ML20008F729
| ML20008F729 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/06/1981 |
| From: | Culver M FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20008F726 | List: |
| References | |
| NUDOCS 8104210550 | |
| Download: ML20008F729 (4) | |
Text
.
OPERATING DATA REPORT DOCKET NO.
50-302 DATE h/6/81 COMPLETED BY Mx culver TELEPHONE (Ooh) 705-6h86 OPERATING STATUS Note 5
- 1. Unit Name:
Crystal River Unit 3
- 2. Reporting Period:
3/1/81 - 3/31/81 2452
- 3. Licensed Thermal Power (MWI):
890
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
825
- 6. Maximum Dependable Capacity (Gross MWe): _._
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
N/A NOU*
- 9. Power Lesel To which Restricted.lf Any Net MWe):
one
- 10. Reasons For Restrictions.If Any:
This Month Yr..to.Date Cumulative 7hk 2260 35520
- 11. Hours In Reporting Pen. d o
- 12. Number Of Hours Reactor Was Critical 0
0 1129 22
- 13. Reactor Reserve Shutdown Hours 444 1563 5 20948.66
- 14. Hours Generator On.Line 0
0 0
- 15. Unit Reserve Shutdown Hours 10h3552 3675526.3 46353936
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 355645 1263683 2 15767614
- 18. Net Electrical Energy Generated (MWH) 338588 1202672 14946242 59.7%
73.3%
58.96%
- 19. Unit Service Factor 59 7%
73.3%
56 965
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 58.2%
71.2%
53.65 55 2%
67.5%
51.09
- 22. Unit Capacity Factor (Using DER Net) 27.49%
9 67, 27.61%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):
Refteling outage starting 9/19/61 a-2 lasting approxn.ately 12 weeks.
h/6/81
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior Io Commercial Operation):
Forecast Achiesed 1/1k /II INITIA L CRITICALITY 1/30/77 INITIA L ELECTRICITY COMM EllCI AL OPER ATION 3/13/77
("/77 8 8 10421 05 50
DOCKET NO.
50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE h/6/81 COMPLETED BY M-u_
N1 vy REPORT MONTil March TELEPHONE (90h) 795 6h86 d
T
-c 4 s.n :
=.
Licensee 5-r, E *.
Cause & Carrective e,
.E E E
4 No.
liste i
58 4
.5 i $
Event u7 81 Action to f3 5
3 5 e-Report #
iA U hO Present Recurrence v
y e
Q 81-16 810301 S
131.7 A
1 N/A CB PUMPXX Continuation of RCP seal outage from last month.
81-17 810317 F
37.1 G
3 N/A IA CKTBRK While performing a surveillance pro-cedure, an instrument technician accidentally opened CRI! Breaker "A" with CRD Breaker "B" already open.
This resul.ted in an automatic reactor /
81-18 810326 F
131.2 A
1 N/A RC FUELXX Plant was shut down due to a loose part in steam generator B2.
The part has been tentatively identified as a control rod guide tube nut.
l I
2 3
4 F: Forced Reason:
Methtml:
Exhibit G-Instructions 5 Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram.
Entry Sheets for Licemce C Refueling
- 3. Automatic Scram.
Event Pepori ti.ERI File tNIIRI G-D Regulatory Restriction 4-Ot her ( Explain) 0161) li-Operator Training & License Fxamination F Administrative 5
I sinbit
- S ime Sonice G. Operational Liror (Explain) l'8/77)
Il-Ot her t INplain t
AVERAGE TAILY UNIT POWER LEVEL 50-302 DOCKET NO.
(
UNIT
- FLCRP-3 k/1/01 DATE M. W. Culver COMPLETED BY (90h) 795-6486 TELEPlf0NE e
MONTH March DAY
, AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
(Mwe.Neti
.h86 O
17 I
o 0
2 502 3
19 780' 0
4 20 0
795 5
21 794 191 22 6
79h 625 23
(
7 803 808 24 a
789
'l76 25 9
hol 795 Io 26 0
796 27 11 0
800 28 12 0
791 29 13 0
793 14 30 o
793 3,
15 795 16 INSTRUCTIONS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole rnegawart.
?
(9177)
MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE h/6/81 COMPLETED BY M. W. Culver TELEPHONE (90h) 795-6h86 March, 1981 MONTH
SUMMARY
STATEMENT:
The unit began the month with a continuation of an outage from last month. Two additional outages were experienced during the remainder of March.
1
_