Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PM-81-291, Forwards Monthly Operating Rept for Mar 1981 + (07:21:11, 23 December 2024)
- ML20008F732 + (07:21:11, 23 December 2024)
- ML20008F729 + (07:21:13, 23 December 2024)
- ML20008F725 + (07:21:17, 23 December 2024)
- PM-81-292, Forwards Monthly Operating Rept for Mar 1981 + (07:21:18, 23 December 2024)
- 05000265/LER-1981-006-03, /03L-0:on 810312,differential Pressure Between Drywell & Suppression Chamber Was Lost.Caused by Isolation of Differential Pressure Sys Due to Short in Electrical Circuit Resulting in Blown Fuse.Fuse Replaced + (07:21:24, 23 December 2024)
- 05000265/LER-1981-006, Forwards LER 81-006/03L-0 + (07:21:25, 23 December 2024)
- 05000298/LER-1981-002-03, /03L-0:on 810213,brass Filings Found in Oil Sump of Outboard Motor Bearing of RHR Svc Water Booster Pump. Caused by Loose Inboard Motor Fan & Set Screw.Fan Repaired & Second Set Screw Added + (07:21:27, 23 December 2024)
- ML20008F718 + (07:21:28, 23 December 2024)
- 05000298/LER-1981-002, Forwards LER 81-002/03L-0.Detailed Event Analysis Encl + (07:21:30, 23 December 2024)
- ML20008F714 + (07:21:34, 23 December 2024)
- 05000267/LER-1981-018-03, /03L-0:on 810214,sample Flow Alarm Setpoints of Three Dewpoint Moisture Monitors Found Outside Tech Spec. Probably Caused by Previous Misadjustment.Trip Points Readjusted + (07:21:36, 23 December 2024)
- ML20008F712 + (07:21:38, 23 December 2024)
- 05000267/LER-1981-018, Forwards LER 81-018/03L-0.Detailed Event Analysis Encl + (07:21:39, 23 December 2024)
- ML20008F708 + (07:21:41, 23 December 2024)
- 05000298/LER-1981-003-03, /03L-0:on 810223,RHR-MO-26B Motor Amps Increased & Remained Excessively High When Valve Reached Closed Position.Caused by Limit Switch on Limitorque SMB-O Valve Motor Operator Not Opening & de-energizing Starter + (07:21:42, 23 December 2024)
- ML20008F706 + (07:21:45, 23 December 2024)
- ML20008F705 + (07:21:46, 23 December 2024)
- 05000298/LER-1981-003, Forwards LER 81-003/03L-0.Detailed Event Analysis Encl + (07:21:47, 23 December 2024)
- ML20008F701 + (07:21:50, 23 December 2024)
- A810014, Responds to NUREG-0737 Items II.K.3.16 & 18 Re Reduction of Challenges & Failures of Relief Valves & Mod to Automatic Depressurization Sys Logic,Respectively + (07:21:53, 23 December 2024)
- 05000254/LER-1981-007-03, /03L-0:on 810313,no Position Indication Found on Recirculation Pump 1A Discharge Valve MO-1-202-5A.Caused by Tripped Valve Motor Breaker Due to Several Shorted Conductors in Cable 12507 Leading to Valve Inside Drywell + (07:21:56, 23 December 2024)
- ML20008F698 + (07:21:58, 23 December 2024)
- 05000254/LER-1981-007, Forwards LER 81-007/03L-0 + (07:21:59, 23 December 2024)
- RBG-10-034, Final Deficiency Rept Re Incorrect Input to Finite Element Model Used to Calculate Amplified Floor Response Spectra of Reactor Bldg,Initially Reported on 800912.Concludes Condition Not Reportable Per 10CFR50.55e + (07:22:00, 23 December 2024)
- ML20008F694 + (07:22:02, 23 December 2024)
- ML20008F693 + (07:22:04, 23 December 2024)
- ML20008F691 + (07:22:04, 23 December 2024)
- ML20008F689 + (07:22:05, 23 December 2024)
- 05000348/LER-1981-007-01, /01T-0:on 810402,mathematical Sign Error Was Found in Load Summation in Turbine Driven Auxiliary Feedwater Pump Nozzle Load Design Analysis.Caused by Designer Error. Seismic Restraint Mod Made + (07:22:06, 23 December 2024)
- 05000267/LER-1981-020-03, /03L-0:on 810226,primary Coolant Moisture & Oxidants Exceeded Limits.Caused by Circulator Buffer Sys Upset & Helium Circulator Trip Due to 810223 Reactor Scram. Reactor Power Reduced Until Moisture Level Decreased + (07:22:08, 23 December 2024)
- ML20008F685 + (07:22:10, 23 December 2024)
- ML20008F683 + (07:22:11, 23 December 2024)
- 05000348/LER-1981-007, Forwards LER 81-007/01T-0 + (07:22:13, 23 December 2024)
- 05000267/LER-1981-020, Forwards LER 81-020/03L-0.Detailed Event Analysis Encl + (07:22:15, 23 December 2024)
- ML20008F678 + (07:22:16, 23 December 2024)
- ML20008F675 + (07:22:17, 23 December 2024)
- ML20008F673 + (07:22:20, 23 December 2024)
- ML20008F669 + (07:22:23, 23 December 2024)
- ML20008F670 + (07:22:23, 23 December 2024)
- ML20008F668 + (07:22:25, 23 December 2024)
- AECM-81-135, Forwards Clarifications & Exceptions to ANSI N18.1-1971 Re Selection & Training of Nuclear Power Plant Personnel.Review & Reply Requested + (07:22:26, 23 December 2024)
- ML20008F665 + (07:22:27, 23 December 2024)
- B10170, Submits Info Re Revision 4 to Facility Modified Amended Security Plan.Info Withheld (Ref 10CFR2.790) + (07:22:28, 23 December 2024)
- ML20008F663 + (07:22:30, 23 December 2024)
- ML20008F661 + (07:22:36, 23 December 2024)
- 05000267/LER-1981-021-03, /03L-0:on 810302,liquid Nitrogen Storage Tank Level Lower than Tech Spec Requires.Caused by Sys Usage & Unavailable Recondensers.Level Restored W/Two Loads + (07:22:37, 23 December 2024)
- ML20008F658 + (07:22:38, 23 December 2024)
- 05000267/LER-1981-021, Forwards LER 81-021/03L-0.Detailed Event Analysis Encl + (07:22:40, 23 December 2024)
- 05000327/LER-1981-036-03, /03L-0:on 810320,remote Shutdown Monitoring Channel for Steam Generator 4 Pressure Declared Inoperable. Caused by Blown Fuse in Loop Power Supply.Fuse Replaced + (07:22:42, 23 December 2024)
- 05000327/LER-1981-036, Forwards LER 81-036/03L-0 + (07:22:44, 23 December 2024)