VERMONT YANKEE NUCLEAR POWER CORPORATION 2.C.2.1 FVY 83-37 RD 5, Box 169 Ferry Road, Brattleboro, VT 05301 g
y\\
ENGINEERING OFFICE 1671 WORCESTER ROAD FRAMINGHAM, MASS ACHUSETTS 01701 TELEPHONE 617-877-8100 May 17, 1983 United States Nuclear Regulatory Commission Washington, D. C. 20555 Attention:
Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Goerating Reactors Branch No. 2 Division of Licensing Refercaces:
(a) License No. DPR-28 (Docket No. 50-271)
(b) Letter, USNRC to VYNPC, " Order for Modificarian of License", dated Jaaaacy 18, 1981 (c) Letter, USNRC to VTNPC, " Order for Modificatio1 of license', dated January 14, 1982 (d) Letter, USNRC to VYNPC, " Amendment Number 24 to Fucility Opereting License", dated July 19, 1916 Mbject:
Safety-Related Shock Suppressors (Snubbers)
Dear Sir:
Reference (b), as amended by Reference (c), requires that we complete any modifications necessary to assure that our facility conforms to the Acceptance Criteria contained in Appendix A to NUREG-0661, prior to startup from our present refueling outage.
.$.s a part of this overall effort, we have installed additional safety-related shock suppressors to increase the load carrying capability of certain piping systems to withstand torus induced hydrodynamic loads, as called for by our Mark I Containment Program. The analysis which determined the need for the additional shock suppressors also resulted in a need to replace certain shock suppressors with rigid restraints; while one other was determined to be no longer necessary.
The purpose of this letter is to provide you with the enclosed list of additions and deletions of safety-related shock suppressors. Since safety-related shock suppressors are listed in facility Technical Specifications (Table 4.6.2), we will be submitting a formal request for amending our Technical Specifications to reflect these changes.
Pending the approval of our amendment request by the NEC, we will institute the same operating and surveillance requirements for the new shock suppressors as exist in present Technical Specifications. These operating and surveillance f000 8305200517 830517 fi PDRADOCK05000g P
United States Nuclear Regulatory Commission May 17, 1983 Attention:
Mr. Domenic B. "assalo Page 2 requirements have been previously reviewed and approved by the NRC by Reference-(d). Our amendment request will not call for revising these requirements, but snerely update Table 4.6.2 to reflect the presently installed shock suppressors.
It is our intent to submit a proposed change to facility Technical Specifications by June 1, 1983. Should you have any questions in this matter, please contact us.
Very truly yours, VERMONT YANKEC NUCLEAR POWER CORPORATION 77C b2/&
e J.
B.' Sinciair I.; censing Engineer JES/cs 4
d j
.__ _ ~ _,
- - ~,,,..
,r.,
e.
LIST OF ADDITIONS AND DELETIONS OF SAFETY-RELATED SHOCK SUPPRESSORS Additions Deletions RHR - H98 CS - H85 RHR - HD127L CS - H86A RHR - ID127M CS - H86B RHR - HD134 RHR - HT218'4B C5 - HD54.
CS - IID54H CS - HDS6C CS - HD90C t
u i
i i
i i
e t
l i
i
,, -,, ~ -
..m
.,r
--w pr--,,--g wg-e---. - -- - - - - -
,,,-.,e4,
,,.e
~n,-re
,we
, e
-,--n--,----
,+-,--,,,,,,-,-+,,,-n--~,-v r---we,, -, -