Memorandum & Order Granting Pl Hourihan 800811 Petition to Intervene,Approving Parties 801212 Stipulation Re Contentions & Discovery,Admitting Intervenor Contentions 1, 5,6B,7 & 8 & Denying Contentions 6A,14,17,18,23A & B & 28
ML20008F701
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/16/1981
From: Lazo R
Atomic Safety and Licensing Board Panel
To: Hourihan P
AFFILIATION NOT ASSIGNED
Shared Package
ML20008F702 List:
References
ISSUANCES-OL, NUDOCS 8104210518
Download: ML20008F701 (10)


Text

'

J e

4 s* %

N e"*'c

'/

UNITED STATES OF AMERICA s

8

/

\\\\

NUCLEAR REGULATORY COMMISSION APR1 gg, @

hd(.]~W

~7 l. d d' k ff g.,;,

2 0 /Sg7 ATOMIC SAFETY AND LICENSING BOARD W

ly Before Administrative Judges e'

\\p

,"/

Robert M. Lazo, Esq., Chainnan

.,, '.'/

,s Qs Richard F. Cole, Ph.D

/2,T@-

A. Dixon Callihan, Ph.D SERVED APRLygg In the Matter of Docket Nos. STN 50-528-OL STN 50-529-OL

~~

ARIZONA PUBLIC SERVICE COMPANY, Et A1.

STN 50-530-OL.

(Palo Verde Nuclear Generating Station.

Units 1, 2 and 3 Operating License

)

Proceeding)

)

)

April 16, 1981 MEMORANDUM AND ORDER 1.

BACKGROUND On July 25, 1980, the U.S. Nuclear Regulatory Comission (the.Coarnission) published in the Federal Register a notice of receipt of an application for facility operating licenses for Palo Verde Nuclear Generating Stations Units 1, 2 and 3 and notice of opportunity for hearing (45 Fed. Reg. 49732).1/ Such licenses would authorize Arizona Public Service Company, Salt River Project Agricultural Improvement and Power District, Southern California Edison Company, El Paso Electric Company, Public Service Company of New Mexico and Arizona Electric Power Cooperative, Inc., (Joint Applicants) to possess, use and operate Palo Verde Nuclear Generating Station, Units 1, 2 and 3, three pressurized water nuclear reactors (the facilities) located on the Joint Applicants' site in Maricopa County, Arizona, approximately 36 miles west of the City of Phoenix.

1/ The July 25, 1980, notice is a clarification of an earlier notice published in the Federal Register (45 Fed. Reg. 46941-43) en July 11, 1980 ON 8104210Qf9

The notice of opportunity for hearing provided that any person whose interest may be affected by this proceeding may file a petition for leave-to intervene in accordance with the Comission's Rules of-Practice (10.CFR 2.714).

In response to this notice, on August 11, 1980, Patricia Lee Hourihan submitted a timely petition for leave to intervene and a request-for hearing in the above -

i' identified matter for herself as well as on behalf of two other persons, Kevin Dahl and Christopher Shuey. On Novunber 21, 1980, Ms.- Hourthan filed a Supplement to Petition for Leave to Intervene and Cententions (Supplement) setting torth 28 contentions.

On December 2, 1980, a prehearing conference was held before this Atomic

+:

Safety and Licensing Board (Board) to consider the petition for. leave to intervene and to pennit identification of the issues in this proceeding. At the prehearing conference, the Board orally granted the petiticn for leave to intervene as to Ms. Hourihan, thereby making her a full party to this proceeding.E (Ms. Hourihan hereinafter will be referred to as "Intervenor.")

-At the aforementioned prehearing conference the parties--Intervenor,-

Joint Applicants, and the NRC Staff--indicated that they would confer in an effort to arrive at a stipulation regarding the language of Intervenor's remaining contentions.M uch a stipulation was executed and filed with the S

Board on December 12, 1980.

With regard to the Intervenor's contentions not withdrawn in the prehear-ing conference, the stipulation indnates that the Intervenor further withdrew Contentions Nos.. 3, 9, 10, 15, 16. 20, 21 and 22 from-Intervenor's November 21, 1980 2/ Tr. 16.

7/ Tr. 30. During the course of the discussion of Intervenor's contentions at the prehearing conference, Intervenor withdrew Contentions Nos. 19, 24, 25 and 27 (Tr. 30, 32).

. Supplement and formed from the renalning contentions a group-of reworded contentions which all the parties agreed were valid contentions (Appendix A to the ntipulation) and a group of reworded contenticas that the parties were not able to agree were valid contentions (Appendix B).

Joint Applicants and the NRC Staff have each filed written responses to the disputed contentions.

In the view of the Staff, only Contention 68 of the contentions set forth in Appendix B to the Stipulation should be accepted as a valid contention in this proceeding. Joint Applicants oppose each of the disputed contentions. By Order dated January 5,1981, the Board afforded the Intervenor the opportunity until January 20, 1981, to respond in writing to any contention which has been objected to by Joint Applicants or the Staff.- No response by Intervenor has been received.

