Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20011D269 + (09:42:36, 21 December 2024)
- ML20011D267 + (09:42:37, 21 December 2024)
- ML20011D268 + (09:42:37, 21 December 2024)
- B13418, Provides Addl Info Re Atws/Auxiliary Feedwater Sys,Per Isap Topic 1.16.Several Design Features of Power Supply Prevent Damage to Inverters,Independent of Circuit Breakers at Inverter Panels + (09:42:38, 21 December 2024)
- ML20011D265 + (09:42:40, 21 December 2024)
- 05000295/LER-1989-024-02, :on 891117,question Raised Re Operability of Aircraft Craft Crash Dampers in Closed Position.Caused by Reliance on Undocumented Belief.Inconsistency Between Tech Spec & FSAR Re Ventilation Will Be Resolved + (09:42:43, 21 December 2024)
- ML20011D261 + (09:42:47, 21 December 2024)
- ML20011D260 + (09:42:48, 21 December 2024)
- ML20011D258 + (09:42:49, 21 December 2024)
- PNO-IV-89-072, on 891221,darkroom Encl of Licensee Vehicle, Containing 75 Ci Ir-192 Source,Blown from Truck Bed During 40-50 Mph Winds.Insp Revealed No Apparent Damage to Locking Mechanism or Fittings for Control Cables or Guide Tubes + (09:42:51, 21 December 2024)
- ML20011D256 + (09:42:52, 21 December 2024)
- ML20011D255 + (09:42:52, 21 December 2024)
- 05000382/LER-1989-022, :on 891128,plant Operated in Condition Prohibited by Tech Specs When Emergency Diesel Generator a Inoperable More than 24 H.Caused by Personnel Error.Ltr Issued to All Shift Supervisors + (09:42:54, 21 December 2024)
- TAC:73190 + (09:42:55, 21 December 2024)
- ML20011D253 + (09:42:56, 21 December 2024)
- ML20011D251 + (09:42:58, 21 December 2024)
- 05000368/LER-1989-023-01, :on 891117,approach to Criticality Commenced After Seventh Refueling Outage W/Logarithmic Power Level Channels Inoperable.Caused by Electrical Noise in Circuitry. Defective Preamplifier Replaced + (09:43:02, 21 December 2024)
- ML20011D249 + (09:43:03, 21 December 2024)
- ML20011D248 + (09:43:05, 21 December 2024)
- ML20011D246 + (09:43:06, 21 December 2024)
- ML20011D245 + (09:43:06, 21 December 2024)
- ML20011D244 + (09:43:07, 21 December 2024)
- ML20011D241 + (09:43:08, 21 December 2024)
- ML20011D243 + (09:43:08, 21 December 2024)
- IR 05000445/1989081 + (09:43:09, 21 December 2024)
- ML20011D238 + (09:43:11, 21 December 2024)
- 05000322/LER-1989-009, :on 891115,notification Received of Potential Failure Mechanism of Four 3-way Solenoid Operated Pilot Valves.Caused by Incorrect Mounting of Valves.Valves Remounted Vertically & Field Walkdown Done + (09:43:12, 21 December 2024)
- IR 05000298/1989034 + (09:43:14, 21 December 2024)
- ML20011D234 + (09:43:15, 21 December 2024)
- 05000277/LER-1989-029-01, :on 891117,Group III Primary Containment Isolation Sys Actuation Occurred During Refueling Floor Ventilation Exhaust Radiation Monitor Testing.Cause Unknown. Test Procedure to Be Revised + (09:43:17, 21 December 2024)
- 05000414/LER-1989-020-01, :on 891111,low Filtered Exhaust Flow Discovered by Control Room Operators During Observation of Indications. Caused by Design Oversight Re Interaction of Sys/Components. Clothes Dryer Filters to Be Modified + (09:43:19, 21 December 2024)
- 05000213/LER-1989-021, :on 891120,concluded That Nonseismic Seal Water Injection Lines Provided Potential for Loss of Containment Integrity.Caused by Original Design Bases.New Check,Two Isolation,Vent & Drain Valves Installed + (09:43:21, 21 December 2024)
- ST-HL-AE-3308, Special Rept:On 891029 & 1104,Train C of Reactor Vessel Water Level Sys Observed Alternating Indicating Wet & Dry Conditions in Display Processing Sys in Control Room.Caused by Failure of Fiber Optic Link.Fiber Optic Modum Replaced + (09:43:22, 21 December 2024)
- 05000352/LER-1989-057, :on 891120,refuel Floor Secondary Containment Isolated on Low Flow Differential Pressure,Causing Initiation of Standby Gas Treatment Sys.Caused by Severe Storm.Normal Ventilation Restored to Floor + (09:43:24, 21 December 2024)
- 05000325/LER-1989-023, :on 891116,reactor Shutdown When Drywell to Suppression Chamber Vacuum Breaker Opened.Caused by Excessive Vibration & Lack of Proper Space Between Actuator Arm & Piston.Procedures Will Be Revised + (09:43:33, 21 December 2024)
- 05000311/LER-1989-023-02, :on 891116,radiation Monitoring Sys Channel 2R12A Failed Low Resulting in ESF Actuation Signal.Caused by Poor Pin Contact W/Control Module.Pin Found Bent & Loose. Pushed Pins & Remote Control Module Replaced + (09:43:35, 21 December 2024)
- IR 05000397/1989035 + (09:43:37, 21 December 2024)
- ML20011D221 + (09:43:38, 21 December 2024)
- ML20011D220 + (09:43:42, 21 December 2024)
- 05000311/LER-1989-022-02, :on 891117,determined That Control Power Lockout Circuit for RHR Pump Cold Leg Discharge Valves Did Not Meet Single Failure Criteria.Caused by Inadequate Review.Enhanced Training Program Continuing + (09:43:43, 21 December 2024)
- ML20011D216 + (09:43:47, 21 December 2024)
- ML20011D217 + (09:43:47, 21 December 2024)
- ML20011D214 + (09:43:48, 21 December 2024)
- ML20011D213 + (09:43:49, 21 December 2024)
- ML20011D210 + (09:43:50, 21 December 2024)
- ML20011D209 + (09:43:51, 21 December 2024)
- ML20011D208 + (09:43:52, 21 December 2024)
- ML20011D207 + (09:43:52, 21 December 2024)
- ML20011D204 + (09:43:53, 21 December 2024)
- ML20011D205 + (09:43:53, 21 December 2024)
- ML20011D201 + (09:43:54, 21 December 2024)