Text
'
. -
?)
l
l
-
DEC 181989
,
.
Docket No. 50-29
Yankee Atomic Electric Company
!- '
. ATTN: -Mr. Normand N. St. Laurent
Acting Manager of Operations
580 Main Street
Bolton, Massachusetts 01740-1398
Gentlemen:
,
Subject: Systemat;c Assessment'of Licensee Performance (SALP) Final Report
e
,
No. 50-29/88-99
This letter forwards the final Yankee Nuclear Power Station SALP Report (En-
!
closure 1) for the period of April 1,1988 through July 31, 1989. The report
-is based on the SALP Board Report forwarded to you by my October 16, 1989
'
letter (Enclosure 2) and on your November 10, 1989 comments (Enclosure 3).
~
The SALP was discussed with you on October 23, 1989 at Yankee Nuclear Power
Station in Rowe, Massachusetts (meeting attendees are listed in Enclosure 4).
We believe that the discussion improved mutual understanding of your activities
and of-our SALP program.
,
Evaluation of your SALP comments resulted in a minor change to the Safety
Assessment / Quality Verification analysis for the reasons stated in Enclosure
3.
In particular, revised Page 26 is transmitted with the final report. The
SALP. rating did not change.
Our overall assessment is.that the Yankee Nuclear Power Station operated safely
and conservatively during the SALP period.
,
No reply to this letter is required. Thank you for your cooperation.
-
Sincerely,
Original D16094 y
.
WILLIAll T, NE D
William T. Russell
Regional Administrator
Enclosures:
1.
Systematic Assessment of Licensee Performance Final Report
50-29/88-99
2.
Letter, W. Russell to N. St. Laurent dated October 16, 1989
3.
Letter, N. St. Laurent to W. Russell, dated November 10, 1989
4.
October 23, 1989 Meeting Attendees
0FFICIAL RECORD COPY
DL50-29/88-99 FINAL - 0001.0.0
22 g gk $ h{
gp
12/06/89
.
_
.
k
'ag
,.
e
>
C' [
' Yankee Atomic Electric Company
2
DEC 1B1980
cc w/encls:
Dr. Andrew C. Kadak, President & Chief Operating Officer
T. Henderson, Acting Plant Superintendent
G. Papanic, Jr., Senior Project Engineer - Licensing
P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts
C. Sterzinger, Commissioner, Vermont Department of Public Service
t
Chairman Carr
'
Commissioner Roberts
Commissioner Rogers
Commissioner Curtiss
Commissioner Remick
K. Abraham, PAO, RI (21 copies)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
State of Vermont
bec w/ enc 1:
Region I Docket Room (with concurrences)
W. Russell, RA
W. Hodges, DRS
M. Knapp, DRSS
J. Taylor, EDO
T. Martin, DRA
D. Holody, RI
J. Lieberman, OE
SALP Management Meeting Attendees
M. Conner, TSS-
M. Perkins, DRMA (w/o enc 1)
R. Blough, DRP
H. Eichenholz, SRI - Yankee (w/ concurrences)
G. Grant, SRI - Vermont Yankee
M. Fairtile, NRR
J. Johnson, DRP
J. Dyer, EDO
RL f
R DRA
RI:RA g(/
RI:DRP
RI
Blough/meo
[shns
ehj
artj
Russell
'
n' )l i
ik/>
12/ g /89
R-llf D-
[
OFFICIAL RECORD COPY
DL50-29/88-99 FINAL - 0002.0.0
12/06/89
1