~

II. CONTENTIONS Upon consideration of the filings by the petiticner and the other parties, this Board concludes that a hearing is warranted and that it should uanfirm its earlier oral ruling that Ms. Hourihan should be admitted as a party to the j

proceeding. Her petition provides sufficient assartion of her interest and she I

has submitted admissible contenticas which identify specific aspects of the subject matter of the proceeding as to which she wishes to intervene. Accord-l ingly, the Board will grant the petition for leave to intervene filed by l

Ms. Hourihan. Neither Mr. Dahl nor Mr. Shuey h.ve requested party status, thus Ms. Hourihan will be the sole intervenor in this proceeding.5/

l l

l 3/ Tr. 12 l

l l

l

s Further., the Board has concluded that it should approve the December 12, 1980 " Stipulation of Parties Regarding Contentions and Discovery." By so~doing

- the Board accepts as issues in centreversy in this proceeding three safety contentions (Contentions Nos.1, 7 and 8) and one environmental contention (ContentionNo.5).

l Appendix B to the Stipulation sets forth three safety contentions (Con.

tententions Nos. 6B,17 and 23A) and five 'nvironmental contentions (Conten- -

i e

tions Nos. 6A 14,18, 238 and 28) that the parties were not able to agree.

were admissible contentions. We will address each of these in turn.

CONTENTION NO. 6A The Applicants have not analyzed the financial consequences 1

of an Anticipated ~ Transient Without Scram (ATWS) event which can result in a Class 9 accident. [By this contention, Inter-venor is not limiting the area of the contention to only ATWS l

events that could lead to Class 9 accidents.]

1 l

The Intervenor in this contention raises the issue that the potential l

dollar costs resulting from the consequences of an ATWS event (including an ATWS event that could lead to a Class 9 accident) have not been considered by the Joint Applicants.

The Commission recently issued an interim policy statament entitled

" Nuclear Pcwer Plant Accident Cor. sideration Under the National Environmental Policy Act of 1969" (45 Fed. Reg. 40101, Jane 13, 1980), which revised Commission policy on the consideration of envirgnmental impacts arising from

~-,

..-,c.-

,n

=. - -..., -.,,--

' i more severe very low probability accidents (Class 9 accidents) that are physically impossible. / The interim policy statement provides:

It is the Comission's position that its Environmental

)

Impact Statement shall include considerations of the site-specific environmental impacts attributable to accident sequences that lead to releases of radiation 4

i and/or radioactive materials, including sequences that can result in inadequate coaling of reactor fuel and to melting of the reactor core.

However, this interim policy statement applies to the Staff only and not to the Joint Applicants. Only applicants who file their environmental reports after July 1,1980, are required to address such Class 9 risks.

(45 Fed. Reg. 40103). The Applicant's environmental report was submitted on December 5,1979.

Even if the centention were reworded to assert that the Staff had failed to take into account the costs of the referenced ATWS events it still must fail, at least for now. The contention is premature and in addition fails to meet the specificity requircents of 10 C.F.R. 52.714. Accordingly, it cannot be admitted.

CONTENTION NO. 6B l

The Applicants have not incorporated measures 1

designed t- -itigate a postulated ATWS event.

I The Appeal Board has made it clear that " unresolved" issues such as ATWS cannot be disregarded in individual licensing proceedings because they have generic applicability. Virginia Electric and power Company (North Anna Nuclear Power Station, Units 1 and 2) ALAB-491, 8 NRC 245, 248 (1978) The Appeal r

l Board added:

"There must be some explanation why construction or operation can proceed even though an overall solution has not been found." (Id.)

l 5/ This policy will be applied to the Staff's environmental assessment of Palo Verde Nuclear Generatirg Station since it is an ongoing review.

See Fed. Reg. 40101, at 40103.

I

. - =.

..m-~

._.~_____..___. _ _,

. - _,.. - - -. -. _ - _. -. - _ _ _ - - _... _ - -. _ ~

. In Northern States Power Com::any, (Monticello Nuclear Generating Plant,. Unit 1),

ALAB-611, slip op, at 19 (September 3, 1980) the Appeal Board stated that the Licensing Board must look at the record and assure itself that "the generic safety issues have been taken into account in a manner that is at least plausible and that, if proven to be of substance, would be adequate to justify operation.

Thus the basic matter set out in the contention must be dealt with in this proceeding. The issut to be dealt with under this contention wculd be (a) have the Joint Applicantsincorporated measuras to deal with ATWS events in their Palo Verde facility, and if not (b) does this pose a safety question that would fore-closeissuinganoperatinglicenseforthefacility.O I

For the above reasons the Board finds this contention to be admissible.

