Fourth Interim Deficiency Rept Re Implementation of QA Test Documentation on Radiation Monitoring Equipment.Initially Reported on 820824.GA Technologies Will Field Test Monitor & Rewrite Test Travelers.Next Rept by 831228
ML20023D522
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 05/11/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8305200569
Download: ML20023D522 (1)


Text

' I, TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 374o1 400 Chestnut Street Tower II May 11, 1983 co c.o BLRD-50-438/82-62 Z

BLRD-50-439/82-55 D

ha Y

5

-.~m 2,

a U.S. Nuclear Regulatory Commission 5

m2 Region II OS Attn: Mr. James P. O'Reilly, Regional Administrator o.,

101 Marietta Street, NW, Suite 2900 7

Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - QA TEST DOCUMENTATION ON RADIATION MONITORING EQUIPMENT - BLRD-50-438/82-62, BLRD-50-439/82 FOURTH INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector F. Cantrell on August 24, 1982 in accordance with 10 CFR 50.55(e) as Audit 82V-29, Deficiencies 3 and 4.

This was followed by our interim reports dated September 22, and November 9, 1982, and January 10, 1983 Enclosed is our fourth interim report. We expect to submit our next report by December 28, 1983 If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY l

L. M. Mills,1 Manager Nuclear Licensing

(

Enclosure oc: Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 i

l Records Center (Enclosure)

Institute of Nuclear Power Operations l

1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 hCgL CM y-3Sg[oo S

An Equal Opportunity Employer L_

ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 QA TEST DOCUMENTATION ON RADIATION MONITORING EQUIPMENT AUDIT 82V-29, DEFICIENCIES 3 AND 4 BLRD-50-438/82-62, BLRD-50-439/82-55 10 CFR 50.55(e)

FOURTH INTERIM REPORT Description of Deficiencies During th'e TVA audit of GA Technologies, Inc. (formerly General Atomic Company), San Diego, California,:the following deficiencies were noted in the implementation of their previously accepted QA program for TVA contracts:

Deficiency 3 Contrary to section 11, paragraph 5 3, of GA Technologies' QA manual, a test operator did not completely record the test results for a radiation monitor (TVA item 03513501-001) already shipped to TVA for use at Bellefonte.

Deficiency 4 Contrary to ANSI N45.2, section 18, which requires results of inspections to be identifiable and retrievable from records storage, QA records from GA Technologies' Cimex facility do not provide for the required identification and retrievability of inspection results.

GA Technologies has also supplied radiation monitoring equipment for other TVA nuclear plants.

Interim Progress Concerning incomplete test results, GA Technologies has examined their documentation, and having determined this to be an isolated case, will field test the one monitor with incomplete test documentation at a date still to be determined. To prevent recurrence of this problem, GA Technologies has rewritten their test travelers to provide for this activity as a separate traveler operation.

Concerning the QA recorda identified in deficiency 4, GA Technologies has performed training for the Cimex QC inspector and is properly maintaining their records. Also, the batch numbering practice is satisfactory.

However, a statement by G. A. Technologies that missing traveler package documentation noted during the audit was a random error was found to be incorrect. Subsequently, GA Technologies has been requested to provide definite corrective action and recurrence control for this problem.