,8 sen Ccmcry s a t.'eme' f me Gererr Et c u = tes S,s:em 810421o m p
,