CONTENTION NO. 14 1

The Applicants have failed to show the effects of cum ~ lative u

radiation on the Primary System of the PVNGS and the likelihood l

that these effects will not shorten the life-span of the plant.

i This contention is not admissible for the reason that it fails to meet l

the bases and specificity requirements of 10 C.F.R. 12.714. The Intervenor states no basis for the contention. Furthemore, it is not clear from the contention what " effects" are of concern to the Intervenor and how these effects will lead to a shortening of the life of the Palo Verde Nuclear Station so as to be of concern in this licensing proceeding.

l l

6/ Should the Connission resolve the ATWS issue or other generic questions by rule or regulation, such action would be binding on this Board and j

prevent litigation of this matter. See 10 C.F.R. 12.758.

l l

. QNTENTIONNO.17 The Applicants have failed to adequately consider the report on " Spent Fuel Heat Up Following the loss of Water During Storage" prepared by the Sandia Laboratories for the NRC in September of 1978 (SAND 77-1371).

This contention is unacceptable for the reason the Intervenor has failed to provide a basis with reasonable specificity as required by 10 C.F.R. 12.714.

There is no showing how the cited report relates to the Palo Verde Station or why such report should be considered by the Joint Applicants.

CONTENTION NO. 18 The Applicants have not adequately figured the costs and imoacts of storage or disposal of spent fuel and other radioactive wastes, for the tem of the operating licenses, in the cost / benefit analysis.

This contention is too vague to be admissible.

It fails to meet the specificity and bases requirement of 10 C.F.R. 5 2.714. Principally, it is not clear what issue the Intervenor is asking the Board to accept for litigation. Moreover, it is not clear what " impacts" are referred to.

CONTENTION NO. 23A The Applicants have not adequately considered the effects of on-site sabotage.

The Board recognizes the difficulty that an intervenor has with regard to asserting a contention on the security plan for a nuclear reactor with sufficient basis and specificity to satisfy the requirements of 10 C.F.R. 52.714, since tne security plan is not available to the intervencr. The Board, however, does not believe thac the basis ciced by the Intervence in l

l l

. the support of this contention, the general availability of the Barrier Penetra-tien Handbook, is sufficient in spite of this difficulty. The basis cited for such a cc..tention should be site spr!:ific, i.e., stating specific reasons why a security plan may not be adequate for this particular station. The mere avail-ability of a Handbook giving the times certain types of physical barriers can resist penetration, does not show that the security at the plant is insufficient.

Further, the nexus between this book dealing with barrier penetration, i.e., an attack on a plant from outside and, on-site sabotage is not apparent. The conten-tion is not admissible.

CONTENTION NC. 223

~

The Applicants have not adequately considered the economic cost effects of off-site sabotage.

This contention is unacceptable for the reason that it fails to satisfy the " basis" and " specificity" requirements of 10 C.F.R. 52.714. The simple assertion that the. transmission line routes are public and that transmission l

line tewers can be toppled easily does not support the contention. The

(

Intervenor has failed to indicate any reason why she believes that such i

l sabotage will occur at the Palo Verde Station or that it can have any substan-t tial effect en the economic viability of the facility. The statements in the Intervenor's " Explanation" are, in essence, nothing more than speculation.

l l

CONTENTION NO. 28 The cost of PVNGS outweighs the cost of alternative sources of energy. The Applicants have not sufficiently met the requirements of 10 C.F.R. 51.21. The Applicants have failed to shew the alternative available to meet i

Arizona's energy needs.

1 i

e m

a

.g.

This contention lacks the basis and specificity required by 10 C.F.R. 12.714.

It is (lothing more than a collection of bare assertionsthat the costs of PViiGS outweigh the costs of alternatives, that Joint Applicants have not met the requirements of 10 C.F.R.151.21, and that Joint Applicants have failed to discuss the available alternatives to PGilS. There is no basis stated to support any of these assertions. The construction permit Final Environmental Impact Statement did consider various alternatives and their costs relative to PVNGS (FES, September 1975, Chapter 9) and the Licensing Board evaluated that discus-sion(LBP-76+21,3NRC662,690-593,(1976)).

Furthermore, the Intervenor has not indicated how the Joint Applicants have failed to meet 10 C.F.R. 850.21.

In sum, the Intervenor has totally failed to show how the consideration of alterna-tives to PVNGS has been deficient. Accordingly, the contention lacks the required basis and specificity and is not admissible in this proceeding.

III. ORDER For all the foregoing reasons and based upon a consideration of the entire record in this matter it is this 16th day of April,1981 ORDERED l.

The Petition For Leave To Intervene in this proceeding by Patricia Lee Hourihan is granted; 2.

The Stipulation of Parties Regarding Contentions and Discovery, dated December 12, 1980, is approved; 3.

Intervencr's Contentions Nos.1, 5, 6B, 7 and 8 are admitted as issues in controversey in this proceeding; and

. 4.

Intervenor's Contentions Nos. 6A,14,17,18, 23A, 238 and 28 are rejected A notice of hearing implementing this decision is appended to this Memorandum and Order as Attachment A.

Judge Richard F. Cole and Judge A. Dixon Ca111han, Members of the Board, join in this Memorandum and Order.

~

FOR THE ATOMIC SAFETY AND LICENSING BOARD RMs. la Robert M. Lazo 4

Administrative Judge I