ML20023D455

From kanterella
Jump to navigation Jump to search

Responds to NRC Re Violations Noted in IE Insp Rept 50-346/82-25.Advises That Response Will Be Submitted by 830301.Delay Due to Number of Organizations Involved in Preparation of Response
ML20023D455
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/18/1983
From: Crouse R
TOLEDO EDISON CO.
To: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20023D448 List:
References
1-320, TAC-51965, NUDOCS 8305200514
Download: ML20023D455 (1)


Text

ii, ;eq TOLEDO h EDISON ROiAAo P. CROUSE Docket No. 50-346 VuPmem Nuceer License No. NPF-3 Serial No. 1-320 January 18, 1983 Mr. C. E. Norelius, Director Division of Engtaeering and Technical Ptogrema Uaited States Nuclear Regilatory Coaalssinn Region III 799 Roosevelt Road Glen Ellyn, Illinois 601.37

Dear Mr. Keppler:

This is in reference to your letter datd Deccaber 21, 1.982 ilcg 1-718),

containing Inspection Report. 82-25.

This report providad restits, of inspections performed at Dtvis-Nesse Nuclear Power Station, Unit 1-Tne appendix of this it.spection renort contained a Notice of Violatica requiring a written response.

The issue identified in the Notice of Violation is presently being eva'.uated, Due to the number of different organizationt involved in preparing Tcledo Edison's response to this notice, it will not be possible to meet the requested January 20, 1983 date. This has been di:; cussed with the NRC Resident Inspector.

Toledo Edison's response will be submitted no later than March 1, 1983.

Very truly yours, R P h fp RPC:SCJ:JAE cc: