Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20023D528 + (06:08:03, 21 December 2024)
- ML20023D529 + (06:08:03, 21 December 2024)
- 05000338/LER-1983-022, Forwards LER 83-022/03L-0 + (06:08:05, 21 December 2024)
- 2CAN048304, Submits Third Monthly Status Rept Re Regulatory Response & Commitment Control Program.Info Consists of Progress Made in Areas of Verification of Implementation of Commitments Since 790101 & Procedure Rev Tracking + (06:08:06, 21 December 2024)
- LD-83-046, Forwards Amended Table 3-1 of Section II.F.2,App B Reflecting Clarification of Addressing TMI Action Item II.F.2 Re Inadequate Core Cooling Detection Instrumentation, Open Item 4 of CESSAR-F SER + (06:08:08, 21 December 2024)
- ML20023D522 + (06:08:08, 21 December 2024)
- ML20023D520 + (06:08:11, 21 December 2024)
- IR 05000369/1983018 + (06:08:12, 21 December 2024)
- ML20023D515 + (06:08:13, 21 December 2024)
- ML20023D514 + (06:08:14, 21 December 2024)
- 05000387/LER-1983-063-03, /03L-0:on 830411,main Steam Line Drain Valve Leakage Exceeded Tech Spec Limit.Cause Not Stated.Seal Ring Replaced,Outboard Valve Lapped & Valves Reassembled + (06:08:19, 21 December 2024)
- ML20023D511 + (06:08:20, 21 December 2024)
- ML20023D510 + (06:08:21, 21 December 2024)
- ML20023D507 + (06:08:24, 21 December 2024)
- 05000387/LER-1983-063, Forwards LER 83-063/03L-0 + (06:08:25, 21 December 2024)
- ML20023D503 + (06:08:26, 21 December 2024)
- ML20023D502 + (06:08:26, 21 December 2024)
- 05000289/LER-1983-012-03, /03L-0:on 830406,while Performing Functional Testing of Hydraulic Snubbers,Snubber MS-209 Failed to Lock in Tension Direction.Caused by Damaged Piston Seal Ring. Snubber Overhauled & Tested Satisfactorily + (06:08:28, 21 December 2024)
- ML20023D499 + (06:08:29, 21 December 2024)
- ML20023D498 + (06:08:30, 21 December 2024)
- 05000289/LER-1983-012, Forwards LER 83-012/03L-0 + (06:08:31, 21 December 2024)
- ML20023D492 + (06:08:37, 21 December 2024)
- ML20023D490 + (06:08:40, 21 December 2024)
- 0CAN048321, Forwards Revised Schedule for Completion of Licensing Procedures Upgrade,Per Regulatory Response & Commitment Control Program.Delay Due to Continuing Support Requirements for Unit 1 Outage.Upgrade to Be Completed by 830527 + (06:08:41, 21 December 2024)
- ML20023D488 + (06:08:43, 21 December 2024)
- 05000311/LER-1983-014, Forwards LER 83-014/03L-0.Detailed Event Analysis Encl + (06:08:45, 21 December 2024)
- ML20023D482 + (06:08:46, 21 December 2024)
- ML20023D481 + (06:08:47, 21 December 2024)
- B10790, Interim Significant Deficiency Rept SD-36 Re Design & Const in Main Control Board Welds.Initially Reported on 830413. Meeting W/Util & Engineer Scheduled for 830517 to Discuss Necessary Corrective Actions + (06:08:48, 21 December 2024)
- 05000309/LER-1982-037, Forwards Evaluation Summary Rept & Resolution of LER-82-037/03L-0 Re Shock Suppressor Bushing Failures.Lab Analysis Revealed Torrington Ball Bushings Mfg from Brittle AISI 5160 Steel.Brushing Replaced + (06:08:53, 21 December 2024)
- ML20023D472 + (06:08:54, 21 December 2024)
- ML20023D469 + (06:08:55, 21 December 2024)
- 05000416/LER-1983-052, Forwards LER 83-052/03L-0 + (06:08:57, 21 December 2024)
- ML20023D464 + (06:08:58, 21 December 2024)
- ML20023D462 + (06:08:59, 21 December 2024)
- ML20023D463 + (06:08:59, 21 December 2024)
- ML20023D460 + (06:09:00, 21 December 2024)
- ML20023D461 + (06:09:00, 21 December 2024)
- ML20023D459 + (06:09:01, 21 December 2024)
- 05000395/LER-1983-036-03, /03L-0:on 830414,during Performance of Channel Calibr,Pressurizer Safety Valve Position Indication on Valves Failed to Function Properly.Caused by Excessive Current Flow During Contact Closure.Switch Assembly Changed + (06:09:02, 21 December 2024)
- ML20023D455 + (06:09:03, 21 December 2024)
- ML20023D454 + (06:09:03, 21 December 2024)
- IR 05000483/1983003 + (06:09:04, 21 December 2024)
- ML20023D451 + (06:09:06, 21 December 2024)
- 05000395/LER-1983-036, Forwards LER 83-036/03L-0.Detailed Event Analysis Encl + (06:09:07, 21 December 2024)
- IR 05000346/1982025 + (06:09:09, 21 December 2024)
- IR 05000454/1982017 + (06:09:10, 21 December 2024)
- ML20023D443 + (06:09:11, 21 December 2024)
- ML20023D440 + (06:09:12, 21 December 2024)
- ML20023D438 + (06:09:13, 21 December 2024)
- PNO-I-83-049, all Licensee Commitments Required for Restart Completed.Actions to Assess & Mitigate Svc Water Biofouling in Support of Plant Heatup Anticipated to Occur on 830518 Completed + (06:09:15, 21 December 2024)